/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Charlotte Water / Construction

Upper Little Sugar Creek Interceptor Design

  • Posting Number: 2025-Q1(Jan-Mar)-CW-12252
  • Anticipated Posting Date: 2025-01-15
  • Last Updated: 05/13/24
Add to Calendar 2025-01-15 2025-01-15 Upper Little Sugar Creek Interceptor Design

Design of Upper Little Sugar Creek Interceptor (at least Phase 1 from Wastewater Treatment Plant to East Boulevard).  The complete project extends from Sugar Creek Wastewater Treatment Plant to Sugar Creek Rd.

In Development

Aviation / General Services

Window Washing

  • Posting Number: 2025-Q1(Jan-Mar)-AVI-14739
  • Anticipated Posting Date: 2025-03-04
  • Last Updated: 05/08/24
Add to Calendar 2025-03-04 2025-03-04 Window Washing

The scope of this contract shall be to provide window cleaning services (“Work”) through the Airport’s main terminal, business valet parking decks, daily parking decks, hourly parking deck, old terminal and ramp tower. Work will include interior and exterior window cleaning on an “on-call” basis.

In Development

Department of General Services / General Services

Combination Sewer Truck Body Repair Services

  • Posting Number: 2025-Q1(Jan-Mar)-DGS-10276
  • Anticipated Posting Date: 2025-03-01
  • Last Updated: 03/21/24
Add to Calendar 2025-03-01 2025-03-01 Combination Sewer Truck Body Repair Services

The City of Charlotte is seeking a qualified provider of Combination Sewer Truck Body Repair Services to work in conjunction with Fleet Management. The Company shall perform maintenance, and repair services on fleet combination sewer truck equipment owned, operated, or maintained by the City.

In Development

Department of General Services / General Services

Fleet Trailer Equipment Repair Services

  • Posting Number: 2025-Q1(Jan-Mar)-DGS-10279
  • Anticipated Posting Date: 2025-01-30
  • Last Updated: 03/21/24
Add to Calendar 2025-01-30 2025-01-30 Fleet Trailer Equipment Repair Services

The City of Charlotte is seeking a qualified provider of Fleet Trailer Equipment Repair Services to work in conjunction with Fleet Management. The Company shall perform maintenance, and repair services on fleet trailed equipment owned, operated, or maintained by the City.

In Development

Department of General Services / Construction

Cross Charlotte Trail (XCLT)− Matheson to Craighead

  • Posting Number: 2025-Q1(Jan-Mar)-DGS-14020
  • Anticipated Posting Date: 2025-03-22
  • Last Updated: 03/20/24
Add to Calendar 2025-03-22 2025-03-22 Cross Charlotte Trail (XCLT)− Matheson to Craighead

The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.

In Development

Department of General Services / Construction

DeArmon Road Improvements Project

  • Posting Number: 2026-Q1(Jan-Mar)-DGS-5221
  • Anticipated Posting Date: 2026-03-31
  • Last Updated: 03/14/24
Add to Calendar 2026-03-31 2026-03-31 DeArmon Road Improvements Project

The DeArmon Road Improvements Project is part of the City of Charlotte’s Prosperity Village Comprehensive Neighborhood Improvement Program.  The project will complete the infrastructure needs in the neighborhood by providing buffered bicycle lanes, median/turning lane, storm drainage, curb & gutter, sidewalk and a greenway passage beneath DeArmon Road for the future extension of Clark’s Creek Greenway.

In Development

Department of General Services / Construction

Remount Road and West Boulevard Intersection Improvements

  • Posting Number: 2026-Q1(Jan-Mar)-DGS-14084
  • Anticipated Posting Date: 2026-03-03
  • Last Updated: 03/05/24
Add to Calendar 2026-03-03 2026-03-03 Remount Road and West Boulevard Intersection Improvements

The project consists of intersection improvements at Remount Rd and West Blvd including sidewalks, curb and gutter, decorative pavers, bus shelters with amenities, pedestrian-scale lighting, crosswalks, curb ramps, pedestrian crossing signalization, and landscaping.

In Development

Department of General Services / Construction

Sharon Road at Eastburn Road Improvements

  • Posting Number: 2026-Q1(Jan-Mar)-DGS-14074
  • Anticipated Posting Date: 2026-01-02
  • Last Updated: 02/28/24
Add to Calendar 2026-01-02 2026-01-02 Sharon Road at Eastburn Road Improvements

This project is located on Sharon Road at Eastburn Road. The project proposes a curve realignment adding a left-turn lane from Sharon Road on to Eastburn Road and removing the superelevation.

In Development

Charlotte Storm Water Services / Construction

Hidden Valley Storm Drainage Improvement Project

  • Posting Number: 2027-Q1(Jan-Mar)-CSWS-9840
  • Anticipated Posting Date: 2027-02-01
  • Last Updated: 01/28/24
Add to Calendar 2027-02-01 2027-02-01 Hidden Valley Storm Drainage Improvement Project

This project is bordered by Highway I-85 to the north, Cinderella Road to the south, Echo Glen Road to the east, and West Sugar Creek Road to the west.  The drainage system consists of open channel and closed pipe systems underneath city-maintained roads.  This was previously identified as a major capital project from the watershed ranking prioritization process, scoring 73 of 100.  The ranking protocol identifies 18 structures that experience flooding in the 100-year storm event and 7 roads that experience transverse overtopping events that do not meet current standards.  The entire neighborhood has received a patchwork of repairs over the years and a holistic project is needed to cost beneficially address the drainage system issues.

1 2