/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Archived

Department of General Services / General Services

Old City Town Hall Roof Replacement project

  • Posting Number: 2023-Q2(Apr-Jun)-DGS-11851
  • Anticipated Posting Date: 2023-06-23
  • Last Updated: 08/01/23
Add to Calendar 2023-06-23 2023-06-23 Old City Town Hall Roof Replacement project

Removal and disposal of all existing asphalt built-up roof system, metal flashings, and counter flashings. Existing metal wall panels and balustrades are to remain. Furnish and install new single ply PVC roof system consisting of new flat and tapered polyisocyanurate insulation, gypsum cover board, fully adhered 50 mil PVC membrane and all flashings, wood blocking and metal flashings. Furnish and install new liquid applied drain re-lining at two (2) existing overflow drains and drain leaders. Remove and reinstall all existing surveillance and electrical equipment needed to complete the reroofing work.  All disturbed rooftop equipment is be returned to original functionality after completion of the roofing project. Removal and disposal of all existing asphalt built-up roof system, metal flashings, counter flashings, gutters and downspouts. Furnish and install new single ply PVC roof system consisting of new flat and tapered polyisocyanurate insulation, gypsum cover board, fully adhered 60 mil PVC membrane and all flashings, wood blocking, metal flashings, gutters and downspouts. Remove existing metal roof panels in a manner that will allow for re- installation without damage. Install new high-temperature underlayment and re-install existing metal roof panels. Incorporate metal roof panels into above and below single ply roofing systems.

Archived

Charlotte Area Transit System / Construction

South End Station CMAR RFP

  • Posting Number: 2023-Q2(Apr-Jun)-CATS-10702
  • Anticipated Posting Date: 2023-06-14
  • Last Updated: 07/25/23
Add to Calendar 2023-06-14 2023-06-14 South End Station CMAR RFP
South End Station Project will design and construct a new light rail station with offset side platforms adjacent to the Publix Supermarket and 2161 Hawkins development in South End. The project team completed a project delivery assessment and selected Construction Manager at Risk (CMAR) as the appropriate method to deliver this project. 

PSR# 1483

 

Archived

Department of General Services / Commodities & Goods

Tracked Crawler Articulated Aerial Boom Lift (Spider Lift)

  • Posting Number: 2023-Q2(Apr-Jun)-DGS-11874
  • Anticipated Posting Date: 2023-06-15
  • Last Updated: 07/20/23
Add to Calendar 2023-06-15 2023-06-15 Tracked Crawler Articulated Aerial Boom Lift (Spider Lift)

Landscape Management’s landscape operations group maintains more than 1,500 acres of landscaping across more than 200 city properties, including operational, administrative, and community facilities; vacant parcels; nearly 1,000 medians; and six public spaces (Arequipa Park, Crescent Park, Five Points Public Plaza, The Green at Prosperity Village, The Ritz at Washington Heights and Thomas Polk Park). The group also installs new landscaping and controls excessive vegetation growth.

The Landscape Management Division seeks to establish a contract for a one-time purchase of a Tracked Crawler Articulated Aerial Boom Lift (Spider Lift) from a qualified vendor. The contract will be for the purchase, delivery, and labor-related maintenance in compliance with the specifications and terms and conditions outlined in the Invitation To Bid.

Archived

Finance / Technology Goods & Services

Revenue Cashiering and Merchant Services

  • Posting Number: 2023-Q2(Apr-Jun)-FN-11341
  • Anticipated Posting Date: 2023-06-23
  • Last Updated: 07/17/23
Add to Calendar 2023-06-23 2023-06-23 Revenue Cashiering and Merchant Services

The City is interested in procuring a computer application for cashiering and revenue collection. The City is currently undergoing a transformation to Workday ERP for Human Resources, Financials and Budget. It is preferred that the Cashiering System solution have existing integration connectors to Workday Financials and Banner Utility billing which is used by Charlotte Water.

Archived

Department of General Services / Construction

Beatties Ford Sidewalk Phase 1

  • Posting Number: 2023-Q2(Apr-Jun)-DGS-11913
  • Anticipated Posting Date: 2023-06-30
  • Last Updated: 07/14/23
Add to Calendar 2023-06-30 2023-06-30 Beatties Ford Sidewalk Phase 1

This project will improve the curbs, driveway, sidewalks and ramps for Beatties Ford Road between Russell Avenue and Lasalle Street. Concrete shall be 6-inch Portland cement, asphalt shall be two-inch course and four-inch intermediate course. Gravel shall be six-inch incidental stone. Limits of proposed slopes are indicated in the plans. The contractor shall maintain erosion control devices in accordance with the appropriate city and state erosion and sediment control ordinances. Contractor shall sawcut existing asphalt and/or concrete surfaces prior to removal unless otherwise directed by the engineer. Project length is 0.281 miles.

Archived

Charlotte Storm Water Services / Construction

Storm Water Repair and Improvement FY2024-A

  • Posting Number: 2023-Q2(Apr-Jun)-CSWS-12011
  • Anticipated Posting Date: 2023-06-27
  • Last Updated: 07/14/23
Add to Calendar 2023-06-27 2023-06-27 Storm Water Repair and Improvement FY2024-A

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.

Archived

Charlotte Water / General Services

CENTRIFUGE PREVENTIVE MAINTENANCE AND REPAIR SERVICES-Mallard Creek WR ... CENTRIFUGE PREVENTIVE MAINTENANCE AND REPAIR SERVICES-Mallard Creek WRF

  • Posting Number: 2023-Q2(Apr-Jun)-CW-11335
  • Anticipated Posting Date: 2023-06-26
  • Last Updated: 07/06/23
Add to Calendar 2023-06-26 2023-06-26 CENTRIFUGE PREVENTIVE MAINTENANCE AND REPAIR SERVICES-Mallard Creek WRF

Company to provide the city centrifuge preventive maintenance, predictive maintenance, and repair services for 2 (two) dewatering centrifuges and 2 (two) Thickening Centrifuges at the Mallard Creek WRF , Westfalia and Humboldt Dewatering Centirfuge and Humboldt Thickening Centrifuge. In addition to Preventive Maintenance, the selected Company will need to provide predictive maintenance service.

Archived

Charlotte Department of Transportation / Commodities & Goods

Traffic Signal Components, Cabinets and Risers

  • Posting Number: 2023-Q2(Apr-Jun)-CDT-11401
  • Anticipated Posting Date: 2023-06-27
  • Last Updated: 06/30/23
Add to Calendar 2023-06-27 2023-06-27 Traffic Signal Components, Cabinets and Risers

The Charlotte Department of Transportation (CDOT) is seeking one or more  companies to provide various traffic signal components including pedestrian signal parts, traffic signal controllers, cabinets and cabinet risers and blank out signs.

Archived

Charlotte Area Transit System / General Services

Customer Experience/Internal Culture/Leadership Training Work

  • Posting Number: 2023-Q2(Apr-Jun)-CATS-10619
  • Anticipated Posting Date: 2023-05-05
  • Last Updated: 06/23/23
Add to Calendar 2023-05-05 2023-05-05 Customer Experience/Internal Culture/Leadership Training Work

This project is part of the assessment the city manager had completed previously. The assessment findings gave objectives to CATS as a part of the next steps. The scope of work below outlines the steps we will take to meet some of these objectives.

Scope of work:
CATS is looking to do internal and external work with employees and riders. Below are detailed areas of focus we are looking to address.

Customer Experience:
A customer experience action statement to be created by staff in focus groups
Pillars of our customer experience- “The How.”
Never and always non-negotiable standards
Launch support of the program
Training program for onboarding new staff and contractors
Video script- day in the life of riders (3)
Project launch across the department
Public relations support for launch- press release, social media, etc.
Six months of project support

Internal Culture
Focus groups across the department to set a baseline and create the program
Roadmap to breaking down silos across the department
Interdepartmental teamwork with a focus on compassion and empathy
Roadmap to handoffs between departments
Understanding how your work impacts other
Understand the internal customer
Improvement of communications
Training program for onboarding new staff and contractors
Video script- day in the life of colleagues (3)
Project launch across the department
Six months of project support

Leadership/Train the Leader
Create the employee experience manual with leadership
Roadmap to increase morale and lower turnover
Leadership training program for leadership
Project launch with leadership

PSR # 1486

1 2 19 20 21 42 43