/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Department of General Services / Construction

University City Blvd Pedestrian Crossings

  • Posting Number: 2026-Q2(Apr-Jun)-DGS-14167
  • Anticipated Posting Date: 2026-04-23
  • Last Updated: 03/20/24
Add to Calendar 2026-04-23 2026-04-23 University City Blvd Pedestrian Crossings

This Project will install 270 LF of proposed 12′ wide multi-use-path, curb ramps, crosswalks across NC 49, Pedestrian concrete island, milling/resurfacing, storm drainage and pedestrian hybrid beacon with mast arms near the intersection of University Blvd and Mark Twain Road. This project will also install pedestrian crossings, wheelchair ramps, traffic signals milling/resurfacing and storm drainage system at the intersection of University City Blvd and Suther Rd.91347

In Development

Charlotte Storm Water Services / Construction

Shamrock Drive Storm Drainage Improvement Project

  • Posting Number: 2024-Q2(Apr-Jun)-CSWS-3459
  • Anticipated Posting Date: 2024-06-15
  • Last Updated: 01/28/24
Add to Calendar 2024-06-15 2024-06-15 Shamrock Drive Storm Drainage Improvement Project

This construction project is located near The Plaza and Shamrock Drive and has been identified to address flooding, erosion, and pipe failure in the project area.

In Development

Charlotte Storm Water Services / Construction

Collective V (Multiple Isolated Storm Drainage Improvements Projects)

  • Posting Number: 2024-Q2(Apr-Jun)-CSWS-9970
  • Anticipated Posting Date: 2024-04-15
  • Last Updated: 11/15/23
Add to Calendar 2024-04-15 2024-04-15 Collective V (Multiple Isolated Storm Drainage Improvements Projects)

This project consists of multiple isolated storm drainage improvements projects located throughout the City of Charlotte. Projects include storm drainage improvements and replacement and repair of existing storm drainage system facilities within the street right-of-way and private, residential properties.

In Development

Charlotte Storm Water Services / Construction

Laurel Avenue Storm Drainage Improvement Project

  • Posting Number: 2025-Q2(Apr-Jun)-CSWS-9836
  • Anticipated Posting Date: 2025-04-16
  • Last Updated: 11/15/23
Add to Calendar 2025-04-16 2025-04-16 Laurel Avenue Storm Drainage Improvement Project

This project is bordered by Laurel Avenue to the north, Dotger Avenue to the south, Randolph Road to the east and Hempstead Place to the west.  The existing drainage system consists of closed pipe systems.  This drainage system is currently undersized and street flooding has been reported on Colville Road and building flooding has been reported on Cranbrook Lane.

1 2 3