/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Charlotte Water / Construction

Sugar Creek WWTP East Equalization Basin Joint Repair

  • Posting Number: 2025-Q4(Oct-Dec)-CW-17993
  • Anticipated Posting Date: 2025-11-25
  • Last Updated: 10/02/25
Add to Calendar 2025-11-25 2025-11-25 Sugar Creek WWTP East Equalization Basin Joint Repair

This contract will be for the rehabilitation of the east equalization basin. Construction will require the removal and replacement of deteriorating joint materials. This project will also include high pressure crack injection repairs.

In Development

Charlotte Water / Construction

Belmont Lift Station and Force Main

  • Posting Number: 2025-Q4(Oct-Dec)-CW-12289
  • Anticipated Posting Date: 2025-11-25
  • Last Updated: 10/02/25
Add to Calendar 2025-11-25 2025-11-25 Belmont Lift Station and Force Main

This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s Stowe Regional Wastewater Reclamation Facility via Charlotte Water’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.

In Development

Charlotte Water / Construction

McDowell Knife Gate Valve

  • Posting Number: 2025-Q4(Oct-Dec)-CW-17936
  • Anticipated Posting Date: 2025-11-15
  • Last Updated: 10/02/25
Add to Calendar 2025-11-15 2025-11-15 McDowell Knife Gate Valve

This contract includes the replacement of IPS knife gate valves at McDowell. The work will ensure continued reliability and functionality of the infrastructure. This involves installing functioning valves for operational control within the system.

In Development

Charlotte Water / Construction

McDowell Creek Wastewater Treatment Plant Primary Clarifier and Influe ... McDowell Creek Wastewater Treatment Plant Primary Clarifier and Influent Pumping Station Rehab

  • Posting Number: 2025-Q4(Oct-Dec)-CW-18587
  • Anticipated Posting Date: 2025-12-12
  • Last Updated: 10/02/25
Add to Calendar 2025-12-12 2025-12-12 McDowell Creek Wastewater Treatment Plant Primary Clarifier and Influent Pumping Station Rehab

This project includes the demolition and disposal of the existing Primary Clarifier No. 5 (PC No. 5) mechanism and associated components, followed by the installation of a new Owner-procured clarifier mechanism. Additional work at PC No. 5 includes structural repairs, replacement of exposed piping and valves, modifications to existing chemical feed dosing points, and upgrades to slide and sluice gate components. At the Influent Pump Station (IPS), the project involves replacing existing grit piping and stainless steel air piping. The IPS scope also includes the replacement of slide gate seals, actuators, and stems to ensure continued operational reliability.

 

 

 

 

 

In Development

Charlotte Water / Construction

McAlpine Large Diameter Sewer Rehabilitation – Phase 2

  • Posting Number: 2025-Q4(Oct-Dec)-CW-17898
  • Anticipated Posting Date: 2025-12-12
  • Last Updated: 10/02/25
Add to Calendar 2025-12-12 2025-12-12 McAlpine Large Diameter Sewer Rehabilitation – Phase 2

This project involves the rehabilitation of approximately 7,000 linear feet of reinforced concrete pipe (RCP) sewer outfall. The sewer outfall is located just south of Highway 51, running parallel to McAlpine Creek. The work will improve the structural integrity and performance of the sewer system.

In Development

Charlotte Water / Construction

Unspecified Water and Sewer Repairs

  • Posting Number: 2025-Q4(Oct-Dec)-CW-17896
  • Anticipated Posting Date: 2025-12-05
  • Last Updated: 10/02/25
Add to Calendar 2025-12-05 2025-12-05 Unspecified Water and Sewer Repairs

This contract covers on-call repairs for water and sewer systems throughout Charlotte Water’s collection and distribution areas. Work may include emergency mobilization for critical pipeline repairs and other maintenance activities. The contract ensures rapid response capabilities for unforeseen infrastructure issues.

In Development

Charlotte Water / Construction

Elevated Water Storage Tanks Improvements

  • Posting Number: 2025-Q4(Oct-Dec)-CW-18606
  • Anticipated Posting Date: 2025-12-04
  • Last Updated: 10/02/25
Add to Calendar 2025-12-04 2025-12-04 Elevated Water Storage Tanks Improvements

This project involves the design and construction administration for the rehabilitation of five separate elevated water storage tanks. Each tank will undergo interior and exterior recoating to extend its service life and improve corrosion resistance. The scope also includes the replacement of outdated ladder systems to enhance safety and compliance. Miscellaneous piping repairs will be completed as needed to restore functionality and improve overall system performance. The project is managed to ensure coordination, quality control, and adherence to regulatory standards throughout design and construction.

 

 

 

 

 

In Development

Charlotte Water / Construction

Davidson Eastern Rocky River Sanitary Sewer Outfall

  • Posting Number: 2025-Q4(Oct-Dec)-CW-18604
  • Anticipated Posting Date: 2025-12-01
  • Last Updated: 10/02/25
Add to Calendar 2025-12-01 2025-12-01 Davidson Eastern Rocky River Sanitary Sewer Outfall

This contract will be for the design and construction of a gravity outfall sewer along the Rocky River. This project will consist of approximately 3,600 linear feet of 15-inch and 2,400 linear feet of 12-inch gravity sanitary sewer piping. This outfall is tributary to the existing Rocky River outfall in Cabarrus County and Water and Sewer Authority of Cabarrus County (WSACC) Rocky River Regional Wastewater Treatment Plant.

This opportunity was archived earlier.

In Development

Charlotte Water / Construction

Fiscal Year 2026 Small Diameter Water and Sewer Services Contract

  • Posting Number: 2025-Q4(Oct-Dec)-CW-17900
  • Anticipated Posting Date: 2025-12-01
  • Last Updated: 10/02/25
Add to Calendar 2025-12-01 2025-12-01 Fiscal Year 2026 Small Diameter Water and Sewer Services Contract

This contract will provide installation services for small-diameter water and sewer service connections within the Charlotte Water service area. It will replace the existing FY24 Small Service Contract #1. The work will help meet growing service demands and maintain system reliability.

1 2 3 4 46 47