/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Department of General Services / Construction

CMGC- ADA Implementation – Ph 2 – Highrise

  • Posting Number: 2025-Q3(Jul-Sep)-DGS-14534
  • Anticipated Posting Date: 2025-08-01
  • Last Updated: 04/11/24
Add to Calendar 2025-08-01 2025-08-01 CMGC- ADA Implementation – Ph 2 – Highrise

This project will address the non-conforming, physical ADA barriers to the greatest extent feasible and where applicable under code provisions. Phase 1  addressed barriers in the Charlotte Mecklenburg Government Center  Chamber Space, while this Phase 2 addresses all other spaces.  Scope areas include Exterior Plaza, Entrance Lobby, 2nd Floor Mezzanine and the 14-story Highrise. Specific scope includes, but is not limited to, Partitions, Doors and Door Hardware, Ramps, Millwork, Restrooms, Controlled Access, Obstructions, Plaza Deck and Accessible Routes.

In Development

Department of General Services / Architectural / Engineering Services

Solid Waste Services Master Plan – Advance Planning

  • Posting Number: 2024-Q3(Jul-Sep)-DGS-14485
  • Anticipated Posting Date: 2024-09-01
  • Last Updated: 04/10/24
Add to Calendar 2024-09-01 2024-09-01 Solid Waste Services Master Plan – Advance Planning

The project is a study of the current City of Charlotte Solid Waste collection process, the existing facilities for the processing of solid waste, and future needs that include providing strategic locations for additional facilities. The consultant needs to be able to make recommendations as well as have the resources to design a facility.

The selected firm will review the Solid Waste collection process and develop a master plan for how services should be provided throughout the City of Charlotte. This will include identifying possible locations for facilities, the make-up of facilities, and co-location opportunities with other new or existing City facilities.

 

In Development

Department of General Services / Construction

Sardis Road North Sidewalk

  • Posting Number: 2024-Q3(Jul-Sep)-DGS-14214
  • Anticipated Posting Date: 2024-09-11
  • Last Updated: 04/10/24
Add to Calendar 2024-09-11 2024-09-11 Sardis Road North Sidewalk

This project will provide new sidewalk along Sardis Road North from Sardis Road to westernmost intersection of Rittenhouse Circle and Sardis Road North. Project length = 0.5 miles.

This project will include the following:
6′ Sidewalk
8′ Planting Strips
2′-6″ Curb and Gutter
Street Trees
Concrete Ped Refuge Island (between Kilcullen Dr. and Rittenhouse Circle)
Concrete Bus waiting pads
Retaining Walls
Curb Ramps
Storm Drainage

In Development

Charlotte Department of Transportation / Construction

CDOT Sweden Rd EVSE

  • Posting Number: 2024-Q3(Jul-Sep)-CDT-14489
  • Anticipated Posting Date: 2024-08-01
  • Last Updated: 04/10/24
Add to Calendar 2024-08-01 2024-08-01 CDOT Sweden Rd EVSE

In June 2018, the Sustainable and Resilient Charlotte by 2050 Resolution was unanimously passed by City Council. This resolution set aggressive and aspirational municipal and community-wide greenhouse gas emissions reduction goals for the City of Charlotte. Specifically, it strives to have City fleet and facilities be fueled by 100% zero-carbon sources by 2030. The CDOT Sweden Rd facility currently contains many fleet vehicles and buses that are run on gasoline. In order to meet the 2030 target, the City has begun and will continue purchasing Electric Vehicles (EV’s) and equip the CDOT Sweden Rd Facility with EV Chargers.

In Development

Solid Waste Services / Construction

Solid Waste EVSE

  • Posting Number: 2024-Q3(Jul-Sep)-SWS-14486
  • Anticipated Posting Date: 2024-08-01
  • Last Updated: 04/10/24
Add to Calendar 2024-08-01 2024-08-01 Solid Waste EVSE

In June 2018, the Sustainable and Resilient Charlotte by 2050 Resolution was unanimously passed by City Council. This resolution set aggressive and aspirational municipal and community-wide greenhouse gas emissions reduction goals for the City of Charlotte. Specifically, it strives to have City fleet and facilities be fueled by 100% zero-carbon sources by 2030. The Solid Waste facility currently contains many refuse collection vehicles that are run on gasoline. In order to meet the 2030 target, The City has begun and will continue purchasing Electric Vehicles (EV’s) and equip the Solid Waste facility with EV Chargers for refuse collection vehicles.

In Development

Charlotte Area Transit System / Construction

CATS N. Davidson EVSE Hub

  • Posting Number: 2024-Q3(Jul-Sep)-CATS-14399
  • Anticipated Posting Date: 2024-07-01
  • Last Updated: 04/08/24
Add to Calendar 2024-07-01 2024-07-01 CATS N. Davidson EVSE Hub

In June 2018, the Sustainable and Resilient Charlotte by 2050 Resolution was unanimously passed by City Council. This resolution set aggressive and aspirational municipal and community-wide greenhouse gas emissions reduction goals for the City of Charlotte. Specifically, it strives to have City fleet and facilities be fueled by 100% zero-carbon sources by 2030.The N. Davidson CATS facility currently contains many fleet vehicles and buses that are run on gasoline. In order to meet the 2030 target, The City has begun and will continue purchasing Electric Vehicles (EV’s) and equip the N. Davidson CATS facility with EV Chargers.

In Development

Charlotte Water / Construction

Elevated Storge Tank #2 – Woodlawn

  • Posting Number: 2024-Q3(Jul-Sep)-CW-12254
  • Anticipated Posting Date: 2024-09-02
  • Last Updated: 04/02/24
Add to Calendar 2024-09-02 2024-09-02 Elevated Storge Tank #2 – Woodlawn

Construction of the second elevated storage tank at the Woodlawn site if there is sufficient funding after starting construction on the first elevated storage tank (Sunset Road). The second elevated storage tank has a capacity of three million gallons. The project is fully designed and permitted.

Archived

Charlotte Water / Construction

FY25 Street Mains Extensions Contract 1 – CANCELLED

  • Posting Number: 2025-Q3(Jul-Sep)-CW-12275
  • Anticipated Posting Date: 2025-07-01
  • Last Updated: 03/25/24
Add to Calendar 2025-07-01 2025-07-01 FY25 Street Mains Extensions Contract 1 – CANCELLED

This contract will be for the construction of an undetermined number of street mains extensions and miscellaneous infrastructure projects. This contract will also provide construction assistance on an as needed basis for other capital projects. This contract will cover Charlotte Water’s entire service area.

Cancelled as of 3/25/2024.

In Development

Charlotte Storm Water Services / Construction

Collective AD Storm Drainage Improvement Program

  • Posting Number: 2024-Q3(Jul-Sep)-CSWS-12092
  • Anticipated Posting Date: 2024-08-18
  • Last Updated: 03/21/24
Add to Calendar 2024-08-18 2024-08-18 Collective AD Storm Drainage Improvement Program

Collective Storm Drainage Improvement Projects Series AC will involve 3 projects throughout the City of Charlotte, 4213 Tipperary Pl, 2607 Vail Ave, 4600 Randolph Rd.  4213 Tipperary Pl will consist of a reinforced box culvert replacement as well as reinforced concrete pipe replacement and realignment, CIPP liner, storm drainage structure replacement, full depth asphalt, curb and gutter, concrete driveway, new sanitary sewer pipe and sanitary sewer structures, as well as sidewalk replacement all along Tipperary Place.  2607 Vail Ave will reroute water along Vaile Ave that will consist of new storm drainage pipe and structures as well as sanitary sewer line replacement, concrete driveway and curb replacement, as well as full depth asphalt replacement.  4600 Randolph Rd will consist of CIPP lining across Randolph Rd, a new reinforced concrete pipe alignment with structures, concrete curb, concrete driveway, full depth asphalt, and ditch work along commercial properties and an apartment complex.

1 2 5 6