Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Charlotte Water / Construction

McDowell Creek WRRF Digesters Rehabilitation 

  • Posting Number: 2027-Q3(Jul-Sep)-CW-18608
  • Anticipated Posting Date: 2027-07-11
  • Last Updated: 10/02/25
Add to Calendar 2027-07-11 2027-07-11 McDowell Creek WRRF Digesters Rehabilitation 

This will be an Invitation to Bid for Charlotte Water. The project will involve the rehabilitation of biosolids treatment facilities at the McDowell Creek Water Resource Recovery Facility. Work will focus on existing digesters and may include structural repairs, floor regrouting, replacement of mechanical components, and upgrades to valves and associated piping. Electrical and instrumentation systems will be reconnected or replaced as needed to support restored operations. These improvements aim to enhance the performance, safety, and reliability of the digester systems and associated infrastructure.

 

 

 

 

 

In Development

Department of General Services / Construction

Mallard Creek Road Shared-Use Path (Governor Hunt to Driwood)

  • Posting Number: 2026-Q3(Jul-Sep)-DGS-17368
  • Anticipated Posting Date: 2026-07-01
  • Last Updated: 02/03/25
Add to Calendar 2026-07-01 2026-07-01 Mallard Creek Road Shared-Use Path (Governor Hunt to Driwood)

This project will construct a shared-use path along the east side of Mallard Creek Road from Governor Hunt Road to Driwood Court. Specific improvements will also include construction of a plant strip, curb and cutter, accessible ramps, driveways, and potential storm drainage improvements. The purpose of this project is to improve pedestrian safety, mobility, and connectivity along Mallard Creek Road. Project Length = 0.4 miles.

Archived

Charlotte Water / Construction

960 East/West Water Main-CANCELLED

  • Posting Number: 2027-Q3(Jul-Sep)-CW-12261
  • Anticipated Posting Date: 2027-07-01
  • Last Updated: 05/13/24
Add to Calendar 2027-07-01 2027-07-01 960 East/West Water Main-CANCELLED

Project of approximately 16,000 Linear Feet of 36 inch water main along Albemarle Rd.  This project improves the water transmission capacity in the 960 pipe zone.  Project is in final design, permitting and easement acquisition.

5/13 cancelled due to project schedule reprioritization.