/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Archived

Charlotte Water / Construction

FY22 Water/Sewer infrastructure Construction – Contract 2 – CA ... FY22 Water/Sewer infrastructure Construction – Contract 2 – CANCELLED

  • Posting Number: 2022-Q4(Oct-Dec)-CW-8080
  • Anticipated Posting Date: 2022-11-01
  • Last Updated: 11/09/22
Add to Calendar 2022-11-01 2022-11-01 FY22 Water/Sewer infrastructure Construction – Contract 2 – CANCELLED

Canceled – there is not an annual contract for this need for FY22

Archived

Charlotte Water / Construction

FY22 Water/Sewer infrastructure Construction – Contract 1 – CA ... FY22 Water/Sewer infrastructure Construction – Contract 1 – CANCELLED

  • Posting Number: 2022-Q4(Oct-Dec)-CW-8078
  • Anticipated Posting Date: 2022-11-01
  • Last Updated: 11/09/22
Add to Calendar 2022-11-01 2022-11-01 FY22 Water/Sewer infrastructure Construction – Contract 1 – CANCELLED

Cancelled – there is not an annual contract for this need for FY22

Archived

Charlotte Water / Construction

Briar Creek Phase 4 Sewer Pipeline Removal and Transfer – CANCEL ... Briar Creek Phase 4 Sewer Pipeline Removal and Transfer – CANCELLED

  • Posting Number: 2022-Q4(Oct-Dec)-CW-6842
  • Anticipated Posting Date: 2022-12-01
  • Last Updated: 11/09/22
Add to Calendar 2022-12-01 2022-12-01 Briar Creek Phase 4 Sewer Pipeline Removal and Transfer – CANCELLED

CANCELLED – This project has been consolidated with a currently advertised entry “Briar Creek and Paw Creek Sewer Rehabilitation“.

 

 

Archived

Aviation / Construction

Taxiway F Deicing Pad South Crossfield Package-2 Paving and Electrical ... Taxiway F Deicing Pad South Crossfield Package-2 Paving and Electrical (Construction)

  • Posting Number: 2022-Q4(Oct-Dec)-AVI-7131
  • Anticipated Posting Date: 2022-11-02
  • Last Updated: 11/02/22
Add to Calendar 2022-11-02 2022-11-02 Taxiway F Deicing Pad South Crossfield Package-2 Paving and Electrical (Construction)

This project consists of all pavement and lighting for the new taxiway extensions and deicing pad construction.  Specific work includes erosion control, asphalt paving, concrete paving, drainage installation, pavement markings, signage, conduit installation, electrical work, and associated miscellaneous items.

Archived

Charlotte Water / Commodities & Goods

Thickening and Dewatering Polymers (Cancel – Duplicate Entry)

  • Posting Number: 2022-Q4(Oct-Dec)-CW-1181
  • Anticipated Posting Date: 2022-11-01
  • Last Updated: 11/01/22
Add to Calendar 2022-11-01 2022-11-01 Thickening and Dewatering Polymers (Cancel – Duplicate Entry)

Solicitation for polymers that are necessary for the treatment and dewatering of solids removed from the water and wastewater treatment process.

Archived

Charlotte Water / Construction

FY23 Large Diameter/Sewer Service Contract #1 (Re-bid)

  • Posting Number: 2022-Q4(Oct-Dec)-CW-9469
  • Anticipated Posting Date: 2022-10-27
  • Last Updated: 10/28/22
Add to Calendar 2022-10-27 2022-10-27 FY23 Large Diameter/Sewer Service Contract #1 (Re-bid)

This contract will incorporate the installation of water and/or sanitary sewer services at a single address, water and/or sanitary sewer service dismantlement at a single address or a water/sanitary sewer main line extension. There maybe more than one water and/or sanitary sewer service installation , water and/or sanitary sewer service dismantlement at the same address. Additionally, a single commercial site with water and/or sanitary sewer services to be installed or water and/or sanitary sewer services to be dismantled at different addresses is to be considered one project for the entire commercial site.

Archived

Aviation / Commodities & Goods

Vertical Equipment Person Mobility Lifts and Install

  • Posting Number: 2022-Q4(Oct-Dec)-AVI-9330
  • Anticipated Posting Date: 2022-10-26
  • Last Updated: 10/27/22
Add to Calendar 2022-10-26 2022-10-26 Vertical Equipment Person Mobility Lifts and Install

The scope of this contract shall be to provide personal mobility equipment lifts and installation services for passenger boarding bridges.  Contract term will be 2 years. 

Archived

City Wide / Commodities & Goods

Emergency Bagged Ice

  • Posting Number: 2022-Q4(Oct-Dec)-CTW-9456
  • Anticipated Posting Date: 2022-10-10
  • Last Updated: 10/27/22
Add to Calendar 2022-10-10 2022-10-10 Emergency Bagged Ice

The City of Charlotte is looking to receive quotes for Emergency Bagged Ice.   The intent of this resulting contract is to be pre-positioned in the event a state of emergency has been declared by the Governor of North Carolina and/or a federally declared disaster area as designated by the Federal Emergency Management Agency (FEMA).  The Company would be required to deliver bags of ice and a merchandiser for storage to specified locations by a City department during the emergency event.

Archived

Department of General Services / Construction

Fire Station #36 HVAC Renovation

  • Posting Number: 2022-Q4(Oct-Dec)-DGS-9541
  • Anticipated Posting Date: 2022-10-04
  • Last Updated: 10/26/22
Add to Calendar 2022-10-04 2022-10-04 Fire Station #36 HVAC Renovation

The mechanical demolition work consists of removing the five (5) existing split system gas furnaces and outdoor air-conditioning condensers, and the one (1) inline exhaust fan above the men’s locker room. All existing ceiling diffusers and grilles shall be demolished and replaced inplace in new work. Existing split system controls, bipolar ionization devices, furnace terminations, and ductwork are to be kept and reused in the new work. The new mechanical work consists of installing five (5) new split system heat pumps and gas furnaces in the same place as demolished split systems, and reusing controls, bipolar ionization, existing furnace intakes/vents and reconnecting to existing gas. Outside air dampers will be adjusted to reduce outside air flow. Existing controls will need to be reworked to account for the change from cooling-only coils to heat-pump coils. A new, smaller, inline fan will be installed in place of demolished fan above men’s locker. New diffusers and grilles will be installed in-place of demolished diffusers and grilles

1 2 18 19 20 38 39