Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Department of General Services / Construction
Arrowood at Whitehall Commons Intersection

Charlotte Water / Construction
FY25 Large Service Contract #1 – CANCELLED
This contract is for the continuous installation of large water and sewer services, as needed, for commercial or residential purposes with a diameter of one and a half inches or larger. Customers apply for quotes for service connection and pay the applicable fees to get into the construction queue. This contract will help meet the demand for these kinds of service connections for the next two years.
-inactive due to budget reprioritization

Charlotte Water / Construction
FY25 Small Service Contract #1 – CANCELLED
This contract is for water and sanitary sewer service installations including connection to the existing public main, which extends a small diameter line to the property, and includes a water meter box or sanitary sewer cleanout. Customers pay connection fees for the installation service, which is based on costs incurred by Charlotte Water in these contracts. The work covered by this contract will provide approximately 800 total services.
-inactive due to budget reprioritization

Department of General Services / Construction
Brown Grier Road Upgrades
This project will widen the two-lane road to a four-lane median-divided road with multi-use paths between Steele Creek Road and Whitehall Park Drive, and a multi-use path north along Sandy Porter Road to the subdivision at Williams Glenn Road.

Department of General Services / Construction
University City Blvd Pedestrian Crossings
This Project will install 270 LF of proposed 12′ wide multi-use-path, curb ramps, crosswalks across NC 49, Pedestrian concrete island, milling/resurfacing, storm drainage and pedestrian hybrid beacon with mast arms near the intersection of University Blvd and Mark Twain Road. This project will also install pedestrian crossings, wheelchair ramps, traffic signals milling/resurfacing and storm drainage system at the intersection of University City Blvd and Suther Rd.91347

Charlotte Storm Water Services / Construction
Shamrock Drive Storm Drainage Improvement Project
This construction project is located near The Plaza and Shamrock Drive and has been identified to address flooding, erosion, and pipe failure in the project area.
This is an intersection project which will involve installing a new traffic signal with pedestrian signals, widening some of the approaches, replacing all curb ramps, mill & overlay, and pavement markings. The traffic signal will use steel strain poles.