Earlybird, Business Opportunity Pipeline, City of Charlotte

/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

City Wide / Commodities & Goods

CCPA Police Pursuit Vehicles

  • Posting Number: 2026-Q1(Jan-Mar)-CTW-19746
  • Anticipated Posting Date: 2026-03-26
  • Last Updated: 02/26/26
Add to Calendar 2026-03-26 2026-03-26 CCPA Police Pursuit Vehicles

The Charlotte Mechlenburg Police Department (CMPD), in partnership with the Charlotte Cooperative Purchasing Alliance (CCPA) and it’s Participating Public Agencies are seeking bids from qualified vendors for the procurement of Police Pursuit Vehicles, both marked and unmarked. The CMPD adds and replaces vehicles based upon an assessment of usage, age, maintenance cost, and condition.

This solicitation is being handled by the Charlotte Cooperative Purchasing Alliance and may result in multiple contracts available to Participating Public Agencies.

Archived

Charlotte Storm Water Services / Construction

Collective AJ Storm Drainage Improvement Project – DUPLICATE

  • Posting Number: 2026-Q1(Jan-Mar)-CSWS-19045
  • Anticipated Posting Date: 2026-03-29
  • Last Updated: 02/26/26
Add to Calendar 2026-03-29 2026-03-29 Collective AJ Storm Drainage Improvement Project – DUPLICATE

In Development

Department of General Services / Construction

Remount Road and West Boulevard Intersection Improvements

  • Posting Number: 2026-Q1(Jan-Mar)-DGS-14084
  • Anticipated Posting Date: 2026-02-28
  • Last Updated: 02/24/26
Add to Calendar 2026-02-28 2026-02-28 Remount Road and West Boulevard Intersection Improvements

The project consists of intersection improvements at Remount Rd and West Blvd including sidewalks, curb and gutter, decorative concrete surface treatments, bus shelters with amenities, pedestrian-scale lighting, crosswalks, curb ramps, pedestrian crossing signalization, and landscaping.

In Development

Charlotte Storm Water Services / Construction

North Hoskins Rd 601 Storm Drainage Improvement Project

  • Posting Number: 2027-Q1(Jan-Mar)-CSWS-20354
  • Anticipated Posting Date: 2027-02-15
  • Last Updated: 02/24/26
Add to Calendar 2027-02-15 2027-02-15 North Hoskins Rd 601 Storm Drainage Improvement Project

Asset Management performed an inspection of the dual 72-inch CMP beneath N Hoskins Road in May 2024. Several holes with visible soil were observed during the inspection. Severe road settlement was also noted above the culvert. The City intends to replace 105LF of duel 72” CMP with 105LF of 11’x8” RCBC; add (2) Non-standard headwalls; add 120 LF of 54” RCP; remove 21LF 36” RCP; add (2) DCBs; Add (1) CB; replace approx. 253LF of 12” sewer; replace approx. 120LF 8” Sewer;  replace (4) sewer manholes; Add/replace approx. 382LF 2’6” C&G; asphalt replacement

In Development

Charlotte Storm Water Services / Construction

Shade Valley Pond Repairs Water Quality Enhancement Project

  • Posting Number: 2026-Q1(Jan-Mar)-CSWS-17359
  • Anticipated Posting Date: 2026-03-29
  • Last Updated: 02/24/26
Add to Calendar 2026-03-29 2026-03-29 Shade Valley Pond Repairs Water Quality Enhancement Project

The Shade Valley Pond Repairs project was initiated in order to relieve the City of significant efforts and costs of ongoing pond maintenance.  Proposed improvements to the pond are intended to address nuisance vegetation, increase storage capacity, address geese issues, and enhance the overall aesthetics of the pond.  Goals are to restore pond to “below normal pool” volumes via dredging of forebay and main pool to increase water quality function and remove available nutrients contributing to duckweed and algal blooms.  The entirety of the pond and littoral shelf will be replanted with wetland plantings and trees to enhance aesthetics and decrease attractiveness of pond to geese. Geese preventative measures are proposed to establish plantings.

 

In Development

Charlotte Storm Water Services / Construction

Toomey Storm Drainage Improvement Project

  • Posting Number: 2028-Q1(Jan-Mar)-CSWS-8373
  • Anticipated Posting Date: 2028-03-15
  • Last Updated: 02/24/26
Add to Calendar 2028-03-15 2028-03-15 Toomey Storm Drainage Improvement Project

The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

In Development

Charlotte Storm Water Services / Construction

Perth-Milton Storm Drainage Improvement Project

  • Posting Number: 2028-Q1(Jan-Mar)-CSWS-20399
  • Anticipated Posting Date: 2028-01-15
  • Last Updated: 02/24/26
Add to Calendar 2028-01-15 2028-01-15 Perth-Milton Storm Drainage Improvement Project

Proposed installation of residential access bridge, stream improvements, and storm drainage infrastructure in Perth Court area.

In Development

Aviation / Construction

On-Call General Contractor Services

  • Posting Number: 2026-Q1(Jan-Mar)-AVI-18437
  • Anticipated Posting Date: 2026-03-03
  • Last Updated: 02/17/26
Add to Calendar 2026-03-03 2026-03-03 On-Call General Contractor Services

The City of Charlotte Aviation department is seeking bids for on-call General Contractor services.  Aviation Facilities Division maintains a portfolio of buildings, including the Main Terminal, offices, fire stations, over 100 tenant occupied building spaces, and equipment shops, which house many aspects of the Aviation Departments Operations. The intent of this solicitation is to select
multiple companies to provide General Contractor services for various Airport properties on an as needed basis.

In Development

Charlotte Storm Water Services / Construction

Bonlyn Storm Drainage Improvement Project

  • Posting Number: 2026-Q1(Jan-Mar)-CSWS-9156
  • Anticipated Posting Date: 2026-03-15
  • Last Updated: 02/16/26
Add to Calendar 2026-03-15 2026-03-15 Bonlyn Storm Drainage Improvement Project

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, and channels. Work could also include working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way or within storm drainage easements.

1 2 4 5