/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Archived

Charlotte Water / Construction

Catawba Pump Station Rehabilitation Project

  • Posting Number: 2021-Q1(Jan-Mar)-CW-2782
  • Anticipated Posting Date: 2021-01-20
  • Last Updated: 01/21/21
Add to Calendar 2021-01-20 2021-01-20 Catawba Pump Station Rehabilitation Project

The Project site is the Catawba Raw Water Pump Station located on Mountain Island Lake, owned & operated by Charlotte Water. The site address is 12548 Pump Station Rd, Charlotte, NC 28216. The work under this project will be primarily in Cells #2 & 3. The electrical work consists of changing the Cell #3 voltage from 2300V to 4160V, including new switchgear, synchronous motor, conduit, cable, etc. as well as re-winding an existing electric pump motor. The civil/mechanical work consists of rebuilding/replacing screens, rehabbing cone valves, and installing a new flow meter vault. The structural work consists of new electrical vault, drywall electrical room, masonry, doors, windows, louvers, and fans. This project also includes upgrades to the fire alarm system for the entire Catawba Pump Station facility.

Archived

City Wide / Commodities & Goods

Electrical, Lighting & Data Comm Equip and Support – CANCEL ... Electrical, Lighting & Data Comm Equip and Support – CANCELLED

  • Posting Number: 2021-Q1(Jan-Mar)-CTW-1442
  • Anticipated Posting Date: 2021-01-01
  • Last Updated: 01/20/21
Add to Calendar 2021-01-01 2021-01-01 Electrical, Lighting & Data Comm Equip and Support – CANCELLED

Electrical, lighting & data comm equipment & support for Citywide use

Archived

Aviation / Construction

Centralized Receiving and Distribution Center (Construction)

  • Posting Number: 2019-Q1(Jan-Mar)-AVI-1280
  • Anticipated Posting Date: 2019-03-04
  • Last Updated: 01/18/21
Add to Calendar 2019-03-04 2019-03-04 Centralized Receiving and Distribution Center (Construction)

Construct a new Centralized Receiving and Distribution Center (CRDC) on the south side of the airport.  CRDC will provide additional receiving and distribution space to support the growing delivery  operations for the airport, reducing the overall vendor traffic  in the terminal.

Archived

Aviation / Construction

Asphalt Taxiway & Runway Improvements (Construction)

  • Posting Number: 2018-Q1(Jan-Mar)-AVI-1288
  • Anticipated Posting Date: 2018-02-06
  • Last Updated: 01/18/21
Add to Calendar 2018-02-06 2018-02-06 Asphalt Taxiway & Runway Improvements (Construction)

This project is related to on-going maintenance and repair project for asphalt pavement around the Airport’s Airfield, including runways and taxiways. The typical scope of work involves milling and resurfacing heavily-used areas of runways and taxiways, which will usually involve working during night-time hours, in order to minimize impacts to Airport Operations,

Archived

Aviation / Architectural / Engineering Services

Central Energy Plant (Design)

  • Posting Number: 2016-Q1(Jan-Mar)-AVI-1282
  • Anticipated Posting Date: 2016-03-31
  • Last Updated: 01/12/21
Add to Calendar 2016-03-31 2016-03-31 Central Energy Plant (Design)

The Central Energy Plant is part of the Terminal Lobby Expansion Construction Management at Risk Project.

Provide for design of space for a new central energy plant to be located on the first level. The central energy plant will be for the New Terminal Expansion, but will also include space for current and future infield development.

Archived

Charlotte Water / Construction

FY21 Water and Sewer Repairs

  • Posting Number: 2021-Q1(Jan-Mar)-CW-2770
  • Anticipated Posting Date: 2021-01-06
  • Last Updated: 01/12/21
Add to Calendar 2021-01-06 2021-01-06 FY21 Water and Sewer Repairs

The Project consists of water and sewer repair for various streets, highways, parcels, and utility easements within Mecklenburg County.

Archived

Aviation / Construction

Fixed Base Operator Renovations (Construction)

  • Posting Number: 2016-Q1(Jan-Mar)-AVI-1274
  • Anticipated Posting Date: 2016-03-23
  • Last Updated: 01/07/21
Add to Calendar 2016-03-23 2016-03-23 Fixed Base Operator Renovations (Construction)

Construction of a new 2-story, 33,000 sf passenger charter terminal to be operated by Wilson Air Center, the Fixed Base Operator (FBO) for General Aviation Aircraft.

Archived

Charlotte Water / General Services

Catering Services

  • Posting Number: 2021-Q1(Jan-Mar)-CW-3593
  • Anticipated Posting Date: 2021-01-06
  • Last Updated: 01/06/21
Add to Calendar 2021-01-06 2021-01-06 Catering Services

The goal of this RFP is to create multiple contracts for catering services, to be used for numerous event types.  Event types are typically meetings, luncheons, new-hire orientations, City, state, or federally declared emergency events (pre-, during, and post-event), and trainings.  Each event requiring catering services will have a varying number of persons and thus an estimated headcount is not available, nor is a schedule of upcoming events.  Event details will be provided to the Company when services are needed.

Archived

Aviation / Construction

Wide Body Gate Upgrades – CANCELLED

  • Posting Number: 2022-Q1(Jan-Mar)-AVI-3124
  • Anticipated Posting Date: 2022-03-28
  • Last Updated: 01/06/21
Add to Calendar 2022-03-28 2022-03-28 Wide Body Gate Upgrades – CANCELLED

SOW  Upgrading gates for Transportation Services.

Cancelled – This project was consolidated into the Private Access Drive – Construction project.

1 2 37 38 39 42 43