/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Charlotte Storm Water Services / Construction

Newell Stream Restoration Project

  • Posting Number: 2024-Q2(Apr-Jun)-CSWS-12167
  • Anticipated Posting Date: 2024-06-25
  • Last Updated: 12/12/23
Add to Calendar 2024-06-25 2024-06-25 Newell Stream Restoration Project

The Newell Stream Restoration Project is located near WT Harris Boulevard (NC 24) and Old Concord Road along a network of tributaries to Toby Creek. Project improvements include restoring approximately 2,500 LF of degraded stream channel, floodplain, and riparian buffer.

In Development

Charlotte Storm Water Services / Construction

Collective AG Storm Water Drainage Improvement Project

  • Posting Number: 2024-Q2(Apr-Jun)-CSWS-13371
  • Anticipated Posting Date: 2024-06-14
  • Last Updated: 12/06/23
Add to Calendar 2024-06-14 2024-06-14 Collective AG Storm Water Drainage Improvement Project

Collective Storm Drainage Improvement Projects Series AG will involve 2 projects throughout the City of Charlotte, 1845 Pinewood Cr and 6009 Rexwood Pl.  1845 Pinewood Cr will consist of reinforced concrete pipe replacement and realignment, CIPP liner, storm drainage structure replacement, full depth asphalt, curb and gutter, concrete driveway, new sanitary sewer pipe and sanitary sewer structures, and new watermain.  6009 Rexwood Pl will consist of reinforced concrete pipe replacement and realignment, CIPP liner, storm drainage structure replacement, full depth asphalt, curb and gutter, and concrete driveway.

In Development

Charlotte Storm Water Services / Construction

Collective W (Multiple Isolated Storm Drainage Improvements Projects)

  • Posting Number: 2024-Q2(Apr-Jun)-CSWS-9972
  • Anticipated Posting Date: 2024-04-15
  • Last Updated: 11/15/23
Add to Calendar 2024-04-15 2024-04-15 Collective W (Multiple Isolated Storm Drainage Improvements Projects)

This project consists of multiple isolated storm drainage improvements projects located throughout the City of Charlotte. Projects include storm drainage replacement and sewer relocations within the street right-of-way and private, residential properties.

In Development

Charlotte Storm Water Services / Construction

Collective V (Multiple Isolated Storm Drainage Improvements Projects)

  • Posting Number: 2024-Q2(Apr-Jun)-CSWS-9970
  • Anticipated Posting Date: 2024-04-15
  • Last Updated: 11/15/23
Add to Calendar 2024-04-15 2024-04-15 Collective V (Multiple Isolated Storm Drainage Improvements Projects)

This project consists of multiple isolated storm drainage improvements projects located throughout the City of Charlotte. Projects include storm drainage improvements and replacement and repair of existing storm drainage system facilities within the street right-of-way and private, residential properties.

In Development

Charlotte Storm Water Services / Construction

Laurel Avenue Storm Drainage Improvement Project

  • Posting Number: 2025-Q2(Apr-Jun)-CSWS-9836
  • Anticipated Posting Date: 2025-04-16
  • Last Updated: 11/15/23
Add to Calendar 2025-04-16 2025-04-16 Laurel Avenue Storm Drainage Improvement Project

This project is bordered by Laurel Avenue to the north, Dotger Avenue to the south, Randolph Road to the east and Hempstead Place to the west.  The existing drainage system consists of closed pipe systems.  This drainage system is currently undersized and street flooding has been reported on Colville Road and building flooding has been reported on Cranbrook Lane.

In Development

Charlotte Storm Water Services / Construction

Flintridge Dr (2831) Storm Drainage Improvement Project

  • Posting Number: 2024-Q2(Apr-Jun)-CSWS-3469
  • Anticipated Posting Date: 2024-05-04
  • Last Updated: 10/18/23
Add to Calendar 2024-05-04 2024-05-04 Flintridge Dr (2831) Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Archived

Department of General Services / Construction

Beatties Ford Rd (LaSalle- Oaklawn) Sidewalks Ph. 1

  • Posting Number: 2023-Q2(Apr-Jun)-DGS-8939
  • Anticipated Posting Date: 2023-06-30
  • Last Updated: 08/18/23
Add to Calendar 2023-06-30 2023-06-30 Beatties Ford Rd (LaSalle- Oaklawn) Sidewalks Ph. 1

This project will add sidewalks and amenities along Beatties Ford Rd between LaSalle St and Oaklawn Ave.

Archived

Charlotte Water / General Services

Coffee Service Solution

  • Posting Number: 2023-Q2(Apr-Jun)-CW-11601
  • Anticipated Posting Date: 2023-05-30
  • Last Updated: 08/03/23
Add to Calendar 2023-05-30 2023-05-30 Coffee Service Solution

Charlotte Water will seek a multi-year turn-key coffee service solution for its breakrooms in each applicable facility. The selected company will provide rental equipment (bean-to-cup and pod coffee makers), maintenance and repairs of the equipment, their full product selection, and related services such as refilling the equipment.

Archived

Department of General Services / General Services

Old City Town Hall Roof Replacement project

  • Posting Number: 2023-Q2(Apr-Jun)-DGS-11851
  • Anticipated Posting Date: 2023-06-23
  • Last Updated: 08/01/23
Add to Calendar 2023-06-23 2023-06-23 Old City Town Hall Roof Replacement project

Removal and disposal of all existing asphalt built-up roof system, metal flashings, and counter flashings. Existing metal wall panels and balustrades are to remain. Furnish and install new single ply PVC roof system consisting of new flat and tapered polyisocyanurate insulation, gypsum cover board, fully adhered 50 mil PVC membrane and all flashings, wood blocking and metal flashings. Furnish and install new liquid applied drain re-lining at two (2) existing overflow drains and drain leaders. Remove and reinstall all existing surveillance and electrical equipment needed to complete the reroofing work.  All disturbed rooftop equipment is be returned to original functionality after completion of the roofing project. Removal and disposal of all existing asphalt built-up roof system, metal flashings, counter flashings, gutters and downspouts. Furnish and install new single ply PVC roof system consisting of new flat and tapered polyisocyanurate insulation, gypsum cover board, fully adhered 60 mil PVC membrane and all flashings, wood blocking, metal flashings, gutters and downspouts. Remove existing metal roof panels in a manner that will allow for re- installation without damage. Install new high-temperature underlayment and re-install existing metal roof panels. Incorporate metal roof panels into above and below single ply roofing systems.

1 2 18 19 20 41 42