|
The project will install pedestrian and bicycle facilities to connect Park South Drive to Park Road. Project will construct asphalt trail and pedestrian signals on Park Road and Park South Drive. Work also includes construction of concrete curb and gutter, curb ramps, storm drainage, traffic control and pavement markings. |





Originating from the Northeast Corridor Infrastructure (NECI) Program, this project proposes to provide a new street connection by extending McCullough Drive from North Tryon Street to the existing dead end at Ken Hoffman Drive. This project will include two travel lanes, planting strips, curb & gutter, asphalt milling and paving, storm drainage, utility relocation, erosion control, bike lanes, sidewalk, Post Construction Stormwater Ordinance (PCSO) underground storage vaults, and retaining wall improvements. This project will improve pedestrian and bicycle mobility between North Tryon Street and W.T. Harris Boulevard.