/ Opportunities
Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
- Department
- Aviation
- Charlotte Area Transit System
- Charlotte Communications & Marketing
- Charlotte Department of Transportation
- Charlotte Fire Department
- Charlotte Mecklenburg Police Department
- Charlotte Planning, Design & Development
- Charlotte Storm Water Services
- Charlotte Water
- City Attorney’s Office
- City Clerk
- City Manager's Office
- City Wide
- Community Relations
- Department of General Services
- Economic Development
- Finance
- Housing & Neighborhood Services
- Human Resources
- Innovation & Technology
- Internal Audit
- Solid Waste Services
- Strategy & Budget
- Solicitation Type
- Solicitation Category
- Expected Due Date
In Development
Aviation / Commodities & Goods
Badge, Credential Stock and other related items
In Development
Charlotte Water / Construction
Paw Creek Sewer Rehabilitation and Sewer Diversion
- Posting Number: 2024-Q2(Apr-Jun)-CW-13021
- Anticipated Posting Date: 2024-05-21
- Last Updated: 05/07/24
This project consists of the sanitary sewer rehabilitation of approximately 4,700 LF of sewer outfall with cured-in-place lining. This project will extend along the Paw Creek outfall. A 112 LF, 24-inch diversion sewer will also be constructed under Briar Creek along with a 118 LF, 8-inch LF collector sewer. All work will occur within Charlotte Water’s existing easement. A small portion of work on a county parcel.
Archived
Charlotte Water / Construction
Lift Station Improvements Phase 4 – CANCELLED
- Posting Number: 2025-Q2(Apr-Jun)-CW-12265
- Anticipated Posting Date: 2025-06-01
- Last Updated: 05/07/24
Provides for the rehabilitation of 10 to 12 sanitary sewer lift stations. Modernization of electrical and controls, installation of flow measurement equipment and miscellaneous safety and security upgrades as deemed needed on a per site basis. |
-inactive due to budget reprioritization
Archived
Charlotte Water / Construction
FY25 Large Service Contract #1 – CANCELLED
- Posting Number: 2026-Q2(Apr-Jun)-CW-12285
- Anticipated Posting Date: 2026-04-01
- Last Updated: 05/07/24
This contract is for the continuous installation of large water and sewer services, as needed, for commercial or residential purposes with a diameter of one and a half inches or larger. Customers apply for quotes for service connection and pay the applicable fees to get into the construction queue. This contract will help meet the demand for these kinds of service connections for the next two years.
-inactive due to budget reprioritization
Archived
Charlotte Water / Construction
FY25 Small Service Contract #1 – CANCELLED
- Posting Number: 2026-Q2(Apr-Jun)-CW-12287
- Anticipated Posting Date: 2026-05-05
- Last Updated: 05/07/24
This contract is for water and sanitary sewer service installations including connection to the existing public main, which extends a small diameter line to the property, and includes a water meter box or sanitary sewer cleanout. Customers pay connection fees for the installation service, which is based on costs incurred by Charlotte Water in these contracts. The work covered by this contract will provide approximately 800 total services.
-inactive due to budget reprioritization
In Development
Charlotte Water / Construction
Collective Storm Drainage Improvement Project Series K
- Posting Number: 2024-Q2(Apr-Jun)-CW-13023
- Anticipated Posting Date: 2024-06-07
- Last Updated: 05/07/24
Collective Storm Drainage Improvement Project (SDIP) Series K contains three separate storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures (standard and non-standard), storm drainpipe systems, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, water and sewer (relocations, installations and adjustments), foundation protection and any other associated work required by the Engineer.
In Development
Charlotte Water / Construction
FY24 Water Main Replacement – Contract 1
- Posting Number: 2024-Q2(Apr-Jun)-CW-13336
- Anticipated Posting Date: 2024-06-07
- Last Updated: 05/07/24
This contract consists of an undetermined number of individual projects consisting of water and/or sewer replacements, water and/or sewer extensions, and water distribution system reliability improvement projects, which will be assigned by the Project Engineer.
In Development
Aviation / General Services
Building Management Systems
- Posting Number: 2025-Q2(Apr-Jun)-AVI-14659
- Anticipated Posting Date: 2025-04-15
- Last Updated: 05/07/24
CLT is seeking proposals from qualified and experienced companies interested in maintaining existing or providing a Building Management Systems to monitor access control, cameras, HVAC and fire detection at the main Terminal, old Terminal building and at the CLT
Center.
In Development
Charlotte Storm Water Services / Construction
Lawton Road Storm Drainage Improvement Project
- Posting Number: 2024-Q2(Apr-Jun)-CSWS-8343
- Anticipated Posting Date: 2024-05-22
- Last Updated: 05/06/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
CLT Airport shall purchase miscellaneous items for re-stocking of badges and credential items including but not limited to badge holders and clips, printer and inline laminating supplies and badges.