/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Archived

Charlotte Water / Construction

FY25 Large Service Contract #1 – CANCELLED

  • Posting Number: 2026-Q2(Apr-Jun)-CW-12285
  • Anticipated Posting Date: 2026-04-01
  • Last Updated: 05/07/24
Add to Calendar 2026-04-01 2026-04-01 FY25 Large Service Contract #1 – CANCELLED

This contract is for the continuous installation of large water and sewer services, as needed, for commercial or residential purposes with a diameter of one and a half inches or larger. Customers apply for quotes for service connection and pay the applicable fees to get into the construction queue. This contract will help meet the demand for these kinds of service connections for the next two years.

-inactive due to budget reprioritization

 

Archived

Charlotte Water / Construction

FY25 Small Service Contract #1 – CANCELLED

  • Posting Number: 2026-Q2(Apr-Jun)-CW-12287
  • Anticipated Posting Date: 2026-05-05
  • Last Updated: 05/07/24
Add to Calendar 2026-05-05 2026-05-05 FY25 Small Service Contract #1 – CANCELLED

This contract is for water and sanitary sewer service installations including connection to the existing public main, which extends a small diameter line to the property, and includes a water meter box or sanitary sewer cleanout. Customers pay connection fees for the installation service, which is based on costs incurred by Charlotte Water in these contracts. The work covered by this contract will provide approximately 800 total services.

-inactive due to budget reprioritization

In Development

Department of General Services / Construction

Brown Grier Road Upgrades

  • Posting Number: 2026-Q2(Apr-Jun)-DGS-8941
  • Anticipated Posting Date: 2026-06-14
  • Last Updated: 03/20/24
Add to Calendar 2026-06-14 2026-06-14 Brown Grier Road Upgrades

This project will widen the two-lane road to a four-lane median-divided road with multi-use paths between Steele Creek Road and Whitehall Park Drive, and a multi-use path north along Sandy Porter Road to the subdivision at Williams Glenn Road.

In Development

Department of General Services / Construction

University City Blvd Pedestrian Crossings

  • Posting Number: 2026-Q2(Apr-Jun)-DGS-14167
  • Anticipated Posting Date: 2026-04-23
  • Last Updated: 03/20/24
Add to Calendar 2026-04-23 2026-04-23 University City Blvd Pedestrian Crossings

This Project will install 270 LF of proposed 12′ wide multi-use-path, curb ramps, crosswalks across NC 49, Pedestrian concrete island, milling/resurfacing, storm drainage and pedestrian hybrid beacon with mast arms near the intersection of University Blvd and Mark Twain Road. This project will also install pedestrian crossings, wheelchair ramps, traffic signals milling/resurfacing and storm drainage system at the intersection of University City Blvd and Suther Rd.91347

In Development

Charlotte Department of Transportation / Construction

Traffic Signal Installation and Maintenance

  • Posting Number: 2024-Q2(Apr-Jun)-CDT-13594
  • Anticipated Posting Date: 2024-05-31
  • Last Updated: 03/01/24
Add to Calendar 2024-05-31 2024-05-31 Traffic Signal Installation and Maintenance

This traffic signal contract will provide resources to install and maintain traffic signals and support infrastructure citywide.

In Development

Charlotte Storm Water Services / Construction

Shamrock Drive Storm Drainage Improvement Project

  • Posting Number: 2024-Q2(Apr-Jun)-CSWS-3459
  • Anticipated Posting Date: 2024-06-15
  • Last Updated: 01/28/24
Add to Calendar 2024-06-15 2024-06-15 Shamrock Drive Storm Drainage Improvement Project

This construction project is located near The Plaza and Shamrock Drive and has been identified to address flooding, erosion, and pipe failure in the project area.

In Development

Charlotte Storm Water Services / Construction

Newell Stream Restoration Project

  • Posting Number: 2024-Q2(Apr-Jun)-CSWS-12167
  • Anticipated Posting Date: 2024-06-25
  • Last Updated: 12/12/23
Add to Calendar 2024-06-25 2024-06-25 Newell Stream Restoration Project

The Newell Stream Restoration Project is located near WT Harris Boulevard (NC 24) and Old Concord Road along a network of tributaries to Toby Creek. Project improvements include restoring approximately 2,500 LF of degraded stream channel, floodplain, and riparian buffer.

In Development

Charlotte Storm Water Services / Construction

Collective V (Multiple Isolated Storm Drainage Improvements Projects)

  • Posting Number: 2024-Q2(Apr-Jun)-CSWS-9970
  • Anticipated Posting Date: 2024-04-15
  • Last Updated: 11/15/23
Add to Calendar 2024-04-15 2024-04-15 Collective V (Multiple Isolated Storm Drainage Improvements Projects)

This project consists of multiple isolated storm drainage improvements projects located throughout the City of Charlotte. Projects include storm drainage improvements and replacement and repair of existing storm drainage system facilities within the street right-of-way and private, residential properties.

In Development

Charlotte Storm Water Services / Construction

Laurel Avenue Storm Drainage Improvement Project

  • Posting Number: 2025-Q2(Apr-Jun)-CSWS-9836
  • Anticipated Posting Date: 2025-04-16
  • Last Updated: 11/15/23
Add to Calendar 2025-04-16 2025-04-16 Laurel Avenue Storm Drainage Improvement Project

This project is bordered by Laurel Avenue to the north, Dotger Avenue to the south, Randolph Road to the east and Hempstead Place to the west.  The existing drainage system consists of closed pipe systems.  This drainage system is currently undersized and street flooding has been reported on Colville Road and building flooding has been reported on Cranbrook Lane.

1 2