/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Charlotte Storm Water Services / Construction

Foxwood Road 2727 Storm Drain Improvement Project

  • Posting Number: 2024-Q4(Oct-Dec)-CSWS-7058
  • Anticipated Posting Date: 2024-10-02
  • Last Updated: 11/15/23
Add to Calendar 2024-10-02 2024-10-02 Foxwood Road 2727 Storm Drain Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

Archived

Charlotte Area Transit System / General Services

CATS Class and Compensation Study

  • Posting Number: 2023-Q4(Oct-Dec)-CATS-12706
  • Anticipated Posting Date: 2023-11-04
  • Last Updated: 11/09/23
Add to Calendar 2023-11-04 2023-11-04 CATS Class and Compensation Study

CATS is seeking a contractor to perform a comprehensive evaluation of all positions within the CATS pay structure of the organization. The study objectives are as follows:

      • Ensure positions with similar nature and complexity of work are appropriately classified within the proposed base pay hierarchy.
      • Provide salary recommendations that align with position responsibilities.
      • Provide career pathway recommendations that provide opportunities for compensation growth.
      • Provide pay differentials between classifications that are justifiable.
      • Maintain a competitive position with the external market while recognizing internal job worth hierarchies.

    – Classification Alignment: Ensure that all positions with similar job nature and complexity are correctly categorized within the proposed base pay hierarchy.
    – Salary Alignment: Offer salary recommendations that are in line with the respective responsibilities of each position.
    – Career Progression: Recommend career pathways that facilitate opportunities for compensation growth for our employees.
    – Justifiable Pay Differentials: Establish pay differentials between job classifications that are well-founded and reasonable.
    – Market Competitiveness: Maintain our competitive standing in the external job market while simultaneously acknowledging the internal hierarchy of job worth within our organization.

    By engaging a qualified contractor to carry out this evaluation, CATS aims to optimize our compensation practices, ensuring fairness, competitiveness, and alignment with industry standards and internal structures.

    The CATS Project Manager will furnish the Contractor with all necessary documentation, including pay ranges, job classifications, and any other pertinent information essential for the completion of the study.

    PSR # 1595

Archived

Charlotte Water / Construction

FY24 Sanitary Sewer Rehab and Replacement-CANCELLED

  • Posting Number: 2024-Q4(Oct-Dec)-CW-17263
  • Anticipated Posting Date: 2024-10-29
  • Last Updated: 11/07/23
Add to Calendar 2024-10-29 2024-10-29 FY24 Sanitary Sewer Rehab and Replacement-CANCELLED

The work is generally described as follows: rehabilitation of manholes, repair of sewer system defects and service laterals, installation of new sewers and manholes to replace existing sewers and manholes, installation of cured-in-place pipe lining, pipe bursting, other miscellaneous manhole rehabilitation work, and all preparatory work such as sewer cleaning and television inspection.

Cancelled as of 10/21/2024

Archived

Department of General Services / Construction

16th Street Streetscape Phase 2

  • Posting Number: 2023-Q4(Oct-Dec)-DGS-4996
  • Anticipated Posting Date: 2023-11-02
  • Last Updated: 11/07/23
Add to Calendar 2023-11-02 2023-11-02 16th Street Streetscape Phase 2

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

Archived

Aviation / Architectural / Engineering Services

On-Call Civil Engineering Consultant

  • Posting Number: 2023-Q4(Oct-Dec)-AVI-8671
  • Anticipated Posting Date: 2023-11-01
  • Last Updated: 11/06/23
Add to Calendar 2023-11-01 2023-11-01 On-Call Civil Engineering Consultant

Charlotte Douglas International Airport (CLT) is seeking statements of qualifications from professional engineering firms to provide task order engineering services. Services are expected to cover a range of smaller studies, conceptual designs, investigations, coordination processes and technical support of a limited nature.  This Engineering and Construction Task Order contract is focused largely but not exclusively on support to “horizontal/flat-work” design engineering and construction support services for engineering.

Archived

Charlotte Fire Department / Commodities & Goods

Ornamental Aluminum Fencing

  • Posting Number: 2023-Q4(Oct-Dec)-CFD-12940
  • Anticipated Posting Date: 2023-10-26
  • Last Updated: 10/30/23
Add to Calendar 2023-10-26 2023-10-26 Ornamental Aluminum Fencing

The Charlotte Fire Department is requesting a new contract for fencing installation services. Work to be performed under this contract is to furnish and install an approximately 960’x 8′ tall ornamental aluminum fence with four (4) single gates. The location of the fence will be in the back parking lot of the Charlotte Fire Department Headquarters.

Archived

Charlotte Storm Water Services / Construction

Glassy Creek/Brentwood/Parkwood Stream Restoration

  • Posting Number: 2023-Q4(Oct-Dec)-CSWS-3455
  • Anticipated Posting Date: 2023-10-17
  • Last Updated: 10/18/23
Add to Calendar 2023-10-17 2023-10-17 Glassy Creek/Brentwood/Parkwood Stream Restoration

This stream restoration construction project provides for the upgrading of lakes and ponds, dam repairs, and other improvements to reduce the level of pollution in stormwater.   The need for the project is based on the maintenance of facilities such as lakes and ponds that enhance stormwater quality under the requirements of the Clean Water Act.

Archived

Charlotte Area Transit System / General Services

BOD Fluid analysis

  • Posting Number: 2023-Q4(Oct-Dec)-CATS-12192
  • Anticipated Posting Date: 2023-10-02
  • Last Updated: 10/18/23
Add to Calendar 2023-10-02 2023-10-02 BOD Fluid analysis

BOD is requesting a contract for a vendor to conduct fluid analysis for the bus and paratransit fleet. Requesting a five (5) year contract. 3+1+1 estimating $50,000 annually

PSR # 1547

Archived

Aviation / General Services

Snow Removal of Aviation Parking Lots, Bus Shelters, and Bus Lanes

  • Posting Number: 2023-Q4(Oct-Dec)-AVI-12713
  • Anticipated Posting Date: 2023-10-03
  • Last Updated: 10/17/23
Add to Calendar 2023-10-03 2023-10-03 Snow Removal of Aviation Parking Lots, Bus Shelters, and Bus Lanes

Provide snow removal in the bus lanes located in Long Term 1 and 2 parking lots, Daily North parking lot, and employee 1 and 4 parking lots.  The contractor will use a skid steer type piece of equipment with a snow-plow blade.  The bus lanes will be plowed keeping them free from of snow and ice,

1 2 13 14 15 38 39