Earlybird, Business Opportunity Pipeline, City of Charlotte

/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Department of General Services / Architectural / Engineering Services, Construction

Bryant Farms Phase 2 (Progressive Design-Build)

  • Posting Number: 2026-Q1(Jan-Mar)-DGS-18259
  • Anticipated Posting Date: 2026-01-01
  • Last Updated: 12/24/25
Add to Calendar 2026-01-01 2026-01-01 Bryant Farms Phase 2 (Progressive Design-Build)

This purpose of the Bryant Farms Road Extension, Phase II project is to continue the street connection of Bryant Farms Road between Rea Road and Ardrey Kell Road. The design is anticipated to include a two-lane road with turn lanes, shared-use path on both sides of the road, and improvements at the intersections of Bryant Farms Road with Rea Road, Tom Short Road, and Ardrey Kell Road. The project will also build a crossing over Flat Branch stream and will run adjacent to the Flat Branch Nature Preserve for a portion of the project.

Interested? Learn more at our Industry Day Event on 11/17!

For additional information about the Draft RFP and to view the sign in sheet from the industry day, please see the links below.

  • Sign-In Sheet (compressed to 2.5MB):

https://charlottenc.gov/files/sharedassets/city/v/1/growth-and-development/doing-business-with-the-city/documents/solicitations/city-procurement/general-services/bryantfarmsph2/bryant-farms-ext-pii-industry-day-sign-in-sheet-2025-11-17.pdf

  • RFP (compressed to 28MB – due to large file size please allow additional time to load):

https:///files/sharedassets/city/v/1/growth-and-development/doing-business-with-the-city/documents/solicitations/city-procurement/general-services/bryantfarmsph2/rfq-bryant-farms-phase-2-2025-11-24.pdf

Please have all questions submitted by 5pm on Monday December 8, 2025 to Carlos Alzate (Carlos.Alzate@charlottenc.gov)

  • Public Industry Day Q&A:

https://www.charlottenc.gov/files/sharedassets/city/v/1/growth-and-development/projects/documents/general-services/bryant-farms/bryant-farms-rd-ext-phii-industry-day-qa.pdf 

In Development

City Wide / Commodities & Goods

CCPA Police Interceptor Vehicles

  • Posting Number: 2026-Q1(Jan-Mar)-CTW-19746
  • Anticipated Posting Date: 2026-01-20
  • Last Updated: 12/23/25
Add to Calendar 2026-01-20 2026-01-20 CCPA Police Interceptor Vehicles

The Charlotte Mechlenburg Police Department (CMPD) is seeking bids from qualified vendors for the procurement of Police Interceptor Vehicles, both marked and unmarked. The CMPD adds and replaces vehicles based upon an assessment of usage, age, maintenance cost, and condition.

This contract will be a Charlotte Cooperative Purchasing Alliance (CCPA) contract and will be available to Participating Public Agencies.

In Development

Charlotte Storm Water Services / Construction

Riverbend Storm Drainage Improvement Project

  • Posting Number: 2026-Q1(Jan-Mar)-CSWS-8347
  • Anticipated Posting Date: 2026-03-09
  • Last Updated: 12/17/25
Add to Calendar 2026-03-09 2026-03-09 Riverbend Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. The project area is bordered by Ashton Drive to the north, Sharon Road to the south and east, and Park Road to the west. The existing drainage system consists of open channel and closed concrete and metal pipe systems.

In Development

Charlotte Storm Water Services / Construction

Wood Dale Ter 2022

  • Posting Number: 2026-Q1(Jan-Mar)-CSWS-19043
  • Anticipated Posting Date: 2026-03-23
  • Last Updated: 12/17/25
Add to Calendar 2026-03-23 2026-03-23 Wood Dale Ter 2022

Project consists of removing a gabion wall and replacing it with a new segmental block wall.  Minimal stream impacts will be made only to install wall. Partial storm system in ROW will be removed and replaced with no outfall impacts.

In Development

Charlotte Storm Water Services / Construction

Collective Q Storm Drainage Improvement Project

  • Posting Number: 2026-Q1(Jan-Mar)-CSWS-8357
  • Anticipated Posting Date: 2026-03-15
  • Last Updated: 12/17/25
Add to Calendar 2026-03-15 2026-03-15 Collective Q Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

In Development

Charlotte Storm Water Services / Construction

Collective AD Storm Drainage Improvement Program

  • Posting Number: 2026-Q1(Jan-Mar)-CSWS-12092
  • Anticipated Posting Date: 2026-03-15
  • Last Updated: 12/17/25
Add to Calendar 2026-03-15 2026-03-15 Collective AD Storm Drainage Improvement Program

Collective Storm Drainage Improvement Projects Series AD will involve 3 projects throughout the City of Charlotte, 4213 Tipperary Pl, 2607 Vail Ave, 4600 Randolph Rd.  4213 Tipperary Pl will consist of a reinforced box culvert replacement as well as reinforced concrete pipe replacement and realignment, CIPP liner, storm drainage structure replacement, full depth asphalt, curb and gutter, concrete driveway, new sanitary sewer pipe and sanitary sewer structures, as well as sidewalk replacement all along Tipperary Place.  2607 Vail Ave will reroute water along Vaile Ave that will consist of new storm drainage pipe and structures as well as sanitary sewer line replacement, concrete driveway and curb replacement, as well as full depth asphalt replacement.  4600 Randolph Rd will consist of CIPP lining across Randolph Rd, a new reinforced concrete pipe alignment with structures, concrete curb, concrete driveway, full depth asphalt, and ditch work along commercial properties and an apartment complex.

In Development

Charlotte Storm Water Services / Construction

Birmingham 6317 Storm Drain Improvement Project

  • Posting Number: 2026-Q1(Jan-Mar)-CSWS-7062
  • Anticipated Posting Date: 2026-01-19
  • Last Updated: 12/17/25
Add to Calendar 2026-01-19 2026-01-19 Birmingham 6317 Storm Drain Improvement Project

The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

In Development

Charlotte Storm Water Services / Construction

Flintridge Dr (2831) Storm Drainage Improvement Project

  • Posting Number: 2026-Q1(Jan-Mar)-CSWS-3469
  • Anticipated Posting Date: 2026-01-01
  • Last Updated: 12/17/25
Add to Calendar 2026-01-01 2026-01-01 Flintridge Dr (2831) Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

In Development

Aviation / Technology Goods & Services

RFP AVIA 26-13 CLT Internet Circuits

  • Posting Number: 2026-Q1(Jan-Mar)-AVI-19605
  • Anticipated Posting Date: 2026-01-30
  • Last Updated: 12/12/25
Add to Calendar 2026-01-30 2026-01-30 RFP AVIA 26-13 CLT Internet Circuits

Charlotte Douglas International Airport (CLT) RFP for dedicated high-speed, symmetrical and scalable bandwidth provided on a business-grade fiber optic connection.

1 2 7 8