Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
Economic Development / General Services
Small Business Ecosystem Assessment and Implementation Services
Charlotte Storm Water Services / Construction
Hill Street Storm Drainage Improvement Project
The storm drainage improvement project is for the area in and around Hill Street. The construction project boundaries are Tryon Street to the southeast, Trade Street to the northeast, South Cedar Street and West 1st Street to the north, and Palmer Street to the southwest. The project includes storm drainage improvements that reduce house and street flooding or will repair failing infrastructure.
Department of General Services / Construction
Matheson Avenue Bridge Streetscape
This project will incorporate pedestrian, bicycle and bridge improvements on Matheson Avenue from North Tryon Street to Jordan Place. The project will include a westbound one-way bicycle path along the north side of Matheson Avenue and a two- way bicycle path and sidewalk along the south side. Both sides will include a three-foot buffer between the bicycle paths and the road.
Charlotte Storm Water Services / Construction
Foxrun/Burtonwood Storm Drainage Improvement Project
This project is bordered by Rama Road to the north, McAlpine Creek to the south, Monroe Road to the east and Burlwood Road to the west. The drainage system consists of open channel and closed pipe systems underneath City maintained roads. This was previously identified as a major capital project from the watershed ranking prioritization process with a score of 54 of 100. The ranking protocol identifies 30 structures that experience flooding in the 100-year storm event and 16 roads that experience transverse overtopping events that do not meet current standards. A holistic project is needed to cost beneficially address the drainage system issues.
Charlotte Storm Water Services / Construction
Chatham Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
Aviation / Construction
Concrete Slab Joint Seal – Project Cancelled
Concrete expansion joints are cuts in concrete slabs, or the joints between walls and concrete slabs, that go completely through the slab to the base material. The purpose of an expansion joint is to allow the concrete slab to expand and contract with temperatures changes, without cracking the slab. Expansion joints must be sealed with a flexible sealant, to prevent water from penetrating the joint and deteriorating the sub-base.
Charlotte Department of Transportation / Construction
Bridge Repairs
This project involves repairing bridge structures in various locations within the city limits. This work shall consist of furnishing all labor, equipment, and materials to repair noted structures. Work includes but not limited to: concrete pavement repairs, asphalt surface sealing / repair / replacement, debris removal, soil / erosion repairs, bridge substructure / superstructure repairs, expansion joint repair / replacement, barrier rail repairs, guardrail repairs, cleaning and painting bridge structures, sealing concrete wearing surface, culvert repairs, and repairs as deemed necessary by the engineer; removing, containment and disposal of existing materials; seeding and mulching all grassed areas disturbed; all incidental items necessary to complete the project as specified and shown on the Bridge Structures Repair Details and Drawings.
Charlotte Area Transit System / General Services
Blue Line – Tile Column Repairs
Repair tile columns at 11 Blue Line stations that were installed in 2007. Reasons for repair include vandalism, bullnose wear on top course causing tile failure, and other freeze/thaw issues.
PSR # 1488
Charlotte Area Transit System / General Services
Microtransit Dedicated Providers Cancelled
Contract multiple turnkey microtransit operators with dedicated fleet to operate multiple microtransit zones consistent with the adopted Envision My Ride Plan. FY 24 budget request covers initial software integration with CATS-Pass App ($35,000 estimated cost) plus the operation of up to four microtransit zones with up to seven dedicated vehicles ($2,212,021 estimated cost). Procurement process should allow for contract renewal and expansion of services annually consistent with approved operating budgets.
CANCELLED
PSR # 1487
The City of Charlotte’s Economic Development Department is seeking an experienced and knowledgeable consulting firm to conduct a comprehensive assessment and develop an implementation plan for the small business ecosystem in Charlotte to help increase equitable opportunities and address challenges/gaps in resources. This assessment and implementation plan is to provide an in-depth understanding of the challenges, opportunities, and key factors affecting small businesses in Charlotte.