Earlybird, Business Opportunity Pipeline, City of Charlotte

/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Aviation / Construction

Runway 18L/36R and Taxiway Delta Rehab Construction

  • Posting Number: 2026-Q4(Oct-Dec)-AVI-17499
  • Anticipated Posting Date: 2026-12-14
  • Last Updated: 03/06/25
Add to Calendar 2026-12-14 2026-12-14 Runway 18L/36R and Taxiway Delta Rehab Construction

Charlotte Douglas International Airport (“CLT”) intends to issue an Invitation to Bid (“ITB”) for the rehabilitation construction of Runway 18L/36R and Taxiway D.  The scope of this work will include but is not limited to asphalt milling, paving, airfield electrical work, and pavement makings.

In Development

Department of General Services / Construction

Kuykendall Road Improvements

  • Posting Number: 2026-Q4(Oct-Dec)-DGS-17367
  • Anticipated Posting Date: 2026-10-01
  • Last Updated: 02/03/25
Add to Calendar 2026-10-01 2026-10-01 Kuykendall Road Improvements

This project will connect sidewalk along Kuykendall Road from
Thorn Blade Drive to McKee Road, and add a right-turn lane from
Kuykendall Road on to McKee Road in order to to increase
pedestrian safety and help alleviate traffic congestion at the
intersection. Project will also fill in small sidewalk gap on the south
side of McKee Rd at Kuykendall Rd and add pedestrian signals with
crosswalk at this intersection. Project length = approximately 0.75
miles.

In Development

Department of General Services / Construction

Lawyers Rd SW (Harri Ann to Chestnut)

  • Posting Number: 2026-Q4(Oct-Dec)-DGS-17342
  • Anticipated Posting Date: 2026-10-01
  • Last Updated: 11/05/24
Add to Calendar 2026-10-01 2026-10-01 Lawyers Rd SW (Harri Ann to Chestnut)

The scope of this project will include 0.34 miles of new 6ft wide concrete sidewalk, driveway improvements, and wheelchair ramps on Lawyers Rd from Chestnut Lake Dr to Harri Ann Dr.

In Development

Department of General Services / Construction

7th Street Parallel Bike Routes

  • Posting Number: 2025-Q4(Oct-Dec)-DGS-14170
  • Anticipated Posting Date: 2025-11-05
  • Last Updated: 03/14/24
Add to Calendar 2025-11-05 2025-11-05 7th Street Parallel Bike Routes

This project will build bike facilities in several different locations throughout the Elizabeth neighborhood to create safer conditions and improve ease of travel for cyclists and pedestrians, including approximately 2.1 miles of sharrows, modernization of two existing rectangular rapid flashing beacons, replacement of 10 wheelchair ramps, a new pedestrian crossing at Pecan Avenue and Shenandoah Avenue, implementation of new bike detection cameras, a new full traffic signal at Bascom Street and 7th Street, and a curb extension located at the intersection of Pecan Avenue and 8th Street.

In Development

Charlotte Department of Transportation / General Services

Bridge Repair Design

  • Posting Number: 2026-Q4(Oct-Dec)-CDT-17273
  • Anticipated Posting Date: 2026-10-05
  • Last Updated: 03/05/24
Add to Calendar 2026-10-05 2026-10-05 Bridge Repair Design

The Consultant shall prepare technical plans and specifications for the required repairs to the City’s bridges per the Inspection Reports. The Consultant shall schedule completion dates for each bridge. Before the beginning of the next inspection cycle, all bridge repairs should be completed by the contractor.

The Consultant shall prepare two (2) bid documents (including one for guardrail work).  Each shall include the technical plans and specifications for the bid packages for each bridge, as well as bid information/requirements for potential contractors.

In Development

Charlotte Department of Transportation / Technology Goods & Services

Handheld License Plate Reader

  • Posting Number: 2025-Q4(Oct-Dec)-CDT-13771
  • Anticipated Posting Date: 2025-12-31
  • Last Updated: 03/01/24
Add to Calendar 2025-12-31 2025-12-31 Handheld License Plate Reader

Handheld license plate recognition device and associated software to automatically capture license plate information and associated data to determine compliance with paid or permitted parking.

In Development

Charlotte Storm Water Services / Construction

Rounding Run Storm Drainage Improvement Project

  • Posting Number: 2024-Q4(Oct-Dec)-CSWS-8361
  • Anticipated Posting Date: 2024-11-02
  • Last Updated: 01/28/24
Add to Calendar 2024-11-02 2024-11-02 Rounding Run Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

1 2