Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Charlotte Storm Water Services / Construction
Four Mile Creek Rd 9427 Storm Drainage Improvement Project

Charlotte Storm Water Services / Construction
Wood Dale Ter 2022 Storm Drainage Improvement Project
Project consists of removing a gabion wall and replacing it with a new segmental block wall. Minimal stream impacts will be made only to install wall. Partial storm system in ROW will be removed and replaced with no outfall impacts.

Charlotte Storm Water Services / Construction
Moorland Dr 3831 Storm Drainage Improvement Project
Moorland Dr is a double barrel culvert that is undersized. We are planning to upsize the culvert to a 12’x5’ box culvert

Charlotte Storm Water Services / Construction
Crestmont Drive (4724) Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after the review is complete.

Charlotte Storm Water Services / Construction
Craighead/Tryon Storm Drainage Improvement Project
The Craighead/Tryon Storm Drainage Improvement Project is bordered by Glory Street to the north, Little Sugar Creek to the south, Sugar Creek Road to the east and Craighead Road to the west. The existing drainage system consists of pipe system under city-maintained road, state-maintained road, and private property. The improvements include pipe system upgrades.

Charlotte Storm Water Services / Construction
718 Harwyn Dr. Storm Drainage Improvement Project
Project proposed to replace an existing culvert system under Harwyn Dr. with 2 – 3×5 box culverts, as well as a pipe cleaning effort through the triple 54” RCP culvert at downstream Eaves Ln.

Charlotte Storm Water Services / Construction
Reddman Road Storm Drainage Improvement Project
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, and channels. Work will also include working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within the street right-of-way or within storm drainage easements.

Charlotte Storm Water Services / Construction
Shamrock Drive Storm Drainage Improvement Project
This construction project is located near The Plaza and Shamrock Drive and has been identified to address flooding, erosion, and pipe failure in the project area.

Charlotte Storm Water Services / Construction
2500 Briargrove Dr. Storm Drainage Improvement Project
This project involves installing a closed drainage system down both Briargrove Dr. and Milton Rd. to reroute runoff from an existing stream. The proposed closed drainage system ties back into the existing culvert under Colby Pl.
Project initiated to address a failing 48” CMP culvert. The culvert crosses a high hazard dam with deficiency’s that will be addressed by a private HOA. The city intends to install approx. 80LF of 48” RCP and tie into an existing concrete flume; remove and replace approx. 40LF of 15” RCP; add (1) DCB; add (2) CBs; add (1) winged headwall