Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Archived

Aviation / General Services

CANCELLED – HVAC Replacements at Wilson Air Main Terminal

  • Posting Number: 2022-Q1(Jan-Mar)-AVI-4128
  • Anticipated Posting Date: 2022-01-03
  • Last Updated: 01/03/22
Add to Calendar 2022-01-03 2022-01-03 CANCELLED – HVAC Replacements at Wilson Air Main Terminal

This solicitation will involve replacing split system air conditioning units and reheat coils according to drawings produced by an engineer. There are five (5) split systems along with twenty-five (25) reheat coils to be replaced. This equipment was installed during the original construction of the building. In this project, we are replacing the entire system, including the controls. This project is estimated to be less than 6 months.

Archived

Department of General Services / Construction

West Mallard Creek Church Road Shared- Use Path

  • Posting Number: 2022-Q1(Jan-Mar)-DGS-4986
  • Anticipated Posting Date: 2022-02-08
  • Last Updated: 01/02/22
Add to Calendar 2022-02-08 2022-02-08 West Mallard Creek Church Road Shared- Use Path

This project is being built to add sidewalks as part of the city’s Capital Investment Fund to provide a safe, efficient, comfortable pedestrian system to improve the quality of life of its residents, visitors, and businesses. Improvements will be provided along the south side of West Mallard Creek  Church Road, from Mallard Creek Road to roughly 600′ east of Claude Freeman Drive. The project proposes a 12 ft. shared-use path, a typical 8 ft. planting strip (where possible), signalization and intersection improvements at David Taylor Drive, and intersection improvements at Claude Freeman Drive.

Archived

Aviation / Construction

North End Around Taxiway Pavement and Lighting – (Cancelled)

  • Posting Number: 2023-Q1(Jan-Mar)-AVI-3130
  • Anticipated Posting Date: 2023-01-09
  • Last Updated: 12/21/21
Add to Calendar 2023-01-09 2023-01-09 North End Around Taxiway Pavement and Lighting – (Cancelled)

One of seven bid packages within the North End Around Taxiway Program. This work includes the construction of the North End Around Taxiway (NEAT) to make it fully operational.  Major work items in this package include minor grading, concrete taxiway paving, related airfield lighting, pavement markings and signage

Archived

Charlotte Water / General Services

Stone Hauling Services – CANCELLED

  • Posting Number: 2022-Q1(Jan-Mar)-CW-5697
  • Anticipated Posting Date: 2022-03-15
  • Last Updated: 11/03/21
Add to Calendar 2022-03-15 2022-03-15 Stone Hauling Services – CANCELLED

Charlotte Water will establish a contract for as-needed hauling, delivery, and other inherently related activities of crushed stone to Charlotte Water locations.  All crushed stone and related items will be purchased from the City’s contracted crushed stone vendor (TBD).

Cancelled – These services will be combined with the citywide contract for the purchase of crushed stone.

Archived

Charlotte Department of Transportation / Construction

West Boulevard ITS – CANCELLED

  • Posting Number: 2022-Q1(Jan-Mar)-CDT-1683
  • Anticipated Posting Date: 2022-01-01
  • Last Updated: 10/21/21
Add to Calendar 2022-01-01 2022-01-01 West Boulevard ITS – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

Archived

Charlotte Area Transit System / General Services

Cancelled CATS Rail Pest Control for Right of Way and Light Rail Vehic ... Cancelled CATS Rail Pest Control for Right of Way and Light Rail Vehicles

  • Posting Number: 2022-Q1(Jan-Mar)-CATS-3823
  • Anticipated Posting Date: 2022-01-01
  • Last Updated: 10/18/21
Add to Calendar 2022-01-01 2022-01-01 Cancelled CATS Rail Pest Control for Right of Way and Light Rail Vehicles

This Request for Quote will be for pest control services of CATS Rail Operations Light Rail Vehicles (LRV) fleet and Right-Of-Ways (ROW). These services are monthly & quarterly pest control services. The services must be performed during the hours of 1:00AM to 4:00PM at two different CATS Rail Operations facilities. The amount of LRV’s are an estimated number of 48. The ROW includes 32 structures including substations and signal houses within the ROW.

 

 

PSR 812

Archived

Charlotte Water / Construction

McDowell Roofs Package 3 – Cancelled

  • Posting Number: 2022-Q1(Jan-Mar)-CW-4784
  • Anticipated Posting Date: 2022-02-02
  • Last Updated: 07/02/21
Add to Calendar 2022-02-02 2022-02-02 McDowell Roofs Package 3 – Cancelled

This project consists of replacing various roofs at the McDowell Creek Wastewater Treatment Plant.  This package will potentially include the replacement of four separate roofs.

Archived

Charlotte Storm Water Services / Construction

McAlpine SR2 and SR3 Stream Repairs – CANCELLED

  • Posting Number: 2021-Q1(Jan-Mar)-CSWS-1519
  • Anticipated Posting Date: 2021-03-01
  • Last Updated: 05/28/21
Add to Calendar 2021-03-01 2021-03-01 McAlpine SR2 and SR3 Stream Repairs – CANCELLED

The purpose of the project is to repair approximately 700 linear feet of stream restoration between 2 different tributaries.  Failing structure will be replaced or repaired such that they function as originally intended.  Repairs will be performed with minimal disturbance to buffer vegetation and vegetation of appropriate size will be re-established after repairs are completed.  Repairs will include but not limited to, removing and resetting boulders and logs for in-stream structures and adding or repairing constructed riffles.

This will not be bid

 

Archived

Charlotte Area Transit System / Commodities & Goods

AUTOMATED VERTICAL SHUTTLE STORAGE UNIT

  • Posting Number: 2021-Q1(Jan-Mar)-CATS-4658
  • Anticipated Posting Date: 2021-03-11
  • Last Updated: 05/27/21
Add to Calendar 2021-03-11 2021-03-11 AUTOMATED VERTICAL SHUTTLE STORAGE UNIT

Charlotte Area Transit System’s Rail Division is requesting bids for a new automated vertical storage unit for the South Blvd Light Rail Facility. This will include the replacement and removal the existing unit, which is approximately 25 years old. This bid submission shall include design, delivery and installation.

The scope of this Invitation to Bid (ITB) is to establish a contract for the purchase, delivery, and other inherently related activities of the automated vertical shuttle storage unit and in compliance with the specifications and terms and conditions set forth in this ITB.

 