/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Charlotte Department of Transportation / General Services

Driver Feedback Sign Services

  • Posting Number: 2024-Q2(Apr-Jun)-CDT-13629
  • Anticipated Posting Date: 2024-05-31
  • Last Updated: 03/01/24
Add to Calendar 2024-05-31 2024-05-31 Driver Feedback Sign Services

This contract will install, maintain, and remove/relocate CDOT’s inventory of portable Driver Feedback Signs. These battery-powered radar signs are deployed throughout the city on corridors that are selected by the CDOT Traffic Safety Section for up to six weeks per location. The selected contractor will be responsible for installing the signs in certain locations directed by CDOT, routinely checking the areas they are installed in to ensure they are properly functioning, and once the deployment time has ended for a selected area, removing the signs to be redeployed in another location.

In Development

Charlotte Department of Transportation / Construction

Traffic Signal Installation and Maintenance

  • Posting Number: 2024-Q2(Apr-Jun)-CDT-13594
  • Anticipated Posting Date: 2024-05-31
  • Last Updated: 03/01/24
Add to Calendar 2024-05-31 2024-05-31 Traffic Signal Installation and Maintenance

This traffic signal contract will provide resources to install and maintain traffic signals and support infrastructure citywide.

In Development

Charlotte Department of Transportation / Commodities & Goods

Solar Battery Replacements

  • Posting Number: 2024-Q2(Apr-Jun)-CDT-13722
  • Anticipated Posting Date: 2024-05-31
  • Last Updated: 03/01/24
Add to Calendar 2024-05-31 2024-05-31 Solar Battery Replacements

This contract will be for the replacement of solar batteries in the following equipment:

  • School Zone Flashers
  • Driver Feedback Signs
  • RRFBs
  • Warning Flashers
  • Regular batteries for other types of signal devices

In Development

Department of General Services / Construction

Idlewild Road and Monroe Road Intersection

  • Posting Number: 2025-Q2(Apr-Jun)-DGS-8922
  • Anticipated Posting Date: 2025-06-30
  • Last Updated: 02/14/24
Add to Calendar 2025-06-30 2025-06-30 Idlewild Road and Monroe Road Intersection

This project will improve the Idlewild Road and Monroe Road intersection to enhance conditions for all users. Improvements will include pavement widening to accommodate dual left turn lanes at all intersection approaches, bike lanes or multi-use paths, pedestrian refuge islands, and new sidewalks.

In Development

Charlotte Storm Water Services / Construction

Shamrock Drive Storm Drainage Improvement Project

  • Posting Number: 2024-Q2(Apr-Jun)-CSWS-3459
  • Anticipated Posting Date: 2024-06-15
  • Last Updated: 01/28/24
Add to Calendar 2024-06-15 2024-06-15 Shamrock Drive Storm Drainage Improvement Project

This construction project is located near The Plaza and Shamrock Drive and has been identified to address flooding, erosion, and pipe failure in the project area.

In Development

Charlotte Storm Water Services / Construction

Newell Stream Restoration Project

  • Posting Number: 2024-Q2(Apr-Jun)-CSWS-12167
  • Anticipated Posting Date: 2024-06-25
  • Last Updated: 12/12/23
Add to Calendar 2024-06-25 2024-06-25 Newell Stream Restoration Project

The Newell Stream Restoration Project is located near WT Harris Boulevard (NC 24) and Old Concord Road along a network of tributaries to Toby Creek. Project improvements include restoring approximately 2,500 LF of degraded stream channel, floodplain, and riparian buffer.

In Development

Charlotte Storm Water Services / Construction

Collective W (Multiple Isolated Storm Drainage Improvements Projects)

  • Posting Number: 2024-Q2(Apr-Jun)-CSWS-9972
  • Anticipated Posting Date: 2024-04-15
  • Last Updated: 11/15/23
Add to Calendar 2024-04-15 2024-04-15 Collective W (Multiple Isolated Storm Drainage Improvements Projects)

This project consists of multiple isolated storm drainage improvements projects located throughout the City of Charlotte. Projects include storm drainage replacement and sewer relocations within the street right-of-way and private, residential properties.

In Development

Charlotte Storm Water Services / Construction

Collective V (Multiple Isolated Storm Drainage Improvements Projects)

  • Posting Number: 2024-Q2(Apr-Jun)-CSWS-9970
  • Anticipated Posting Date: 2024-04-15
  • Last Updated: 11/15/23
Add to Calendar 2024-04-15 2024-04-15 Collective V (Multiple Isolated Storm Drainage Improvements Projects)

This project consists of multiple isolated storm drainage improvements projects located throughout the City of Charlotte. Projects include storm drainage improvements and replacement and repair of existing storm drainage system facilities within the street right-of-way and private, residential properties.

In Development

Charlotte Storm Water Services / Construction

Laurel Avenue Storm Drainage Improvement Project

  • Posting Number: 2025-Q2(Apr-Jun)-CSWS-9836
  • Anticipated Posting Date: 2025-04-16
  • Last Updated: 11/15/23
Add to Calendar 2025-04-16 2025-04-16 Laurel Avenue Storm Drainage Improvement Project

This project is bordered by Laurel Avenue to the north, Dotger Avenue to the south, Randolph Road to the east and Hempstead Place to the west.  The existing drainage system consists of closed pipe systems.  This drainage system is currently undersized and street flooding has been reported on Colville Road and building flooding has been reported on Cranbrook Lane.

1 2 7 8