/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Charlotte Mecklenburg Police Department / General Services

Community Policing Crisis Response Team Services

  • Posting Number: 2024-Q1(Jan-Mar)-CMPD-10941
  • Anticipated Posting Date: 2024-03-30
  • Last Updated: 01/12/24
Add to Calendar 2024-03-30 2024-03-30 Community Policing Crisis Response Team Services

The Charlotte-Mecklenburg Police Department’s (CMPD’s) Community Policing Crisis Response Team Services (CPCRT) was established to provide improved public safety and service through the deployment of Officers and licensed mental health clinicians. The objective of the CPCRT is to decrease the number of injuries and incarcerated mentally ill individuals by acting as an entry point into mental health treatment.

Archived

Charlotte Mecklenburg Police Department / Technology Goods & Services

CMPD Off-Duty Scheduling and Payment Software – RFP completed pl ... CMPD Off-Duty Scheduling and Payment Software – RFP completed please archive

  • Posting Number: 2022-Q1(Jan-Mar)-CMPD-7768
  • Anticipated Posting Date: 2022-03-22
  • Last Updated: 01/12/24
Add to Calendar 2022-03-22 2022-03-22 CMPD Off-Duty Scheduling and Payment Software – RFP completed please archive

The Charlotte-Mecklenburg Police Department (“CMPD”) will be seeking proposals from qualified service providers to provide Special Events and Secondary Employment scheduling software and payment system able to schedule and organize over 500,000 hours of jobs per year and process payment from vendor to employee.

Archived

Economic Development / General Services

Innovation-Driven Startup Accelerator Program

  • Posting Number: 2023-Q1(Jan-Mar)--12939
  • Anticipated Posting Date: 2023-01-02
  • Last Updated: 01/09/24
Add to Calendar 2023-01-02 2023-01-02 Innovation-Driven Startup Accelerator Program

Scope of Work

The selected partner will design and implement an accelerator program with multiple cohorts each year during the two-year period. The accelerator will assist entrepreneurs through modalities such as coaching, mentor meetings, networking events, pitch practice, and others to support them through funding or other significant milestones. The scope of the project includes but is not limited to:

  • Designing and launching a program of acceleration and/or pre-acceleration for startups
  • Build key community partnerships to ensure buy-in and collaboration with the ecosystem
  • Achieve engagement with underserved founder communities (ethnic minority and women)
  • Conduct outreach in the community to recruit applicants and necessary partners
  • Create connectivity between the Charlotte entrepreneurial community and capital sources
  • Build measurements and metrics to show impact and success of the program over time
  • Assist in messaging to build support for the program after the two-year project period

Prepare program participants for fundraising and achieving milestones post-graduation

Archived

Economic Development / General Services

Small Business Ecosystem Assessment and Implementation Services

  • Posting Number: 2024-Q1(Jan-Mar)--13552
  • Anticipated Posting Date: 2024-01-03
  • Last Updated: 01/04/24
Add to Calendar 2024-01-03 2024-01-03 Small Business Ecosystem Assessment and Implementation Services

The City of Charlotte’s Economic Development Department is seeking an experienced and knowledgeable consulting firm to conduct a comprehensive assessment and develop an implementation plan for the small business ecosystem in Charlotte to help increase equitable opportunities and address challenges/gaps in resources. This assessment and implementation plan is to provide an in-depth understanding of the challenges, opportunities, and key factors affecting small businesses in Charlotte.

In Development

Charlotte Storm Water Services / Construction

Hill Street Storm Drainage Improvement Project

  • Posting Number: 2025-Q1(Jan-Mar)-CSWS-3451
  • Anticipated Posting Date: 2025-01-01
  • Last Updated: 12/12/23
Add to Calendar 2025-01-01 2025-01-01 Hill Street Storm Drainage Improvement Project

The storm drainage improvement project is for the area in and around Hill Street.  The construction project boundaries are Tryon Street to the southeast, Trade Street to the northeast, South Cedar Street and West 1st Street to the north, and Palmer Street to the southwest. The project includes storm drainage improvements that reduce house and street flooding or will repair failing infrastructure.

Archived

Department of General Services / Construction

Matheson Avenue Bridge Streetscape

  • Posting Number: 2024-Q1(Jan-Mar)-DGS-4998
  • Anticipated Posting Date: 2024-01-03
  • Last Updated: 12/06/23
Add to Calendar 2024-01-03 2024-01-03 Matheson Avenue Bridge Streetscape

This project will incorporate pedestrian, bicycle and bridge improvements on Matheson Avenue from North Tryon Street to Jordan Place. The project will include a westbound one-way bicycle path along the north side of Matheson Avenue and a two- way bicycle path and sidewalk along the south side. Both sides will include a three-foot buffer between the bicycle paths and the road.

In Development

Charlotte Storm Water Services / Construction

Foxrun/Burtonwood Storm Drainage Improvement Project

  • Posting Number: 2025-Q1(Jan-Mar)-CSWS-9838
  • Anticipated Posting Date: 2025-03-04
  • Last Updated: 10/11/23
Add to Calendar 2025-03-04 2025-03-04 Foxrun/Burtonwood Storm Drainage Improvement Project

This project is bordered by Rama Road to the north, McAlpine Creek to the south, Monroe Road to the east and Burlwood Road to the west.  The drainage system consists of open channel and closed pipe systems underneath City maintained roads.  This was previously identified as a major capital project from the watershed ranking prioritization process with a score of 54 of 100.  The ranking protocol identifies 30 structures that experience flooding in the 100-year storm event and 16 roads that experience transverse overtopping events that do not meet current standards.  A holistic project is needed to cost beneficially address the drainage system issues.

 

In Development

Charlotte Storm Water Services / Construction

Chatham Storm Drainage Improvement Project

  • Posting Number: 2025-Q1(Jan-Mar)-CSWS-5451
  • Anticipated Posting Date: 2025-03-04
  • Last Updated: 10/11/23
Add to Calendar 2025-03-04 2025-03-04 Chatham Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Archived

Aviation / Construction

Concrete Slab Joint Seal – Project Cancelled

  • Posting Number: 2024-Q1(Jan-Mar)-AVI-12763
  • Anticipated Posting Date: 2024-03-29
  • Last Updated: 09/27/23
Add to Calendar 2024-03-29 2024-03-29 Concrete Slab Joint Seal – Project Cancelled

Concrete expansion joints are cuts in concrete slabs, or the joints between walls and concrete slabs, that go completely through the slab to the base material. The purpose of an expansion joint is to allow the concrete slab to expand and contract with temperatures changes, without cracking the slab. Expansion joints must be sealed with a flexible sealant, to prevent water from penetrating the joint and deteriorating the sub-base.

1 2 14 15 16 44 45