Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
Aviation / Construction
Runway 18L/36R and Taxiway Delta Rehab Construction
Charlotte Storm Water Services / Construction
Village Lake Dr 2210
Project started due to surface depressions along roadway. City plans to remove and replace corrugated metal pipe with 83 linear feet (LF) of 8’ x 4’ reinforced concrete box culvert; remove and replace two headwalls; remove and replace 311 LF of 15″ reinforced concrete pipe (RCP); remove and replace 42 LF 24″ RCP; remove and replace 27 LF 18″ RCP; bank grading; and remove and replace 85 LF 10” ductile iron pipe of sewer.
Department of General Services / Construction
Kuykendall Road Improvements
This project will connect sidewalk along Kuykendall Road from
Thorn Blade Drive to McKee Road, and add a right-turn lane from
Kuykendall Road on to McKee Road in order to to increase
pedestrian safety and help alleviate traffic congestion at the
intersection. Project will also fill in small sidewalk gap on the south
side of McKee Rd at Kuykendall Rd and add pedestrian signals with
crosswalk at this intersection. Project length = approximately 0.75
miles.
Charlotte Storm Water Services / Construction
The McDaniel Ln 6028 Project
The McDaniel Ln 6028 project consists of removing and replacing an existing storm drainage network in the Charlotte Hills Mobile Home Park. It currently has a preliminary estimate of 1.2million dollars.
Department of General Services / Construction
Lawyers Rd SW (Harri Ann to Chestnut)
The scope of this project will include 0.34 miles of new 6ft wide concrete sidewalk, driveway improvements, and wheelchair ramps on Lawyers Rd from Chestnut Lake Dr to Harri Ann Dr.
City Wide, Department of General Services / General Services
General Vehicle Collision Repair Services
The City requires qualified service providers to work in conjunction with the City’s Fleet Management staff to perform complete turnkey collision repairs and related services on city fleet and Mecklenburg County vehicles. Collision repairs may include but are not limited to paint and body work, frame, cooling systems, engine components, transmission, steering, and related part repairs or replacement.
Department of General Services / Construction
7th Street Parallel Bike Routes
This project will build bike facilities in several different locations throughout the Elizabeth neighborhood to create safer conditions and improve ease of travel for cyclists and pedestrians, including approximately 2.1 miles of sharrows, modernization of two existing rectangular rapid flashing beacons, replacement of 10 wheelchair ramps, a new pedestrian crossing at Pecan Avenue and Shenandoah Avenue, implementation of new bike detection cameras, a new full traffic signal at Bascom Street and 7th Street, and a curb extension located at the intersection of Pecan Avenue and 8th Street.
Charlotte Department of Transportation / Technology Goods & Services
Micromobility Technology Platform
Micromobility technology solutions to assist in analyzing and managing shared mobility devices within Charlotte’s right-of-way.
Charlotte Department of Transportation / Technology Goods & Services
Curb Management Infrastructure
Technology solutions to assist the Charlotte team in creating a digital inventory of the Uptown Charlotte curbs and deploying intelligent sensor-based infrastructure to assess curb usage and demands.
Charlotte Douglas International Airport (“CLT”) intends to issue an Invitation to Bid (“ITB”) for the rehabilitation construction of Runway 18L/36R and Taxiway D. The scope of this work will include but is not limited to asphalt milling, paving, airfield electrical work, and pavement makings.