Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
Charlotte Water / Construction
Belmont Lift Station and Force Main
Aviation / Commodities & Goods
Locks and Accessories
CLT is seeking bids to provide locks, hardware, and accessories.
Charlotte Water / Construction
McAlpine Wastewater Management Facility – Preliminary and Primar ... McAlpine Wastewater Management Facility – Preliminary and Primary Treatment Facilities Rehabilitation
The project includes mechanical, electrical, instrumentation, and structural rehabilitation of preliminary and primary treatment facilities at the McAlpine Creek WWMF. The facilities generally include Screenings Removal, Primary Clarifiers, Gravity Thickeners, Flow Equalization Storage, Flow Equalization Pumping, and Chemical Storage. These improvements will enhance operational reliability and efficiency.
Charlotte Water / Construction
McAlpine Wastewater Management Facility – Biosolids Treatment Fa ... McAlpine Wastewater Management Facility – Biosolids Treatment Facilities Reliability – Construction Package 1
Construction Package 1 includes mechanical, electrical, instrumentation, and structural rehabilitation of Digested Sludge Storage Tanks 1 and 2 and their Control Building. The project aims to improve the reliability and performance of biosolids treatment processes. These upgrades will ensure continued compliance with regulatory requirements and operational efficiency.
Charlotte Water / General Services
Sugar Creek Storage Tanks Cleanout
This contract includes cleaning out storage tanks at the Sugar Creek facility. The work will remove accumulated debris and ensure the tanks remain in good working condition. This maintenance is to extend the lifespan of these critical infrastructure assets.
Charlotte Water / Construction
McDowell Knife Gate Valve
This contract includes the replacement of IPS knife gate valves at McDowell. The work will ensure continued reliability and functionality of the infrastructure. This involves installing functioning valves for operational control within the system.
Charlotte Water / General Services
Field Surveying Services (Geographic Information Systems Group and Cap ... Field Surveying Services (Geographic Information Systems Group and Capacity Assurance Program)
This opportunity involves providing survey services to support Charlotte Water’s GIS and Capacity Assurance Programs, including the following tasks:
Review available data and consult with the City to clarify and define the City’s requirements.
Obtain necessary information, conduct investigations, and make reasonable efforts for the Surveyor to become familiar with the philosophy and purpose of each project.
Identify and analyze requirements from governmental authorities with jurisdiction and assist the City in obtaining the required approvals.
Charlotte Storm Water Services / Construction
Crestmont Drive (4724) Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after the review is complete.
Aviation / Construction
CLT Center Storm Drainage Project
This project is located in a parking lot behind the CLT Center located at 5601 Wilkinson Boulevard in Charlotte, NC. The purpose of the project is to install new pipe to contain and drain runoff from the building to an existing storm drainage system at the rear of the parking lot. The work involves installation of reinforced concrete pipe, storm drainage structures, asphalt surface, and re-striping the parking lot within the construction corridor.
This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s Stowe Regional Wastewater Reclamation Facility via Charlotte Water’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.