/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Charlotte Water / General Services

McDowell Knife Gate Valve

  • Posting Number: 2025-Q3(Jul-Sep)-CW-17936
  • Anticipated Posting Date: 2025-07-15
  • Last Updated: 03/18/25
Add to Calendar 2025-07-15 2025-07-15 McDowell Knife Gate Valve

This contract includes the replacement of IPS knife gate valves at McDowell. The work will ensure continued reliability and functionality of the infrastructure. This involves installing functioning valves for operational control within the system.

In Development

Charlotte Water / General Services

Site Clean-Up

  • Posting Number: 2025-Q3(Jul-Sep)-CW-17934
  • Anticipated Posting Date: 2025-07-31
  • Last Updated: 03/18/25
Add to Calendar 2025-07-31 2025-07-31 Site Clean-Up

This contract will provide for the removal of industrial waste and debris from various Charlotte Water sites. Work may include hazardous material handling and environmental remediation as required. Proper site clean-up ensures compliance with environmental regulations and maintains safe working conditions.

In Development

Charlotte Water / Architectural / Engineering Services

Sewer Trunkline Modeling

  • Posting Number: 2025-Q3(Jul-Sep)-CW-17932
  • Anticipated Posting Date: 2025-07-31
  • Last Updated: 03/18/25
Add to Calendar 2025-07-31 2025-07-31 Sewer Trunkline Modeling

This project involves sewer trunkline modeling to support odor control efforts within the wastewater collection system. The model will help optimize system performance and identify areas where odor mitigation strategies are needed. The goal is to enhance system efficiency while minimizing odor impacts on surrounding communities.

In Development

Charlotte Water / General Services

Landscape Management

  • Posting Number: 2025-Q3(Jul-Sep)-CW-17929
  • Anticipated Posting Date: 2025-07-31
  • Last Updated: 03/18/25
Add to Calendar 2025-07-31 2025-07-31 Landscape Management

This contract will provide landscaping services at various Charlotte Water locations. Work may include mowing, tree trimming, and general upkeep of facility grounds. The task is to maintain these areas, improving site aesthetics and safety.

In Development

Charlotte Water / Construction

McAlpine Large Diameter Sewer Rehabilitation – Phase 2

  • Posting Number: 2025-Q3(Jul-Sep)-CW-17898
  • Anticipated Posting Date: 2025-08-28
  • Last Updated: 03/18/25
Add to Calendar 2025-08-28 2025-08-28 McAlpine Large Diameter Sewer Rehabilitation – Phase 2

This project involves the rehabilitation of approximately 7,000 linear feet of reinforced concrete pipe (RCP) sewer outfall. The sewer outfall is located just south of Highway 51, running parallel to McAlpine Creek. The work will improve the structural integrity and performance of the sewer system.

In Development

Charlotte Water / Construction

McAlpine Wastewater Management Facility – Biosolids Treatment Fa ... McAlpine Wastewater Management Facility – Biosolids Treatment Facilities Reliability – Construction Package 1

  • Posting Number: 2025-Q3(Jul-Sep)-CW-17883
  • Anticipated Posting Date: 2025-07-15
  • Last Updated: 03/18/25
Add to Calendar 2025-07-15 2025-07-15 McAlpine Wastewater Management Facility – Biosolids Treatment Facilities Reliability – Construction Package 1

Construction Package 1 includes mechanical, electrical, instrumentation, and structural rehabilitation of Digested Sludge Storage Tanks 1 and 2 and their Control Building. The project aims to improve the reliability and performance of biosolids treatment processes. These upgrades will ensure continued compliance with regulatory requirements and operational efficiency.

In Development

Charlotte Water / Construction

McAlpine Wastewater Management Facility – Preliminary and Primar ... McAlpine Wastewater Management Facility – Preliminary and Primary Treatment Facilities Rehabilitation

  • Posting Number: 2025-Q3(Jul-Sep)-CW-17881
  • Anticipated Posting Date: 2025-07-15
  • Last Updated: 03/18/25
Add to Calendar 2025-07-15 2025-07-15 McAlpine Wastewater Management Facility – Preliminary and Primary Treatment Facilities Rehabilitation

The project includes mechanical, electrical, instrumentation, and structural rehabilitation of preliminary and primary treatment facilities at the McAlpine Creek WWMF. The facilities generally include Screenings Removal, Primary Clarifiers, Gravity Thickeners, Flow Equalization Storage, Flow Equalization Pumping, and Chemical Storage. These improvements will enhance operational reliability and efficiency.

In Development

Charlotte Water / Construction

Belmont Lift Station and Force Main

  • Posting Number: 2025-Q3(Jul-Sep)-CW-12289
  • Anticipated Posting Date: 2025-07-18
  • Last Updated: 03/18/25
Add to Calendar 2025-07-18 2025-07-18 Belmont Lift Station and Force Main

This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s Stowe Regional Wastewater Reclamation Facility via Charlotte Water’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.

Archived

Charlotte Water / Architectural / Engineering Services

Upper Little Sugar Creek Interceptor Design-cancelled

  • Posting Number: 2025-Q3(Jul-Sep)-CW-12252
  • Anticipated Posting Date: 2025-08-15
  • Last Updated: 03/18/25
Add to Calendar 2025-08-15 2025-08-15 Upper Little Sugar Creek Interceptor Design-cancelled

Design of Upper Little Sugar Creek Interceptor (at least Phase 1 from Wastewater Treatment Plant to East Boulevard).  The complete project extends from Sugar Creek Wastewater Treatment Plant to Sugar Creek Rd.

this project has been cancelled

1 2 3 4 5 7 8