Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Charlotte Storm Water Services / Construction

Collective X (Multiple Isolated Storm Drainage Improvements Projects)

  • Posting Number: 2024-Q3(Jul-Sep)-CSWS-11749
  • Anticipated Posting Date: 2024-07-14
  • Last Updated: 11/15/23
Add to Calendar 2024-07-14 2024-07-14 Collective X (Multiple Isolated Storm Drainage Improvements Projects)

This project consists of multiple isolated storm drainage improvements projects located throughout the City of Charlotte. Projects include storm drainage replacement and sewer relocations within the street right-of-way and private, residential properties.

In Development

Charlotte Storm Water Services / Construction

Fawnbrook Ln (514) Storm Drainage Improvement Project

  • Posting Number: 2024-Q3(Jul-Sep)-CSWS-3475
  • Anticipated Posting Date: 2024-07-04
  • Last Updated: 11/15/23
Add to Calendar 2024-07-04 2024-07-04 Fawnbrook Ln (514) Storm Drainage Improvement Project

The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

In Development

Aviation / Construction

4th Parallel Runway Package 2: Runway

  • Posting Number: 2024-Q3(Jul-Sep)-AVI-12920
  • Anticipated Posting Date: 2024-08-30
  • Last Updated: 10/30/23
Add to Calendar 2024-08-30 2024-08-30 4th Parallel Runway Package 2: Runway

As part of the Fourth Parallel Runway Program at CLT, this construction package will include the construction of new Runway 1C-19C and its connector taxiways.  The project includes erosion and sedimentation control, grading, drainage, fencing, vehicle service roads, miscellaneous utilities, airfield concrete and asphalt paving, marking, airfield lighting/signage, and approach lighting infrastructure.

In Development

Aviation / Construction

Aircraft Rescue and Firefighting Facility (ARFF)

  • Posting Number: 2024-Q3(Jul-Sep)-AVI-12926
  • Anticipated Posting Date: 2024-08-30
  • Last Updated: 10/11/23
Add to Calendar 2024-08-30 2024-08-30 Aircraft Rescue and Firefighting Facility (ARFF)

This project will construct a new Aircraft Rescue and Firefighting Facility (ARFF) at Charlotte Douglas International Airport.  The facility will be constructed in a green field site within the airfield.  The general scope of the project includes site preparation (grading and drainage), building construction, HVAC, plumbing, asphalt parking lot and roadway paving, electrical, and associated utilities.

In Development

Aviation / Construction

4th Parallel Runway Package 4: NAVAIDs

  • Posting Number: 2024-Q3(Jul-Sep)-AVI-12924
  • Anticipated Posting Date: 2024-08-30
  • Last Updated: 10/11/23
Add to Calendar 2024-08-30 2024-08-30 4th Parallel Runway Package 4: NAVAIDs

To support CLT’s Fourth Parallel Runway Program, this project will include the installation of Navigational Aids (NAVAIDs) for the new Fourth Parallel Runway. To support the new Runway 1C-19C, the project requires construction of glide slope, localizer, approach lighting systems, and all associated support structures, access roads, and infrastructure.  The general scope of this bid package includes demolition, erosion and sedimentation control, grading, drainage, airfield electrical, vehicle service roads, and utilities.

In Development

Charlotte Storm Water Services / Construction

Craighead/Tryon Storm Drainage Improvement Project

  • Posting Number: 2024-Q3(Jul-Sep)-CSWS-11515
  • Anticipated Posting Date: 2024-09-04
  • Last Updated: 10/11/23
Add to Calendar 2024-09-04 2024-09-04 Craighead/Tryon Storm Drainage Improvement Project

The Craighead/Tryon Storm Drainage Improvement Project is bordered by Glory Street to the north, Little Sugar Creek to the south, Sugar Creek Road to the east and Craighead Road to the west. The existing drainage system consists of pipe system under city-maintained road, state-maintained road, and private property. The improvements include pipe system upgrades.

In Development

Charlotte Storm Water Services / Construction

Barrington Drive 5919 Storm Drainage Improvement Project

  • Posting Number: 2024-Q3(Jul-Sep)-CSWS-7056
  • Anticipated Posting Date: 2024-09-17
  • Last Updated: 09/18/23
Add to Calendar 2024-09-17 2024-09-17 Barrington Drive 5919 Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

In Development

Charlotte Storm Water Services / Construction

Collective AE Storm Drainage Improvement Project

  • Posting Number: 2024-Q3(Jul-Sep)-CSWS-12652
  • Anticipated Posting Date: 2024-09-04
  • Last Updated: 09/12/23
Add to Calendar 2024-09-04 2024-09-04 Collective AE Storm Drainage Improvement Project

Collective Storm Drainage Improvement Projects Series AE will involve 3 projects throughout the City of Charlotte, 3880 Jeff Adams Dr, 4440 Holbrook Dr, 4611 Denver Av Phase 2. 3880 Jeff Adams Dr will consist of lining approx. 562 LF 54″ CMP with CIPP. Also to include lining 12″ and 15″ systems that tie into main 54” system. We will also be doing invert repair in 54″ pipe where it has eroded. This project will need traffic control along Jeff Adams during construction and foundation protection on the permanent structure located on site. MH and DI adjustments are included in this scope along with asphalt resurfacing around them. 4440 Holbrook Dr scope will include installation of approx. 165LF 30″ RCP; 65LF 36″ RCP; 110LF 29×45 Elliptical pipe; 11LF 24″ RCP; 12LF 18″ RCP; 28LF 15″ RCP. Approx 200 LF of 30” RCP and 15” RCP will be removed and another approx. 200LF of RCP is to be plugged and abandoned. Scope also intends to replace approx. 105LF of sewer with 8” DIP and replace (2) sewer manholes. Storm drainage structure replacement, foundation protection, asphalt resurfacing and curb and gutter replacement to also be included. 4611 Denver Av Phase 2 scope will include removal of approx. 75 LF of duel 60” CMP and installation of 65LF of a 10×5 RCBC. Project to include approx. 314 LF of sewer replacement and (6) MHs. Scope also to include conc headwalls and full depth pavement resurfacing.

In Development

Charlotte Storm Water Services / Construction

Collective AF Storm Drainage Improvement Project:

  • Posting Number: 2024-Q3(Jul-Sep)-CSWS-12654
  • Anticipated Posting Date: 2024-09-03
  • Last Updated: 09/05/23
Add to Calendar 2024-09-03 2024-09-03 Collective AF Storm Drainage Improvement Project:

Collective Storm Drainage Improvement Projects Series AF will involve 3 projects throughout the City of Charlotte 6112 Bridlewood Ln, 6108 Bridlewood Ln, 6032 Bridlewood Ln. 6112 Bridlewood Ln will consist of lining approx. 149 LF 15” RCP; 243 LF 30” RCP; 151 LF 36” RCP with CIPP. Scope also includes replacing rerouting the existing system into the r/w and adding approx. 177 42” RCP and 122 LF of 34×53 elliptical pipe and storm drainage structure replacement. There will also be approx. 418 LF of sewer replacement with 8” DIP. Pavement resurfacing and curb and gutter replacement are also to be included in this project. 6108 Bridlewood Ln will consist of removing an existing CMP pipe and replacing with approx. 31 LF of 9×7 RCBC. A temporary pedestrian bridge will be added to cross the creek during time of construction for the property owners. The scope is also to include approx. 31LF of 15” RCP replacement along with replacement of (1) CB, concrete driveway replacement, curb and gutter and pavement resurfacing. There will also be grading around the existing creek that will tie into (2) new HWs. 6032 Bridlewood Ln will consist of removing an existing CMP pipe and replacing with approx. 30 LF of 9×7 RCBC. A temporary pedestrian bridge will be added to cross the creek during time of construction for the property owners. The scope is also to include concrete driveway replacement, curb and gutter, and pavement resurfacing. There will also be grading around the existing creek that will tie into (2) new HWs.                