/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Archived

Charlotte Water / Architectural / Engineering Services

FY23 Professional Engineering and Land Survey Services for Watermain a ... FY23 Professional Engineering and Land Survey Services for Watermain and Sanitary Sewer Street Main Design/Extensions Contract #3 – CANCELLED

  • Posting Number: 2022-Q2(Apr-Jun)-CW-7384
  • Anticipated Posting Date: 2022-04-01
  • Last Updated: 03/08/22
Add to Calendar 2022-04-01 2022-04-01 FY23 Professional Engineering and Land Survey Services for Watermain and Sanitary Sewer Street Main Design/Extensions Contract #3 – CANCELLED

This contract is for professional services in support of the Design and Construction Division. These contracts will allow Design and Construction to assist with LCR projects which typically require a longer and more complicated design process which in turn is more costly. Examples of reasons for increased cost in LCR projects versus typical street main extensions would be the need for geotechnical investigation or wetlands investigation and permitting.

Archived

Charlotte Water / Architectural / Engineering Services

FY23 Professional Engineering and Land Survey Services for Watermain a ... FY23 Professional Engineering and Land Survey Services for Watermain and Sanitary Sewer Street Main Design/Extensions Contract #2 – CANCELLED

  • Posting Number: 2022-Q2(Apr-Jun)-CW-7386
  • Anticipated Posting Date: 2022-04-01
  • Last Updated: 03/08/22
Add to Calendar 2022-04-01 2022-04-01 FY23 Professional Engineering and Land Survey Services for Watermain and Sanitary Sewer Street Main Design/Extensions Contract #2 – CANCELLED

This contract is for professional services in support of the Design and Construction Division. These contracts will allow Design and Construction to assist with LCR projects which typically require a longer and more complicated design process which in turn is more costly. Examples of reasons for increased cost in LCR projects versus typical street main extensions would be the need for geotechnical investigation or wetlands investigation and permitting.

Archived

Charlotte Water / Construction

FY23 Professional Engineering and Land Survey Services for Watermain a ... FY23 Professional Engineering and Land Survey Services for Watermain and Sanitary Sewer Street Main Design/Extensions Contract #1 – CANCELLED

  • Posting Number: 2022-Q2(Apr-Jun)-CW-7382
  • Anticipated Posting Date: 2022-04-15
  • Last Updated: 03/08/22
Add to Calendar 2022-04-15 2022-04-15 FY23 Professional Engineering and Land Survey Services for Watermain and Sanitary Sewer Street Main Design/Extensions Contract #1 – CANCELLED

This contract is for professional services in support of the Design and Construction Division. These contracts will allow Design and Construction to assist with LCR projects which typically require a longer and more complicated design process which in turn is more costly. Examples of reasons for increased cost in LCR projects versus typical street main extensions would be the need for geotechnical investigation or wetlands investigation and permitting.

Archived

Charlotte Storm Water Services / Construction

Severn (3739) Storm Drainage Improvement Project

  • Posting Number: 2021-Q2(Apr-Jun)-CSWS-3441
  • Anticipated Posting Date: 2021-04-27
  • Last Updated: 02/21/22
Add to Calendar 2021-04-27 2021-04-27 Severn (3739) Storm Drainage Improvement Project

This construction project is located in Beverly Woods and will improve the storm drainage infrastructure and repair failing infrastructure in order to reduce flooding of streets, properties and structures.

Archived

Aviation / Construction

North End Around Taxiway Early Cabling Project has been combine – ... North End Around Taxiway Early Cabling Project has been combine – CANCELLED

  • Posting Number: 2022-Q2(Apr-Jun)-AVI-7135
  • Anticipated Posting Date: 2022-04-25
  • Last Updated: 01/26/22
Add to Calendar 2022-04-25 2022-04-25 North End Around Taxiway Early Cabling Project has been combine – CANCELLED

One of seven remaining bid packages within the North End Around Taxiway Program. The construction of the NEAT Early Cabling Project provides for temporary direct-buried power cables from the existing power transformer at the existing RW 36C Approach Localizer Emergency Generator to the existing transformer at the existing Runway 18C Approach Glideslope Shelter in locations with minimal impacts from the proposed NEAT 1st Package construction within the NEAT program.

Archived

Charlotte Water / Construction

FY22 New Services Miscellaneous Contract #2 – CANCELLED

  • Posting Number: 2022-Q2(Apr-Jun)-CW-5741
  • Anticipated Posting Date: 2022-04-01
  • Last Updated: 01/14/22
Add to Calendar 2022-04-01 2022-04-01 FY22 New Services Miscellaneous Contract #2 – CANCELLED

Ongoing contract for installation of large water and sewer services as requested for commercial/residential use.  Also includes opportunities for short street main extensions (< 100′), fire hydrant relocations and dismantlements as related to new requests

Archived

City Wide / General Services

Emergency Cleanup Services

  • Posting Number: 2021-Q2(Apr-Jun)-CTW-5382
  • Anticipated Posting Date: 2021-05-25
  • Last Updated: 08/04/21
Add to Calendar 2021-05-25 2021-05-25 Emergency Cleanup Services

The City is responsible for maintaining a portfolio of approximately 180 buildings, including offices, fire stations, police division offices, and equipment shops, that house various City activities.  The City also maintains cultural facilities, including museums and arenas that serve as venues for sports, entertainment, and other events.  Contracts resulting from this RFP may be used by various City departments for needs across the entire City organization, including the Airport and the Charlotte Area Transit System (CATS).

 

The Company shall provide Emergency Mitigation Clean-Up Services at various locations as identified by the City.  This work will consist of rapid response for containment, demolition, disposal, drying, cleaning and decontamination as needed per IICRC standards and RIA guidelines on a per-incident basis for water and/or smoke damage.  Services consists of providing all labor, materials, equipment, and supervision for the services as directed by the City’s Project Manager.

Archived

Aviation / General Services

Landscape Maintenance Zone 3

  • Posting Number: 2021-Q2(Apr-Jun)-AVI-5204
  • Anticipated Posting Date: 2021-05-11
  • Last Updated: 08/04/21
Add to Calendar 2021-05-11 2021-05-11 Landscape Maintenance Zone 3

The Charlotte Douglas International Airport (CLT) seeks to award a contract for Landscaping Maintenance Services of common areas including facilities, roadways, field & drainage areas and inclusive of turf, shrubs, ground cover and trees, mulching, fall over seeding, bedding areas, annual color, trash control, and chemical application. Zone 3 is primarily roadway moving with limited bedding areas.

All work must meet accepted standards as set forth in industry documents and this scope of services. The Contractor must be able to perform the majority of work each weekday (Monday – Friday) with litter control occurring each day of the week including weekends. Work may on occasion be required on Saturday or at night to accommodate traffic and safety concerns upon the
site.

Work is divided between regular maintenance which is performed daily or weekly and yearly maintenance listed as annual for work that occurs an average of one each year. The Contractor shall furnish all material, labor, tools, supplies, equipment, transportation, superintendence, insurance, taxes, contributions and all services and facilities unless specifically excepted, required to maintain the property

Archived

Aviation / Construction

Overflow Lots 1 & 2 Asphalt Patching (Construction)

  • Posting Number: 2021-Q2(Apr-Jun)-AVI-5745
  • Anticipated Posting Date: 2021-06-30
  • Last Updated: 08/04/21
Add to Calendar 2021-06-30 2021-06-30 Overflow Lots 1 & 2 Asphalt Patching (Construction)

This project will consist of Asphalt Patching in Overflow Parking for Lots 1 & 2.:

1. Approximately 7,500 square feet of asphalt patching at 2” depth per NCDOT Standards
2. Approximately 3,200 square feet of asphalt patching at 10.5” depth per standard below.

Compact 6” ABC stone will be included, as needed, estimated at 100 tons.

These areas will be identified/confirmed on site prior to commencement of work.  Parking lots will be empty and clear of vehicles during this work.

1 2 32 33 34 43 44