/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Charlotte Storm Water Services / Construction

Crestmont Drive (4724) Storm Drainage Improvement Project

  • Posting Number: 2025-Q2(Apr-Jun)-CSWS-3471
  • Anticipated Posting Date: 2025-06-02
  • Last Updated: 05/14/25
Add to Calendar 2025-06-02 2025-06-02 Crestmont Drive (4724) Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

Archived

Aviation / General Services

Executive Recruitment Services

  • Posting Number: 2025-Q2(Apr-Jun)-AVI-18092
  • Anticipated Posting Date: 2025-05-08
  • Last Updated: 05/09/25
Add to Calendar 2025-05-08 2025-05-08 Executive Recruitment Services

CLT is seeking proposals from qualified executive search firms to provide recruitment services for Director and C-Suite Level positions. The selected firm will be responsible for identifying, evaluating, and presenting highly qualified candidates who align with our organization’s values, culture, and strategic goals.

In Development

City Wide, Department of General Services / General Services

Vehicle and Equipment Graphics and Related Service

  • Posting Number: 2025-Q2(Apr-Jun)-CTW-14707
  • Anticipated Posting Date: 2025-06-01
  • Last Updated: 05/06/25
Add to Calendar 2025-06-01 2025-06-01 Vehicle and Equipment Graphics and Related Service

The City is seeking a qualified provider for Vehicle and Equipment Graphics Manufacturing, Application, Removal, Inventory Management and Related Services

Archived

Charlotte Water / Architectural / Engineering Services

Sanitary Sewer Rehabilitation Engineering Services

  • Posting Number: 2025-Q2(Apr-Jun)-CW-17845
  • Anticipated Posting Date: 2025-04-16
  • Last Updated: 04/30/25
Add to Calendar 2025-04-16 2025-04-16 Sanitary Sewer Rehabilitation Engineering Services

Charlotte Water (CLTWater) has been implementing a successful sewer rehabilitation program for more than 20 years and is currently seeking a consultant (Company) to continue to provide professional services for this on-going program (Project). The work will include the continued program management and development in the areas of planning, evaluating, design, construction management, records management and performance monitoring.

In Development

Department of General Services / Architectural / Engineering Services

Professional Engineering Services for Transportation Projects

  • Posting Number: 2025-Q2(Apr-Jun)-DGS-17365
  • Anticipated Posting Date: 2025-06-01
  • Last Updated: 04/30/25
Add to Calendar 2025-06-01 2025-06-01 Professional Engineering Services for Transportation Projects

The Engineering Services Division of the Department of General Services (GS) is soliciting Statements of Qualifications (SOQ) from qualified engineering companies (Company) to provide the following three main components for this solicitation and interested parties may choose to be considered for any or all:

• Embedded Consultant Project Management staff: Primary responsibilities include reviewing project deliverables and the overall project management duties as normally performed by city Project Managers. The consultant must certify designs as a North Carolina Professional Engineer or defer this to the project engineer. QA/QC staff should have experience in designing and preparing construction plans for transportation projects and will oversee the work of Project Engineers and/or consultant designers on assigned projects and be directly responsible for ensuring projects are delivered on-schedule and within the allocated budget.
• Embedded Project Engineer staff: Primarily responsible for completing designs for an average of 4-10 projects per year, depending on size and scope. They will be the engineer of record for designs of varying sizes and will report directly to city or consultant Project Management Staff.
• Miscellaneous Planning and Design Services: The City of Charlotte is seeking assistance from qualified Transportation Consulting firms to provide transportation planning and transportation engineering on “on-call” basis. The on-call contract will provide a flexible and effective way for the city to respond to recurring consultant service needs covering a range of multi-dimensional transportation engineering and planning tasks. The flexible on-call consultant service contracts with qualified transportation firms will help meet the needs of the city. Each firm selected for an on-call contract will be required to enter into a master agreement with the city. This master agreement will fulfill the consultant solicitation and selection process for the work to be performed under the on-call contract.

Archived

Aviation / Construction

4th Parallel Runway Bid Package 3: Taxiway H, Taxiway K, and Runway 1C ... 4th Parallel Runway Bid Package 3: Taxiway H, Taxiway K, and Runway 1C-19C Associated NAVAIDs

  • Posting Number: 2025-Q2(Apr-Jun)-AVI-17262
  • Anticipated Posting Date: 2025-04-29
  • Last Updated: 04/29/25
Add to Calendar 2025-04-29 2025-04-29 4th Parallel Runway Bid Package 3: Taxiway H, Taxiway K, and Runway 1C-19C Associated NAVAIDs

This project is part of the 4th Parallel Runway Program and includes the construction of parallel Taxiway H, connector Taxiway K, Charlotte Douglas International Airport’s (CLT) Fourth Remote Transmitter/Receivers (RTR) Facility, and the Runway 1C-19C Navigational Aids (NAVAIDs), including Instrument Landing System (ILS), Precision Approach Path Indicators (PAPI), and approach lighting systems supporting both runway ends. The scope of work involves, but is not limited to pavement demolition, compacted concrete pavement (CCP), asphalt shoulder paving, asphalt access road installation, ARFF Road asphalt pavement rehabilitation, maintenance of traffic, grading, drainage, erosion and sediment control, pavement markings, airfield electrical installation, NAVAIDs infrastructure, glide slope installation, localizer installation, medium intensity approach light system with runway alignment indicator lights (MALSR), and the installation of the fourth RTR shelter, including all associated utilities and sitework.

The Scope of Work includes critical FAA NAVAIDs work that is complex and time sensitive. Therefore, Bidders should review Article IV.B. §80-05 of the proposed Contract. It is the responsibility of the Bidder to ensure that it has adequate capacity available (including but not limited to such factors as licensing, experience, training, and specific expertise), whether by subcontractor or its own forces, to perform the necessary electrical work in a timely fashion.

In Development

Aviation / Technology Goods & Services

CLT Technology Public Wi-Fi

  • Posting Number: 2025-Q2(Apr-Jun)-AVI-14787
  • Anticipated Posting Date: 2025-05-12
  • Last Updated: 04/28/25
Add to Calendar 2025-05-12 2025-05-12 CLT Technology Public Wi-Fi

This Contract is to provide a Public WiFi solution addressing the full spectrum of CLT’s technology systems. The Work will include, without limitation, program/project management, organizational change management, and implementation services covering the complete lifecycle of technology systems from inception, starting with planning, through design, procurement, configuration, integration, install, test, operational-readiness-activation-training (ORAT), and operation & maintenance (O&M), and replacement. This Public Wifi effort will cover all areas where existing coverage is present and to include any newly constructed areas.

Archived

Aviation / General Services

Overhead Sign Damage Repair

  • Posting Number: 2025-Q2(Apr-Jun)-AVI-18165
  • Anticipated Posting Date: 2025-04-28
  • Last Updated: 04/28/25
Add to Calendar 2025-04-28 2025-04-28 Overhead Sign Damage Repair

Provide damage repairs to overhead directional signage over the main entrance road to the CLT terminal.  Overnight hours Sunday through Wednesday from 2300 – 0500.  Coordination of lane closures and safety operations are paramount.

In Development

Charlotte Area Transit System / General Services

Professional Consulting Services for the Charlotte Area Transit System ... Professional Consulting Services for the Charlotte Area Transit System

  • Posting Number: 2025-Q2(Apr-Jun)-CATS-18142
  • Anticipated Posting Date: 2025-06-07
  • Last Updated: 04/14/25
Add to Calendar 2025-06-07 2025-06-07 Professional Consulting Services for the Charlotte Area Transit System

The Charlotte Area Transit System (CATS) anticipates contracting out professional services for consulting across multiple disciplines that focus on the following:

1.) organizational strategy,

2.) professional training and development,

3.) human resources, and

4.) workforce development

These services will complement existing resources within CATS and the City of Charlotte.  The consultants will play a key role in supporting CATS strategic initiatives to enhance workforce development, improve operational efficiency, and promote sustainable growth.

PSR # 1890

1 2 3 40 41