/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Archived

Charlotte Water / Construction

Taggart Creek Outfall Flow Diversion Structure-Cancelled

  • Posting Number: 2020-Q1(Jan-Mar)-CW-1305
  • Anticipated Posting Date: 2020-03-31
  • Last Updated: 11/15/20
Add to Calendar 2020-03-31 2020-03-31 Taggart Creek Outfall Flow Diversion Structure-Cancelled

Project consists of the design and construction of a flow diversion structure.

Archived

Charlotte Water / Construction

Six Mile Creek PS Improvements-Cancelled

  • Posting Number: 2020-Q1(Jan-Mar)-CW-1307
  • Anticipated Posting Date: 2020-03-31
  • Last Updated: 11/15/20
Add to Calendar 2020-03-31 2020-03-31 Six Mile Creek PS Improvements-Cancelled

The purpose of this project is to eliminate the long shafts between the pumps and motors. Custom motor stands will be built to position the motors over the pumps. The original two motors for this pump station will also be replaced.

Archived

Charlotte Water / Construction

Old Dowd Rd Airport 24-inch Water Main – Cancelled

  • Posting Number: 2020-Q1(Jan-Mar)-CW-1311
  • Anticipated Posting Date: 2020-03-31
  • Last Updated: 11/15/20
Add to Calendar 2020-03-31 2020-03-31 Old Dowd Rd Airport 24-inch Water Main – Cancelled

The project is approximately 3600 linear feet of 24 inch water main connecting the existing line at Old Down Road to the 24 inch line on the east side of the airport.

Archived

Charlotte Water / Construction

Long Creek Wastewater Treatment Plant – Cancelled

  • Posting Number: 2020-Q1(Jan-Mar)-CW-1333
  • Anticipated Posting Date: 2020-03-31
  • Last Updated: 11/15/20
Add to Calendar 2020-03-31 2020-03-31 Long Creek Wastewater Treatment Plant – Cancelled

This project provides for up to 11 million gallons per day (MGD) of capacity at a proposed treatment plant at Long Creek, near the Long Creek pump station.

Archived

Charlotte Water / Construction

Street and Minor Water Main Extensions -Cancelled

  • Posting Number: 2020-Q1(Jan-Mar)-CW-1351
  • Anticipated Posting Date: 2020-03-31
  • Last Updated: 11/15/20
Add to Calendar 2020-03-31 2020-03-31 Street and Minor Water Main Extensions -Cancelled

This contract provides for water service extensions to residential customers and extensions to customers experiencing health risks associated with well water per a City Council approved policy. The purpose of the program is to provide service to new customers.

Archived

Charlotte Water / Construction

Street and Minor Sewer Main Extension-Cancelled

  • Posting Number: 2020-Q1(Jan-Mar)-CW-1353
  • Anticipated Posting Date: 2020-03-31
  • Last Updated: 11/15/20
Add to Calendar 2020-03-31 2020-03-31 Street and Minor Sewer Main Extension-Cancelled

This contract provides for sewer service extensions to residential customers. Project also provides for extensions when health hazards arise in association with failed septic tanks, demand beyond capacity, or failure of on-site disposal systems.

Archived

Charlotte Water / Construction

GIS Facilities Mapping – Cancelled

  • Posting Number: 2021-Q1(Jan-Mar)-CW-1438
  • Anticipated Posting Date: 2021-01-01
  • Last Updated: 11/15/20
Add to Calendar 2021-01-01 2021-01-01 GIS Facilities Mapping – Cancelled

The project will cover aerial imagery and base mapping, maintain/replace survey equipment, easement mapping trimble licenses, and ESRI licenses.

Archived

Charlotte Water / Construction

Mallard Creek Wastewater Treatment Plant Solids Handling Improvements ... Mallard Creek Wastewater Treatment Plant Solids Handling Improvements – Cancelled

  • Posting Number: 2021-Q1(Jan-Mar)-CW-1465
  • Anticipated Posting Date: 2021-01-01
  • Last Updated: 11/15/20
Add to Calendar 2021-01-01 2021-01-01 Mallard Creek Wastewater Treatment Plant Solids Handling Improvements – Cancelled

This project consists of improvements to the solids screenings, primary sludge pumping, sludge heating, solids conveyance, secondary digester mixing, and polymer system upgrades.

Archived

Charlotte Water / Construction

Mallard Creek Wastewater Treatment Plant – Expansion and Improve ... Mallard Creek Wastewater Treatment Plant – Expansion and Improvements – Cancelled

  • Posting Number: 2021-Q1(Jan-Mar)-CW-1468
  • Anticipated Posting Date: 2021-01-01
  • Last Updated: 11/15/20
Add to Calendar 2021-01-01 2021-01-01 Mallard Creek Wastewater Treatment Plant – Expansion and Improvements – Cancelled

This study is necessary to increase treatment capacity of the Mallard Creek Wastewater Treatment Plant to 16 million gallons per day (MGD).

1 2 41 42 43 44 45