/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Archived

Charlotte Water / Construction

Fuda Creek Trunk Sewer Installation Project – CANCELLED

  • Posting Number: 2021-Q4(Oct-Dec)-CW-1482
  • Anticipated Posting Date: 2021-12-01
  • Last Updated: 06/21/21
Add to Calendar 2021-12-01 2021-12-01 Fuda Creek Trunk Sewer Installation Project – CANCELLED

Project provides for a trunk sewer along the Fuda Creek. Total length of sewer line would be approximately 3,600 linear feet (LF).

Archived

Charlotte Water / Construction

Brief Road Water Main Extension – CANCELLED

  • Posting Number: 2021-Q4(Oct-Dec)-CW-1509
  • Anticipated Posting Date: 2021-10-01
  • Last Updated: 06/21/21
Add to Calendar 2021-10-01 2021-10-01 Brief Road Water Main Extension – CANCELLED

This project is located in Mint Hill. It includes extending the water main along Brief Road using approximately 8,700 feet of 12 inch water main.

Archived

Charlotte Water / Construction

East Rocky River Rd to Shearer Rd Davidson Extension 16/12 Water Main ... East Rocky River Rd to Shearer Rd Davidson Extension 16/12 Water Main Extension – CANCELLED

  • Posting Number: 2021-Q4(Oct-Dec)-CW-1484
  • Anticipated Posting Date: 2021-12-01
  • Last Updated: 06/21/21
Add to Calendar 2021-12-01 2021-12-01 East Rocky River Rd to Shearer Rd Davidson Extension 16/12 Water Main Extension – CANCELLED

Water main extension along East Rocky River Road in Davidson; approximately 11,600 LF of 16″ water main; approximately 4200 LF of 12″ from intersection south to 12″ connection on Shearer and Dembridge.

Archived

Charlotte Water / Construction

Campus Ridge Road Gravity Sewer Project – CANCELLED

  • Posting Number: 2021-Q4(Oct-Dec)-CW-1507
  • Anticipated Posting Date: 2021-12-01
  • Last Updated: 06/21/21
Add to Calendar 2021-12-01 2021-12-01 Campus Ridge Road Gravity Sewer Project – CANCELLED

This project provides for the design and construction of approximately 3,000 feet of 12-inch gravity sewer to server Campus Ridge Road in South Charlotte.

Archived

Charlotte Water / Construction

Plaza Storage Tank Reinforcement Main – CANCELLED

  • Posting Number: 2021-Q4(Oct-Dec)-CW-1226
  • Anticipated Posting Date: 2021-10-01
  • Last Updated: 06/21/21
Add to Calendar 2021-10-01 2021-10-01 Plaza Storage Tank Reinforcement Main – CANCELLED

This project includes construction of approximately 6,000 LF of 24 inch water main.

Archived

Charlotte Water / Construction

Roofing Replacement (W2R2) – Construction Package 10 Sugar Creek WWT ... Roofing Replacement (W2R2) – Construction Package 10 Sugar Creek WWTP

  • Posting Number: 2020-Q4(Oct-Dec)-CW-3036
  • Anticipated Posting Date: 2020-12-03
  • Last Updated: 06/16/21
Add to Calendar 2020-12-03 2020-12-03 Roofing Replacement (W2R2) – Construction Package 10 Sugar Creek WWTP

The Project consists of roof replacement for package 10 – Sugar Creek WWTP Administration Building, East EQ Electrical Building and Main Lift Pump Station.

Archived

Charlotte Department of Transportation / Construction

South Tryon St Intelligent Transportation System

  • Posting Number: 2020-Q4(Oct-Dec)-CDT-3421
  • Anticipated Posting Date: 2020-12-02
  • Last Updated: 06/16/21
Add to Calendar 2020-12-02 2020-12-02 South Tryon St Intelligent Transportation System

This project will install approximately 2.1 miles of 24 count single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for eight existing traffic control cabinets and the installation of six traffic management cameras. The project limits are S Tryon Street beginning at West Boulevard to Clanton Road and then along Clanton Road to Barringer Drive. This project also includes fiber splicing, testing, Ethernet equipment communications, traffic management cameras and equipment and other related activities.

Archived

Charlotte Storm Water Services / Construction

Collective Storm Drainage Improvement Projects Series G

  • Posting Number: 2020-Q4(Oct-Dec)-CSWS-2583
  • Anticipated Posting Date: 2020-10-19
  • Last Updated: 06/04/21
Add to Calendar 2020-10-19 2020-10-19 Collective Storm Drainage Improvement Projects Series G

This is a collective series storm drainage improvement submittal which contains four (4) separate projects. The projects vary in size and each bring their unique differences. There will be pipe replacement varying in size from 15″- 48″ RCP and 38″x60″ elliptical RCP. Other project replacements include, curb, curb ramp, sidewalk, asphalt, driveways, storm drainage structures and sewer pipe. Project installation includes rip-rap aprons, CIPP liner for a range of pipe from 24″-42″, active shoring, storm drainage pipe and storm drainage structures. Some 24″ RCP will be plugged and filled with excavatable flowable fill.

Archived

Charlotte Storm Water Services / Construction

Tattersall Storm Drainage Improvement Project

  • Posting Number: 2019-Q4(Oct-Dec)-CSWS-1210
  • Anticipated Posting Date: 2019-12-31
  • Last Updated: 06/02/21
Add to Calendar 2019-12-31 2019-12-31 Tattersall Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

1 2 31 32 33 38 39