Earlybird, Business Opportunity Pipeline, City of Charlotte

/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Archived

Department of General Services / Construction

Firehouse # 46 Infill Station at Miranda Road

  • Posting Number: 2025-Q2(Apr-Jun)-DGS-17275
  • Anticipated Posting Date: 2025-04-01
  • Last Updated: 02/24/26
Add to Calendar 2025-04-01 2025-04-01 Firehouse # 46 Infill Station at Miranda Road

A new infill firehouse will be designed and constructed at 4032 Miranda Road to alleviate high call volumes and meet response time standards in the area. The firehouse will reflect the design of Firehouse #45, a 3-bay, 2-story firehouse programmed for approximately 14,600 square feet. The proposed facility will be located at the corner of Beatties Ford Road. Parcel #03741123 is approximately 6.54 acres. This location and site selection meets the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.

Wharton-Smith has been awarded CMAR services and is working on prequalifying subcontractors for the project.

In Development

Charlotte Storm Water Services / Construction

Faulconbridge Rd 5749 Storm Drainage Improvement Project

  • Posting Number: 2026-Q2(Apr-Jun)-CSWS-17296
  • Anticipated Posting Date: 2026-04-20
  • Last Updated: 02/24/26
Add to Calendar 2026-04-20 2026-04-20 Faulconbridge Rd 5749 Storm Drainage Improvement Project

Project consists of lining 556 LF of 42 inch CMP and 131 LF of 15 inch RCP with CIPP.  Eight existing drainage structures will be removed and replaced and two additional structures will be added. 221 LF of 15″ RCP will be removed and replaced. Chemical grouting joint repair will also be installed at approx. 15 locations throughout the 42″ CMP.

In Development

Department of General Services / Construction

CMGC – ADA Ph 2 – CMaR – Contractor Pre-Qualificatio ... CMGC – ADA Ph 2 – CMaR – Contractor Pre-Qualification

  • Posting Number: 2026-Q2(Apr-Jun)-DGS-18921
  • Anticipated Posting Date: 2026-04-01
  • Last Updated: 02/24/26
Add to Calendar 2026-04-01 2026-04-01 CMGC – ADA Ph 2 – CMaR – Contractor Pre-Qualification

Char-Meck Gov’t Center is identified in the City-wide ADA Transition Plan for Program Implementation. Project scope includes removing physical barriers identified in the ADA Transition Plan in conformance with code as applicable. Project Delivery for Phase 2 is Construction Manager at Risk (CMaR).  Vendors will be encouraged to look for contractor pre-qualification notices from our CMaR, JE Dunn Construction Company in 2026.  Scope includes Plaza Deck, 1st Floor Lobby, Mezz Level, Highrise and the adjacent parking deck.

In Development

Charlotte Storm Water Services / Construction

Queens Storm Drainage Improvement Project

  • Posting Number: 2026-Q2(Apr-Jun)-CSWS-17294
  • Anticipated Posting Date: 2027-11-15
  • Last Updated: 02/24/26
Add to Calendar 2027-11-15 2027-11-15 Queens Storm Drainage Improvement Project

The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Queens Storm Drainage Improvement Project (SDIP) area.

The Queens Storm Drainage Improvement Project is bordered by East 4th Street to the north, Baxter Street to the south, Caswell Road to the east and Baldwin Avenue to the west.  This project area is within a drainage area of approximately 40 acres and the improvements will include pipe system upgrades and channel improvements.

Archived

Department of General Services / Construction

Miranda Road Firehouse 46

  • Posting Number: 2025-Q2(Apr-Jun)-DGS-14397
  • Anticipated Posting Date: 2025-04-01
  • Last Updated: 02/24/26
Add to Calendar 2025-04-01 2025-04-01 Miranda Road Firehouse 46

A new infill firehouse will be designed and constructed at 4032 Miranda Road to alleviate high call volumes and meet response time standards in the area. The firehouse will reflect the design of Firehouse #45, a 3-bay, 2-story firehouse programmed for approximately 14,600 square feet. The proposed facility will be located at the corner of Beatties Ford Road. Parcel #03741123 is approximately 6.54 acres. This location and site selection meets the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.

Archived

Department of General Services / Construction

Central Kilborne Norland Intersection & Street Upgrade

  • Posting Number: 2025-Q2(Apr-Jun)-DGS-8945
  • Anticipated Posting Date: 2025-06-27
  • Last Updated: 02/24/26
Add to Calendar 2025-06-27 2025-06-27 Central Kilborne Norland Intersection & Street Upgrade

Project limits are from just south of Evergreen Cemetery Dr to about 400’ south of Central Ave at Kilborne Dr on Norland Rd (0.43 miles). The project includes a shared-use path on one side of the street, storm drainage, water line work, and 2 Rectangular Rapid Flashing Beacons (RRFBs).

Archived

Department of General Services / Architectural / Engineering Services

Professional Engineering Services for Transportation Projects – ... Professional Engineering Services for Transportation Projects – Complete – Please Archive

  • Posting Number: 2025-Q2(Apr-Jun)-DGS-17365
  • Anticipated Posting Date: 2025-06-01
  • Last Updated: 02/24/26
Add to Calendar 2025-06-01 2025-06-01 Professional Engineering Services for Transportation Projects – Complete – Please Archive

The Engineering Services Division of the Department of General Services (GS) is soliciting Statements of Qualifications (SOQ) from qualified engineering companies (Company) to provide the following three main components for this solicitation and interested parties may choose to be considered for any or all:

• Embedded Consultant Project Management staff: Primary responsibilities include reviewing project deliverables and the overall project management duties as normally performed by city Project Managers. The consultant must certify designs as a North Carolina Professional Engineer or defer this to the project engineer. QA/QC staff should have experience in designing and preparing construction plans for transportation projects and will oversee the work of Project Engineers and/or consultant designers on assigned projects and be directly responsible for ensuring projects are delivered on-schedule and within the allocated budget.
• Embedded Project Engineer staff: Primarily responsible for completing designs for an average of 4-10 projects per year, depending on size and scope. They will be the engineer of record for designs of varying sizes and will report directly to city or consultant Project Management Staff.
• Miscellaneous Planning and Design Services: The City of Charlotte is seeking assistance from qualified Transportation Consulting firms to provide transportation planning and transportation engineering on “on-call” basis. The on-call contract will provide a flexible and effective way for the city to respond to recurring consultant service needs covering a range of multi-dimensional transportation engineering and planning tasks. The flexible on-call consultant service contracts with qualified transportation firms will help meet the needs of the city. Each firm selected for an on-call contract will be required to enter into a master agreement with the city. This master agreement will fulfill the consultant solicitation and selection process for the work to be performed under the on-call contract.

Archived

Department of General Services / Construction

Prosperity Church Road (Old Ridge to Benfield) Improvements

  • Posting Number: 2024-Q2(Apr-Jun)-DGS-9862
  • Anticipated Posting Date: 2024-06-17
  • Last Updated: 02/24/26
Add to Calendar 2024-06-17 2024-06-17 Prosperity Church Road (Old Ridge to Benfield) Improvements

The project proposes to widen Prosperity Church Rd approximately 0.3 mi between Old Ridge Rd and Benfield Rd to provide curb and gutter, sidewalk, storm drainage, bicycle lanes, and on-street parking, as well as a roundabout at Prosperity Church Rd and Prosperity Ridge Rd.

Archived

Department of General Services / Construction

Harrisburg Road Shared Use Path (SUP) – Robinson Church Rd to Ti ... Harrisburg Road Shared Use Path (SUP) – Robinson Church Rd to Timbertop Ln

  • Posting Number: 2026-Q2(Apr-Jun)-DGS-19027
  • Anticipated Posting Date: 2026-04-01
  • Last Updated: 02/24/26
Add to Calendar 2026-04-01 2026-04-01 Harrisburg Road Shared Use Path (SUP) – Robinson Church Rd to Timbertop Ln

Improvements on Harrisburg Rd starting near Robinson Church Road and extending to Timbertop Lane to create a more pedestrian-oriented corridor. Improvements will primarily include shared use path, drainage, curb and gutter, and milling and overlay of asphalt.

1 2 3 4 47 48