Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Charlotte Storm Water Services / Construction

Lancer Dr 6818 Storm Drainage Improvement Project

  • Posting Number: 2026-Q4(Oct-Dec)-CSWS-20350
  • Anticipated Posting Date: 2026-10-19
  • Last Updated: 02/24/26
Add to Calendar 2026-10-19 2026-10-19 Lancer Dr 6818 Storm Drainage Improvement Project

Project initiated due to several holes and corrosion in the existing 16.25’x9.5’ elliptical pipe. Cracks in the headwalls were also observed. The City intends to replace 81LF 16.25’x9.5’ elliptical pipe with 81LF of 14’x9’ RCBC; add (2) Non-standard headwalls; add 213 LF of 24” RCP; replace 56LF of 15” RCP; add (3) CBs; Add (2) JBs; plug and fill approx. 220LF of 18” RCP; Add/replace approx. 600LF 2’6” C&G; channel grading; asphalt replacement.

In Development

Department of General Services / Construction

7th Street Parallel Bike Routes (Revised 2/2026)

  • Posting Number: 2026-Q4(Oct-Dec)-DGS-14170
  • Anticipated Posting Date: 2026-11-06
  • Last Updated: 02/24/26
Add to Calendar 2026-11-06 2026-11-06 7th Street Parallel Bike Routes (Revised 2/2026)

This project will build bike facilities in several different locations throughout the Elizabeth neighborhood to create safer conditions and improve ease of travel for cyclists and pedestrians, including approximately 2.1 miles of sharrows, modernization of two existing rectangular rapid flashing beacons, replacement of 10 wheelchair ramps, a new pedestrian crossing at Pecan Avenue and Shenandoah Avenue, implementation of new bike detection cameras, a new full traffic signal at Bascom Street and 7th Street, and a curb extension located at the intersection of Pecan Avenue and 8th Street.

February 2026 Update: This project’s scope has been divided into 2 phases and will not go out for public bid; the City plans to use an established on-call contract for both phases because construction of traffic signals is required.

In Development

Charlotte Storm Water Services / Construction

Camp Greene/Freedom Drive Storm Drainage Improvement Project

  • Posting Number: 2025-Q4(Oct-Dec)-CSWS-8369
  • Anticipated Posting Date: 2028-12-15
  • Last Updated: 02/24/26
Add to Calendar 2028-12-15 2028-12-15 Camp Greene/Freedom Drive Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is located near the intersection of Camp Greene Street and Freedom Drive.

In Development

Charlotte Storm Water Services / Construction

Foxrun/Burtonwood Storm Drainage Improvement Project

  • Posting Number: 2026-Q4(Oct-Dec)-CSWS-9838
  • Anticipated Posting Date: 2028-01-29
  • Last Updated: 02/24/26
Add to Calendar 2028-01-29 2028-01-29 Foxrun/Burtonwood Storm Drainage Improvement Project

This project is bordered by Rama Road to the north, McAlpine Creek to the south, Monroe Road to the east and Burlwood Road to the west.  The drainage system consists of open channel and closed pipe systems underneath City maintained roads.  This was previously identified as a major capital project from the watershed ranking prioritization process with a score of 54 of 100.  The ranking protocol identifies 30 structures that experience flooding in the 100-year storm event and 16 roads that experience transverse overtopping events that do not meet current standards.  A holistic project is needed to cost beneficially address the drainage system issues.

 

In Development

Charlotte Storm Water Services / Construction

Reece Rd Storm Drainage Improvement Project

  • Posting Number: 2027-Q4(Oct-Dec)-CSWS-19049
  • Anticipated Posting Date: 2027-12-15
  • Last Updated: 02/24/26
Add to Calendar 2027-12-15 2027-12-15 Reece Rd Storm Drainage Improvement Project

The project is bounded by the Park Rd Shopping Center to the South, Park Rd to the West, Arbor Lane to the North and Little Sugar Creek to the East.  The project involves storm drainage improvements along Reece Rd primarily with some improvements in intersections with Park Rd and Arbor Lane.

In Development

Charlotte Department of Transportation / Technology Goods & Services

Micromobility Technology Platform

  • Posting Number: 2026-Q4(Oct-Dec)-CDT-13769
  • Anticipated Posting Date: 2026-12-31
  • Last Updated: 02/24/26
Add to Calendar 2026-12-31 2026-12-31 Micromobility Technology Platform

Micromobility technology solutions to assist in analyzing and managing shared mobility devices within Charlotte’s right-of-way.

In Development

Charlotte Storm Water Services / Construction

Piccadilly Storm Drainage Improvement Project

  • Posting Number: 2027-Q4(Oct-Dec)-CSWS-8365
  • Anticipated Posting Date: 2027-10-15
  • Last Updated: 02/20/26
Add to Calendar 2027-10-15 2027-10-15 Piccadilly Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

In Development

Charlotte Storm Water Services / Construction

1206 Georgetown Storm Drainage Improvement Project

  • Posting Number: 2027-Q4(Oct-Dec)-CSWS-19051
  • Anticipated Posting Date: 2027-10-15
  • Last Updated: 02/20/26
Add to Calendar 2027-10-15 2027-10-15 1206 Georgetown Storm Drainage Improvement Project

The project is bounded by Pondella Drive to the West and North, Georgetown Drive to the South and Rosada Ave to the East.  The project involves storm drainage improvements along Georgetown Rd primarily with some improvements in intersections with Rosada Avenue and Pondella Drive.

In Development

Charlotte Storm Water Services / Construction

Caldwell Williams/Old Plank Storm Drainage Improvement Project

  • Posting Number: 2026-Q4(Oct-Dec)-CSWS-19059
  • Anticipated Posting Date: 2026-10-26
  • Last Updated: 02/16/26
Add to Calendar 2026-10-26 2026-10-26 Caldwell Williams/Old Plank Storm Drainage Improvement Project

Old Plank portion of project: Project initiated due to failure of 84” CMP system on Old Plank Rd. City plans to remove and replace 86” CMP with 56LF 8’x7’ RCBC; Add (2) concrete wingwalls;

Caldwell Williams portion of project: Project initiated due to road flooding. City plans to replace (2) 60” CMP pipes with 39 LF of 13×5 Box culvert. City also intends to add 40LF of 18” RCP; (2) Double catch basins and (2) concrete wingwalls; Pavement and curb replacement.