Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Charlotte Storm Water Services / Construction
Glassy Creek/Brentwood/Parkwood Stream Restoration

Charlotte Area Transit System / General Services
BOD Fluid analysis
BOD is requesting a contract for a vendor to conduct fluid analysis for the bus and paratransit fleet. Requesting a five (5) year contract. 3+1+1 estimating $50,000 annually
PSR # 1547

Aviation / General Services
Snow Removal of Aviation Parking Lots, Bus Shelters, and Bus Lanes
Provide snow removal in the bus lanes located in Long Term 1 and 2 parking lots, Daily North parking lot, and employee 1 and 4 parking lots. The contractor will use a skid steer type piece of equipment with a snow-plow blade. The bus lanes will be plowed keeping them free from of snow and ice,

City Wide / Technology Goods & Services
Re-Solicitation On Call ADA Assessment and Remediation Services for Di ... Re-Solicitation On Call ADA Assessment and Remediation Services for Digital Assets
The scope of this contract shall be to provide ADA Assessment and Remediation Services on Digital Assets for the City of Charlotte.
The City of Charlotte is interested in partnering with qualified companies capable of digital asset assessment and remediation (e.g., websites, web apps, mobile apps, kiosks, public information display systems, etc.) for the purpose of citizen and employee accessibility, and accessibility by anyone with a disability pursuant to the American Disabilities Act (ADA) (42 U.S.C. Ch. 126 – 12-101 et seq).

Charlotte Storm Water Services / Construction
Westbourne Storm Drainage Improvement Project
The project area covers approximately 20 acres and is roughly bounded by Old Plank Road to the north, Larkhaven Road to the east, Westbourne Drive to the west, and Bellhaven Boulevard to the south. The project includes storm drain improvement including culvert replacements, repair of aging and deteriorating storm drains by way of pipe system upgrades, and channel stabilization improvements. The project also includes water line upgrades and sanitary sewer relocations along with road resurfacing and seeding in affected project areas.

Aviation / General Services
Terrazzo Maintenance Re-Solicitation
The scope of this contract shall be to provide Terrazzo Maintenance Services at various locations on the airport’s property. The services include, but are not limited to, labor, supervision, materials, equipment, chemicals, supplies, and incidentals for complete terrazzo maintenance services at the following locations on airport property: CLT Airport Main Terminal, the Old Terminal, and Express Deck 1. All work is to be performed between 9:30 PM – 5:30 AM, 7 days a week.

Charlotte Water / Construction
Water Main Replacement Bid Package-CANCELLED
Construction contract utilized for water main replacement. Replacement focuses on assets that have reached end of useful life that are now causing operational issues. Primarily focuses on assets that are 12 inches and smaller.
Cancelled as of 10/21/24

Charlotte Water / Construction
Water Main Replacement FY24-CANCELLED
Construction contract utilized for water main replacement. Replacement focuses on assets that have reached end of useful life that are now causing operational issues. Primarily focuses on assets that are 12” and smaller.
Cancelled as of 10/21/2024

Charlotte Water / Construction
Sanitary Sewer Rehab-CANCELLED
This will be for a construction contract utilized for sanitary sewer rehab and repairs. Work will be focused on failed or failing sanitary sewer collection system assets. Work performed for this contract will help prevent future sanitary sewer overflows.
Cancelled as of 10/21/2024
This stream restoration construction project provides for the upgrading of lakes and ponds, dam repairs, and other improvements to reduce the level of pollution in stormwater. The need for the project is based on the maintenance of facilities such as lakes and ponds that enhance stormwater quality under the requirements of the Clean Water Act.