Earlybird, Business Opportunity Pipeline, City of Charlotte

/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Aviation / Construction

Wilkinson Blvd. Intersection Improvements

  • Posting Number: 2026-Q2(Apr-Jun)-AVI-20106
  • Anticipated Posting Date: 2026-05-04
  • Last Updated: 02/06/26
Add to Calendar 2026-05-04 2026-05-04 Wilkinson Blvd. Intersection Improvements

This project will consist of roadway construction improvements in two phases/intersections. The first phase will construct new ramps to merge on and off Josh Birmingham Parkway at the eastbound lane of Wilkinson Blvd. There will also be an extension of the existing left turn lanes from the westbound side of Wilkinson Blvd. onto Josh Birmingham Pkwy. The second phase/intersection will include widening of the northbound lanes on Harlee Avenue at Wilkinson Blvd. to include two left turn lanes, one straight through lane and one right turn lane. This project consists of road widening, grading, asphalt paving, concrete curb, pavement markings, and utility coordination.

In Development

Aviation / Construction

Terminal Re-Roofing

  • Posting Number: 2026-Q2(Apr-Jun)-AVI-20109
  • Anticipated Posting Date: 2026-04-01
  • Last Updated: 02/06/26
Add to Calendar 2026-04-01 2026-04-01 Terminal Re-Roofing

The project involves the replacement of existing roofing on the main terminal and Concourse D of CLT Airport, along with the replacement of existing air handling units. The work includes re-roofing, removal of abandoned mechanical equipment and support structures, and replacement of existing air handling units. The project is anticipated to have a duration between one and two years. Much of the work will occur during the day; however, delivery of materials and removal of debris will take place at night.

In Development

Charlotte Water / Construction

FY26 Water Main Replacement Bid Package

  • Posting Number: 2026-Q2(Apr-Jun)-CW-20056
  • Anticipated Posting Date: 2026-04-15
  • Last Updated: 02/06/26
Add to Calendar 2026-04-15 2026-04-15 FY26 Water Main Replacement Bid Package

Charlotte Water is seeking a construction contractor. This contract will be for the construction of multiple defined small water main replacement projects in neighborhoods totaling approximately 25,000 LF of 2-, 6-, 8-, and 12-inch main replacement.

In Development

Charlotte Storm Water Services / Construction

Collective W Storm Drainage Improvements Project

  • Posting Number: 2026-Q2(Apr-Jun)-CSWS-9972
  • Anticipated Posting Date: 2026-04-29
  • Last Updated: 01/21/26
Add to Calendar 2026-04-29 2026-04-29 Collective W Storm Drainage Improvements Project

This project consists of multiple isolated storm drainage improvements projects located throughout the City of Charlotte. Projects include storm drainage replacement and sewer relocations within the street right-of-way and private, residential properties.

Archived

Department of General Services / General Services

Heavy-Duty Refuse Truck and Street Sweeper Truck Maintenance and Repai ... Heavy-Duty Refuse Truck and Street Sweeper Truck Maintenance and Repair Services

  • Posting Number: 2025-Q2(Apr-Jun)-DGS-18402
  • Anticipated Posting Date: 2025-06-16
  • Last Updated: 01/02/26
Add to Calendar 2025-06-16 2025-06-16 Heavy-Duty Refuse Truck and Street Sweeper Truck Maintenance and Repair Services

The City of Charlotte seeks a qualified company to provide heavy-duty refuse truck and street sweeper truck maintenance and repair services. The Company shall perform maintenance and repair services on the fleet of heavy-duty refuse trucks and street sweeper truck equipment owned, operated, or maintained by the City.

In Development

Charlotte Water / Construction

Irwin Creek WWTP UV Disinfection Improvements

  • Posting Number: 2026-Q2(Apr-Jun)-CW-19832
  • Anticipated Posting Date: 2026-05-01
  • Last Updated: 12/30/25
Add to Calendar 2026-05-01 2026-05-01 Irwin Creek WWTP UV Disinfection Improvements

This project includes replacing all the components of the existing UV system at Irwin Creek Wastewater Treatment Plant. This will also require temporary disinfection capabilities throughout the installation of the new UV system.

In Development

Charlotte Water / Construction

McDowell WWTP Headworks Improvements

  • Posting Number: 2026-Q2(Apr-Jun)-CW-19838
  • Anticipated Posting Date: 2026-06-01
  • Last Updated: 12/30/25
Add to Calendar 2026-06-01 2026-06-01 McDowell WWTP Headworks Improvements

This project will include the replacement of the 30″ influent pump station knife gate valves at the discharge header with new plug valves. Additional piping that is failing will need to be replaced along with valve actuators and electrical components. Replacement of malfunctioning gates will also need to be replaced.

In Development

Charlotte Water / Construction

Lee Dukes Alum Bulk Storage Replacement

  • Posting Number: 2026-Q2(Apr-Jun)-CW-19828
  • Anticipated Posting Date: 2026-04-01
  • Last Updated: 12/30/25
Add to Calendar 2026-04-01 2026-04-01 Lee Dukes Alum Bulk Storage Replacement

This construction contract is for the replacement of the Alum Bulk Storage tanks at the Lee Dukes Water Treatment Plant. The project will also include replacement of the existing piping between the day tanks and the bulk storage and the piping between the bulk storage tank to the delivery fill location.

In Development

Charlotte Water / Construction

Irwin Creek WWTP Stormwater Improvements Project

  • Posting Number: 2026-Q2(Apr-Jun)-CW-19830
  • Anticipated Posting Date: 2026-05-01
  • Last Updated: 12/30/25
Add to Calendar 2026-05-01 2026-05-01 Irwin Creek WWTP Stormwater Improvements Project

This construction contract will replace existing diesel pumps with electric submersible pumps. This will be done at three locations at the existing stormwater outfall locations. The project will also include installation of permanent discharge piping at stormwater outfall 1. This will require electrical duct bank along with wiring and all necessary components to power the pumps.

1 2 8 9 10 47 48