Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Charlotte Water / Construction
Plaza Storage Tank Reinforcement Main – CANCELLED

Charlotte Water / Construction
Roofing Replacement (W2R2) – Construction Package 10 Sugar Creek WWT ... Roofing Replacement (W2R2) – Construction Package 10 Sugar Creek WWTP
The Project consists of roof replacement for package 10 – Sugar Creek WWTP Administration Building, East EQ Electrical Building and Main Lift Pump Station.

Charlotte Department of Transportation / Construction
South Tryon St Intelligent Transportation System
This project will install approximately 2.1 miles of 24 count single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for eight existing traffic control cabinets and the installation of six traffic management cameras. The project limits are S Tryon Street beginning at West Boulevard to Clanton Road and then along Clanton Road to Barringer Drive. This project also includes fiber splicing, testing, Ethernet equipment communications, traffic management cameras and equipment and other related activities.

Charlotte Storm Water Services / Construction
Collective Storm Drainage Improvement Projects Series G
This is a collective series storm drainage improvement submittal which contains four (4) separate projects. The projects vary in size and each bring their unique differences. There will be pipe replacement varying in size from 15″- 48″ RCP and 38″x60″ elliptical RCP. Other project replacements include, curb, curb ramp, sidewalk, asphalt, driveways, storm drainage structures and sewer pipe. Project installation includes rip-rap aprons, CIPP liner for a range of pipe from 24″-42″, active shoring, storm drainage pipe and storm drainage structures. Some 24″ RCP will be plugged and filled with excavatable flowable fill.

Charlotte Storm Water Services / Construction
Tattersall Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.

Charlotte Water / General Services
Consulting & Program Management Services for Advanced Metering In ... Consulting & Program Management Services for Advanced Metering Infrastructure
Charlotte Water (CLTWater) is seeking qualified Company or Companies in Advanced Metering Infrastructure (AMI) to provide AMI Solution Consulting and Program Management services.
The Solution Consultant shall design an AMI Solution and provide reports, contracts, and other documentation to implement an AMI Solution. The Program Manager will ensure that all contractors/vendors adhere to contractual requirements and perform quality work. The Program Manager shall also validate that all AMI project objectives identified in the AMI-Assessment Report are achieved at the end of the project for CLTWater.

Charlotte Water / Construction
Ashe Plantation Phase II Upgrades – Re-Advertisement for Bids
The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two
clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation. This scope of work also includes the relocation of and existing 8” gravity sewer line.

City Wide / General Services
On-Call Fencing Installation and Repair Services – CANCELLED
The City is requesting proposals for fencing installation and repair services needed to meet security requirements and ensure the protection of facilities and property while also providing safety in areas with limited or prohibited access.

Housing & Neighborhood Services / General Services
Druid Hills Architectural Survey Services for Historical Preservation ... Druid Hills Architectural Survey Services for Historical Preservation Planning & Analysis
The services shall include the following:
All work will be done according to federal and state architectural survey standards and under the supervision of HPO staff. The survey project will be conducted in accordance with the HPO Environmental Review Branch, Historic Structure Survey Report (HSSR) Standards (2019). The HSSR Standards are posted on the HPO website at
https://www.ncdcr.gov/nc-state-historic-preservation-office/Section106_HSSR_Standards
This project includes construction of approximately 6,000 LF of 24 inch water main.