Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
Charlotte Water / Construction
Large Diameter Sanitary Sewer Rehabilitation-Cancelled
Charlotte Water / Construction
Brookshire Campus Project – Cancelled
This project reviews the Franklin campus as a working facility for both Charlotte Water office personnel and Treatment Plant Operations.
Charlotte Water / Construction
New Service Installation Water – Cancelled
Combined with another project
Charlotte Water / Construction
Energy Optimization – Pumping – Cancelled
This project will evaluate all pumping units in the water system.
Charlotte Water / Construction
PS & WAS Pipelines from Irwin to McAlpine-Cancelled
Two separate lines will be needed for the solids transfer to handle the PS and WAS respectively. The PS & WAS Pipelines from Irwin Creek to McAlpine Creek Wastewater Treatment Plant will be approximately 12 miles.
Charlotte Water / Construction
PS & WAS Pipeline from Long Creek to Irwin Creek-Cancelled
Two separate lines will be needed for the solids transfer to handle the primary sludge (PS) and Waste Activated Sludge (WAS) respectively. The PS & WAS Pipelines from Long Creek to Irwin Creek will be approximately 12 miles.
Charlotte Water / Construction
Taggart Creek Outfall Flow Diversion Structure-Cancelled
Project consists of the design and construction of a flow diversion structure.
Charlotte Water / Construction
Six Mile Creek PS Improvements-Cancelled
The purpose of this project is to eliminate the long shafts between the pumps and motors. Custom motor stands will be built to position the motors over the pumps. The original two motors for this pump station will also be replaced.
Charlotte Water / Construction
Old Dowd Rd Airport 24-inch Water Main – Cancelled
The project is approximately 3600 linear feet of 24 inch water main connecting the existing line at Old Down Road to the 24 inch line on the east side of the airport.
This project provides for rehabilitation, repair and replacement of sewers greater than 16-inch in diameter.