Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Charlotte Department of Transportation / Technology Goods & Services

Handheld License Plate Reader

  • Posting Number: 2025-Q4(Oct-Dec)-CDT-13771
  • Anticipated Posting Date: 2025-12-31
  • Last Updated: 03/01/24
Add to Calendar 2025-12-31 2025-12-31 Handheld License Plate Reader

Handheld license plate recognition device and associated software to automatically capture license plate information and associated data to determine compliance with paid or permitted parking.

In Development

Department of General Services / Construction

Monroe Road Streetscape

  • Posting Number: 2024-Q4(Oct-Dec)-DGS-8925
  • Anticipated Posting Date: 2024-12-16
  • Last Updated: 02/28/24
Add to Calendar 2024-12-16 2024-12-16 Monroe Road Streetscape

Improvements on Monroe Road between North Wendover Road and Eaton Road to create a more pedestrian-oriented corridor and install a pedestrian hybrid beacon in front of Time Out Youth Center.  Improvements will primarily include shared-use paths, drainage, and midblock pedestrian crossings.

In Development

Charlotte Storm Water Services / Construction

Rounding Run Storm Drainage Improvement Project

  • Posting Number: 2024-Q4(Oct-Dec)-CSWS-8361
  • Anticipated Posting Date: 2024-11-02
  • Last Updated: 01/28/24
Add to Calendar 2024-11-02 2024-11-02 Rounding Run Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

In Development

Charlotte Storm Water Services / Construction

Camp Greene/Freedom Drive Storm Drainage Improvement Project

  • Posting Number: 2025-Q4(Oct-Dec)-CSWS-8369
  • Anticipated Posting Date: 2025-11-02
  • Last Updated: 01/28/24
Add to Calendar 2025-11-02 2025-11-02 Camp Greene/Freedom Drive Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is located near the intersection of Camp Greene Street and Freedom Drive.

In Development

Aviation / Architectural / Engineering Services

Building Infrastructure Masterplan – ON HOLD

  • Posting Number: 2024-Q4(Oct-Dec)-AVI-12820
  • Anticipated Posting Date: 2024-11-01
  • Last Updated: 11/17/23
Add to Calendar 2024-11-01 2024-11-01 Building Infrastructure Masterplan – ON HOLD

Perform a masterplan analysis of the base building infrastructure including, but not limited to, mechanical, electrical, plumbing, and fire protection systems at Charlotte Douglas International Airport for both the main terminal campus and all Airport-owned outlying buildings.  The masterplan development includes a review of the existing building infrastructural systems, establishment of a forecast analysis and growth requirements, development of implementation strategies, and preparation of budget estimates.

In Development

Charlotte Storm Water Services / Construction

Redman Road SDIP

  • Posting Number: 2024-Q4(Oct-Dec)-CSWS-9158
  • Anticipated Posting Date: 2024-12-02
  • Last Updated: 11/15/23
Add to Calendar 2024-12-02 2024-12-02 Redman Road SDIP

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, and channels. Work will also include working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way or within storm drainage easements.

 

In Development

Charlotte Storm Water Services / Construction

Foxwood Road 2727 Storm Drain Improvement Project

  • Posting Number: 2024-Q4(Oct-Dec)-CSWS-7058
  • Anticipated Posting Date: 2024-10-02
  • Last Updated: 11/15/23
Add to Calendar 2024-10-02 2024-10-02 Foxwood Road 2727 Storm Drain Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

In Development

Aviation / Construction

4th Parallel Runway Package 3: West Parallel Taxiway

  • Posting Number: 2024-Q4(Oct-Dec)-AVI-12922
  • Anticipated Posting Date: 2024-10-28
  • Last Updated: 10/11/23
Add to Calendar 2024-10-28 2024-10-28 4th Parallel Runway Package 3: West Parallel Taxiway

As part of the Fourth Parallel Runway Program at CLT, this construction package will include the new West Parallel Taxiway and its connector taxiways.  The project includes erosion and sedimentation control, grading, drainage, airfield concrete and asphalt paving, fencing marking, and airfield lighting/signage.

In Development

Charlotte Storm Water Services / Construction

Riverbend Storm Drainage Improvement Project

  • Posting Number: 2024-Q4(Oct-Dec)-CSWS-8347
  • Anticipated Posting Date: 2024-12-11
  • Last Updated: 09/18/23
Add to Calendar 2024-12-11 2024-12-11 Riverbend Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. The project area is bordered by Ashton Drive to the north, Sharon Road to the south and east, and Park Road to the west. The existing drainage system consists of open channel and closed concrete and metal pipe systems.