/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Archived

Charlotte Water / Construction

978 Zone PCCP Replacement Main- Cancelled

  • Posting Number: 2020-Q1(Jan-Mar)-CW-1539
  • Anticipated Posting Date: 2020-03-31
  • Last Updated: 11/14/20
Add to Calendar 2020-03-31 2020-03-31 978 Zone PCCP Replacement Main- Cancelled

Proposed 32,000 linear feet of 12-inch water main extending north from 978 zone resiliency booster pump station.

Archived

Charlotte Water / Construction

960 Zone West-East Transmission Main – Cancelled

  • Posting Number: 2020-Q1(Jan-Mar)-CW-1541
  • Anticipated Posting Date: 2020-03-31
  • Last Updated: 11/14/20
Add to Calendar 2020-03-31 2020-03-31 960 Zone West-East Transmission Main – Cancelled

16,000 linear feet (LF) of 30-inch between existing 30-inch on Albemarle Rd and the Wilgrove EST

Archived

Charlotte Water / Construction

960 Zone North-South Transmission Main – Cancelled

  • Posting Number: 2020-Q1(Jan-Mar)-CW-1543
  • Anticipated Posting Date: 2020-03-31
  • Last Updated: 11/14/20
Add to Calendar 2020-03-31 2020-03-31 960 Zone North-South Transmission Main – Cancelled

30,500 LF of 30-inch between Idlewild discharge main and Hickory Grove EST

Archived

Charlotte Water / Construction

Can Style Lift Stations Phase I – Cancelled

  • Posting Number: 2018-Q1(Jan-Mar)-CW-1927
  • Anticipated Posting Date: 2018-02-27
  • Last Updated: 11/14/20
Add to Calendar 2018-02-27 2018-02-27 Can Style Lift Stations Phase I – Cancelled

Removal and replacing existing control panels of each lift station, and other miscellaneous site work for installation of a new control cabinet and meter vault.

Archived

Charlotte Water / Commodities & Goods

Chemical Root Control-Cancelled

  • Posting Number: 2020-Q1(Jan-Mar)-CW-1141
  • Anticipated Posting Date: 2020-03-31
  • Last Updated: 11/09/20
Add to Calendar 2020-03-31 2020-03-31 Chemical Root Control-Cancelled

Provide Chemical root control treatment of approximately 1,742,800 feet of sanitary sewer lines

Archived

Charlotte Water / Construction

Upper Taggart Creek Outfall Replacement

  • Posting Number: 2021-Q1(Jan-Mar)-CW-1303
  • Anticipated Posting Date: 2021-03-31
  • Last Updated: 04/07/20
Add to Calendar 2021-03-31 2021-03-31 Upper Taggart Creek Outfall Replacement

Project includes the construction of approximately 10,200 linear feet of 36, 30, 24, and 18 inch gravity sewer to address capacity concerns in the Upper Taggart Creek Outfall.

Archived

Charlotte Water / Construction

Thermal Hydrolysis System at McAlpine

  • Posting Number: 2020-Q1(Jan-Mar)-CW-1152
  • Anticipated Posting Date: 2020-03-31
  • Last Updated: 04/07/20
Add to Calendar 2020-03-31 2020-03-31 Thermal Hydrolysis System at McAlpine

The proposed project is to fund the design and construction of a two train thermal hydrolysis system at McAlpine Wastewater Treatment Plant.

Archived

Charlotte Water / Construction

Water Quality Sampling Stations

  • Posting Number: 2020-Q1(Jan-Mar)-CW-1408
  • Anticipated Posting Date: 2020-03-31
  • Last Updated: 04/07/20
Add to Calendar 2020-03-31 2020-03-31 Water Quality Sampling Stations

Installation of auto flushers, zone boundary bypass assemblies, and other water quality improvement installations.

Archived

Charlotte Water / General Services

Odor Scrubber Units

  • Posting Number: 2020-Q1(Jan-Mar)-CW-1143
  • Anticipated Posting Date: 2020-03-31
  • Last Updated: 04/07/20
Add to Calendar 2020-03-31 2020-03-31 Odor Scrubber Units

provide odor scrubbers for Charlotte Water lift stations

1 2 38 39 40