Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
Charlotte Area Transit System / General Services
Install network cable on bus for fare collection validation
Aviation / Construction
Remote Transmitter Receiver (RTR) SITE C SELF SUPPORTING TOWERS
Procurement of and Federal Aviation Administration Remote Transmitter Receiver (RTR) towers with the following attachments or appurtenances: a platform at the top of the tower, antenna mount arms, a climbing ladder, safety climb system, coax/waveguide ladder, obstruction light, lightning protection and grounding kit and foundation embedment.
All materials to be delivered to Charlotte Douglas International Airport.
City Wide / General Services
Emergency Snow and Ice Removal Services
This project includes snow removal and/or barricading services by either plowing, sweeping, shoveling, or any combination as may be required to provide safe, clear, and unobstructed foot and vehicle travel at city maintained facilities including, but not limited, to parking lots, parking decks, driveways, sidewalks, stairways, and, in some instances, building entrances.
The selected Company will provide snow removal services on an on-call, as-needed basis. Work will be performed in response to requests made by the City’s Project Manager. All services will require advance authorization. The selected company will provide all personnel, equipment, tools, supplies, supervision, and any other items necessary to perform snow removal services. Rental equipment and subcontracting of portions of the work without specific prior authorization will not be accepted.
Aviation / Construction
Precast Utility Shelter (Informal Construction)
Procurement of a 12’ x 36’ precast concrete utility shelter to house electrical and communications equipment supporting the FAA’s RTR radar site. The shelter will be fabricated off-site with minimal field fabrication requirements and will be constructed in accordance with all local and state building codes.
All materials to be delivered to Charlotte Douglas International Airport.
Aviation / Architectural / Engineering Services
West Ramp Dual Taxi Lanes (Design)
The West Ramp Dual Taxi lanes project at Charlotte Douglas International Airport will provide for the design and construction of dual taxi lanes on the west ramp between taxiways E14 and E15 and includes the realignment of gates on old Concourse A to accommodate future fleet mixes. The following scope is based on planning level analysis and will need to be confirmed through the design. The current taxi lane configuration lacks sufficient bidirectional flow and consists of a single parallel Group V taxi lane supporting each runway and a single Group III taxi lane around the perimeter of the existing terminal apron
Aviation / Architectural / Engineering Services
Baggage Handling System Masterplan
Perform a masterplan analysis of the baggage handling system at Charlotte Douglas International Airport. This includes review of the existing baggage handling system, establishment of a forecast analysis and growth requirements, development of a masterplan with implementation strategies, and preparation of budget estimates.
Aviation / General Services
CLT – On Call Demolition Services
The scope of this contract shall be to provide demolition and abatement services for removing various commercial and residential structures around the airport.
The term of the Contract shall be for three (3) years with two (2) optional one (1) year renewals.
Aviation / General Services
CLT – ENVIRONMENTAL CONSULTING SERVICES
The scope of this contract shall be to provide asbestos and lead based paint reports on structures the Airport intends to demolish.
The term of the Contract shall be for three (3) years with two optional one-year renewals.
Aviation / Commodities & Goods
Terminal Lobby Expansion Petrified Trees
Charlotte Douglas International Airport is seeking to purchase four (4) natural tree trunk/multi stem petrified Ficus trees for the interior main terminal lobby.
Telware will install a network cable from the MG90 modem to the farebox to support the mobile app validation.
PSR #1453