Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Archived

Aviation / Architectural / Engineering Services

West Ramp Dual Taxi Lanes (Design)

  • Posting Number: 2023-Q1(Jan-Mar)-AVI-10009
  • Anticipated Posting Date: 2023-01-25
  • Last Updated: 02/22/23
Add to Calendar 2023-01-25 2023-01-25 West Ramp Dual Taxi Lanes (Design)

The West Ramp Dual Taxi lanes project at Charlotte Douglas International Airport will provide for the design and construction of dual taxi lanes on the west ramp between taxiways E14 and E15 and includes the realignment of gates on old Concourse A to accommodate future fleet mixes.  The following scope is based on planning level analysis and will need to be confirmed through the design.  The current taxi lane configuration lacks sufficient bidirectional flow and consists of a single parallel Group V taxi lane supporting each runway and a single Group III taxi lane around the perimeter of the existing terminal apron

Archived

Aviation / Architectural / Engineering Services

Baggage Handling System Masterplan

  • Posting Number: 2023-Q1(Jan-Mar)-AVI-10300
  • Anticipated Posting Date: 2023-02-21
  • Last Updated: 02/22/23
Add to Calendar 2023-02-21 2023-02-21 Baggage Handling System Masterplan

Perform a masterplan analysis of the baggage handling system at Charlotte Douglas International Airport.  This includes review of the existing baggage handling system, establishment of a forecast analysis and growth requirements, development of a masterplan with implementation strategies, and preparation of budget estimates.

Archived

Aviation / General Services

CLT – On Call Demolition Services

  • Posting Number: 2023-Q1(Jan-Mar)-AVI-10682
  • Anticipated Posting Date: 2023-02-16
  • Last Updated: 02/22/23
Add to Calendar 2023-02-16 2023-02-16 CLT – On Call Demolition Services

The scope of this contract shall be to provide demolition and abatement services for removing various commercial and residential structures around the airport.

The term of the Contract shall be for three (3) years with two (2) optional one (1) year renewals.

Archived

Aviation / General Services

CLT – ENVIRONMENTAL CONSULTING SERVICES

  • Posting Number: 2023-Q1(Jan-Mar)-AVI-10680
  • Anticipated Posting Date: 2023-02-16
  • Last Updated: 02/22/23
Add to Calendar 2023-02-16 2023-02-16 CLT – ENVIRONMENTAL CONSULTING SERVICES

The scope of this contract shall be to provide asbestos and lead based paint reports on structures the Airport intends to demolish.

The term of the Contract shall be for three (3) years with two optional one-year renewals.

Archived

Aviation / Commodities & Goods

Terminal Lobby Expansion Petrified Trees

  • Posting Number: 2023-Q1(Jan-Mar)-AVI-10378
  • Anticipated Posting Date: 2023-02-16
  • Last Updated: 02/22/23
Add to Calendar 2023-02-16 2023-02-16 Terminal Lobby Expansion Petrified Trees

Charlotte Douglas International Airport is seeking to purchase four (4) natural tree trunk/multi stem petrified Ficus trees for the interior main terminal lobby.

Archived

Charlotte Area Transit System / General Services

Series 100 and 200 Light Rail Vehicle Midlife Overhaul

  • Posting Number: 2023-Q1(Jan-Mar)-CATS-10588
  • Anticipated Posting Date: 2023-02-11
  • Last Updated: 02/20/23
Add to Calendar 2023-02-11 2023-02-11 Series 100 and 200 Light Rail Vehicle Midlife Overhaul

Mid-life Vehicle Rehabilitation Programs involve taking railcars out of service for the overhaul, remanufacturer, or upgrade of a substantial number of vehicle systems and subsystems at once (usually in year 15 of the vehicle in service). The Rail Transit Agency requires a vendor to restore vehicles to “like new” condition and performance and to implement essential technology upgrades. As an industry practice, it recommended best practice, which is to be completed by solicitation by an offsite vendor.

 

PSR  1441

Archived

Charlotte Area Transit System / Commodities & Goods

BLE Spare Inventory Parts

  • Posting Number: 2023-Q1(Jan-Mar)-CATS-10417
  • Anticipated Posting Date: 2023-01-27
  • Last Updated: 02/16/23
Add to Calendar 2023-01-27 2023-01-27 BLE Spare Inventory Parts

Charlotte Area Transit Systems (CATS) is in need of spare inventory parts and equipment to support 27 of CATS LYNX traction power substations for the Light Rail system. The Light Rail System started construction in 2005, and now is up and running with multiple corridors. The procurement of spare inventory parts and equipment necessary for the safe operation of CATS Traction Power network. The parts and equipment need to be compatible, standardized and reliable for the existing traction power infrastructure. A list of over 600 parts will be listed for pricing.

 

PSR 1330

Archived

Aviation / General Services

Arborist Services

  • Posting Number: 2023-Q1(Jan-Mar)-AVI-10344
  • Anticipated Posting Date: 2023-02-09
  • Last Updated: 02/10/23
Add to Calendar 2023-02-09 2023-02-09 Arborist Services

Certified arborist company to perform tree work on airport site.  Work consists of approximately 680 hours per year could be greater or less.  Work occurs throughout the airport campus site and may include active roadways, parking lots, or similar areas.

Archived

Aviation / General Services

CLT Epoxy Flooring – CANCELLED

  • Posting Number: 2023-Q1(Jan-Mar)-AVI-10322
  • Anticipated Posting Date: 2023-01-31
  • Last Updated: 02/09/23
Add to Calendar 2023-01-31 2023-01-31 CLT Epoxy Flooring – CANCELLED

This project includes the installation of an epoxy resinous floor
membrane suitable for mechanical room applications over the existing
stained concrete flooring at the Charlotte Douglas International Airport
Central Energy Plant facility. This is a one-time project with an estimated completion term of less than 6 months.