Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Aviation / Construction
On-Call General Contractor Services

Charlotte Storm Water Services / Construction
Bonlyn Storm Drainage Improvement Project
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, and channels. Work could also include working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within the street right-of-way or within storm drainage easements.

Charlotte Storm Water Services / Construction
Village Lake Dr 2210 Storm Drainage Improvement Project
Project started due to surface depressions along roadway. City plans to remove and replace corrugated metal pipe with 83 linear feet (LF) of 8’ x 4’ reinforced concrete box culvert; remove and replace two headwalls; remove and replace 311 LF of 15″ reinforced concrete pipe (RCP); remove and replace 42 LF 24″ RCP; remove and replace 27 LF 18″ RCP; bank grading; and remove and replace 85 LF 10” ductile iron pipe of sewer.

Charlotte Storm Water Services / Construction
Birmingham 6317 Storm Drain Improvement Project
The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after the review is complete.

Charlotte Storm Water Services / Construction
Rhodes Storm Drainage Improvement Project
Rhodes SDIP is a minor bid project that was created to address the service request at 3738 Rhodes and is located on the City project dashboard.

Charlotte Storm Water Services / Construction
Laurel Avenue Storm Drainage Improvement Project
This project is bordered by Laurel Avenue to the north, Dotger Avenue to the south, Randolph Road to the east and Hempstead Place to the west. The existing drainage system consists of closed pipe systems. This drainage system is currently undersized and street flooding has been reported on Colville Road and building flooding has been reported on Cranbrook Lane.

Charlotte Storm Water Services / Construction
Eastway Storm Drainage Improvement Project
The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Eastway Storm Drainage Improvement Project (SDIP) area.
The Eastway Storm Drainage Improvement Project is bordered by Arnold Drive to the north, Central Avenue to the south, Temple Lane to the east and Eastway Drive to the west. This project area is within a drainage area of approximately 200 acres and the improvements may include pipe system upgrades and channel improvements.

Charlotte Storm Water Services / Construction
Bruns Academy Water Quality Enhancement Project
There is an existing wetlands system and stream adjacent to the Bruns Academy that are in need of improvements. The intent of this project is to reset an existing wetlands system to its original design and provide enhancement, where applicable. Wetland restoration efforts will include regrading, sodding and planting of vegetation, installation of a new pedestrian bridge and retaining wall. Additionally, stream improvements, such as regrading banks and adding riffles, are proposed. The proposed improvements will enhance the overall performance of the system for conveying and treating stormwater.

Charlotte Storm Water Services / Construction
Barrington Drive 5919 Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after the review is complete.
The City of Charlotte Aviation department is seeking bids for on-call General Contractor services. Aviation Facilities Division maintains a portfolio of buildings, including the Main Terminal, offices, fire stations, over 100 tenant occupied building spaces, and equipment shops, which house many aspects of the Aviation Departments Operations. The intent of this solicitation is to select
multiple companies to provide General Contractor services for various Airport properties on an as needed basis.