/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Archived

Charlotte Water / Construction

FY21 Unspecified Time and Materials Water & Sewer Repairs

  • Posting Number: 2021-Q1(Jan-Mar)-CW-4877
  • Anticipated Posting Date: 2021-03-30
  • Last Updated: 04/05/21
Add to Calendar 2021-03-30 2021-03-30 FY21 Unspecified Time and Materials Water & Sewer Repairs

The Project consists of providing equipment, vehicles, machinery, implements, tools, supplies, incidentals, and skilled personnel to complete unspecified modifications, maintenance, and repairs to existing water and sewer lines in the Charlotte Water service area.

Archived

Charlotte Water / Construction

Irwin Rehabilitation Improvements

  • Posting Number: 2021-Q1(Jan-Mar)-CW-4890
  • Anticipated Posting Date: 2021-03-31
  • Last Updated: 04/05/21
Add to Calendar 2021-03-31 2021-03-31 Irwin Rehabilitation Improvements

The Project consists of work in multiple process areas as follows:

  • Replacement of the roof and HVAC equipment at the Administration building.
  • Modifications to the existing grit removal chamber at the flow equalization facilities to include a 7-foot Parshall flume.
  • Spot concrete, sealant, and pavement repairs at the flow equalization facilities.
  • Installation of a third mechanical bar screen in the existing Influent Pump Station. The new mechanical screen is pre-purchased by the Owner. The Contractor will administer submittals and handle receipt, installation, startup, testing, and commissioning.
  • Installation of a new eductor system on all the Influent pumps to automatically vent the pump casings.
  • Modifications to the 18-inch discharge piping of two influent pumps.
  • Installation of a new process analyzer (Chemscan) near the Aeration Basins. The analyzer equipment, FRP enclosure, and sample pumps are pre-purchased by the Owner. The Contractor will administer submittals and handle receipt, installation, startup, testing, and commissioning.
  • Modifications to the plant’s effluent piping (42 and 30 inches in diameter) including replacement of a flowmeter vault with a new vault. The new meter will be provided by the Owner. This work will require bypass pumping.
  • Replacement of the roof and select HVAC equipment at the Old Chlorine Building (Additive Alternate 1).

Archived

Charlotte Storm Water Services / Construction

Storm Water Repair and Improvement FY2021-D

  • Posting Number: 2021-Q1(Jan-Mar)-CSWS-4840
  • Anticipated Posting Date: 2021-03-26
  • Last Updated: 04/05/21
Add to Calendar 2021-03-26 2021-03-26 Storm Water Repair and Improvement FY2021-D

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.

 

Archived

Charlotte Storm Water Services / Construction

Storm Water Repair and Improvement FY2021-F

  • Posting Number: 2021-Q1(Jan-Mar)-CSWS-4844
  • Anticipated Posting Date: 2021-03-26
  • Last Updated: 04/05/21
Add to Calendar 2021-03-26 2021-03-26 Storm Water Repair and Improvement FY2021-F

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.

Archived

Charlotte Storm Water Services / Construction

Storm Water Repair and Improvement FY2021-E

  • Posting Number: 2021-Q1(Jan-Mar)-CSWS-4842
  • Anticipated Posting Date: 2021-03-30
  • Last Updated: 04/05/21
Add to Calendar 2021-03-30 2021-03-30 Storm Water Repair and Improvement FY2021-E

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.

Archived

Charlotte Storm Water Services / Construction

Storm Water Repair and Improvement FY2021-G

  • Posting Number: 2021-Q1(Jan-Mar)-CSWS-4846
  • Anticipated Posting Date: 2021-03-29
  • Last Updated: 04/05/21
Add to Calendar 2021-03-29 2021-03-29 Storm Water Repair and Improvement FY2021-G

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.

Archived

City Wide / Commodities & Goods

Citywide Uniforms and Related Equipment and Services

  • Posting Number: 2021-Q1(Jan-Mar)-CTW-2480
  • Anticipated Posting Date: 2021-03-24
  • Last Updated: 03/30/21
Add to Calendar 2021-03-24 2021-03-24 Citywide Uniforms and Related Equipment and Services

This is a City-wide solicitation  to purchase uniforms, related equipment, and services including, but not limited to dress uniforms, long and short sleeve shirts, pants, hats, ties, leather belts, outerwear and shoes.   This also includes fitting, tailoring, measuring service, account management and other related services for a period of three years with the option to extend the contract for two additional one-year terms.

Archived

Charlotte Water / Construction

McAlpine Creek WWMF Nutrient Harvesting

  • Posting Number: 2021-Q1(Jan-Mar)-CW-4500
  • Anticipated Posting Date: 2021-03-02
  • Last Updated: 03/23/21
Add to Calendar 2021-03-02 2021-03-02 McAlpine Creek WWMF Nutrient Harvesting

While nutrient harvesting has not yet been implemented by CLTWater at any  of its wastewater treatment facilities, CLTWater strives to promote beneficial reuse at the McAlpine Creek WWMF and across its other wastewater treatment facilities.  To maximize economies of scale, a nutrient harvesting facility (Facility) at the McAlpine Creek WWMF would create the highest current and future value proposition for CLTWater and the treatment plant network.  Currently, primary sludge (PS) and waste activated sludge (WAS) from two of the five wastewater treatment facilities are processed at McAlpine Creek WWMF.

In the future, PS and WAS from four of six wastewater treatment facilities will be processed at the McAlpine Creek WWMF.  Dewatering centrate is high strength waste typically recycled within the treatment plant for processing.  Implementation of a Facility would allow CLTWater to create a product that can be beneficially reused (i.e., product to be bagged or bulk shipped and sold) and gain some treatment capacity at the McAlpine Creek WWMF. Designing, constructing, and operating the Facility at the McAlpine Creek WWMF is one component of implementing the overall CLTWater nutrient management and biosolids diversification strategy.

Archived

Charlotte Water / General Services

Door Automation Equipment Installation, Maintenance, and Repair Servic ... Door Automation Equipment Installation, Maintenance, and Repair Services

  • Posting Number: 2021-Q1(Jan-Mar)-CW-4099
  • Anticipated Posting Date: 2021-02-19
  • Last Updated: 03/19/21
Add to Calendar 2021-02-19 2021-02-19 Door Automation Equipment Installation, Maintenance, and Repair Services

The Company will provide on-call installation, maintenance, and repair of door automation mechanisms across all Charlotte Water locations to aid the department’s initiative of having more touchless and automatic door operations.  Doors and related hardware (e.g. door frames and thresholds) related to automating operations may also be required as an inherit activity of providing such services.

1 2 33 34 35 44 45