Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
Charlotte Storm Water Services / Construction
Rhodes SDIP
Charlotte Water / Construction
Service Water Improvements and Flow Meter Modifications
This project includes significant improvements to the existing service water system at the Franklin Water Treatment Plant. The scope of work involves the replacement of existing pumps, piping, valves, and backflow devices within the service water system. Additionally, new flow meters will be installed on the Franklin Water Treatment Plant service water system, while existing flow meters on the filter effluent lines at the Lee S. Dukes Water Treatment Plant will also be replaced. These upgrades are expected to enhance the accuracy of flow measurements and improve the efficiency of the service water system.
Department of General Services / Construction
Arrowood at Whitehall Commons Intersection
This is an intersection project which will involve installing a new traffic signal with pedestrian signals, widening some of the approaches, replacing all curb ramps, mill & overlay, and pavement markings. The traffic signal will use steel strain poles.
Charlotte Storm Water Services / Construction
Faulconbridge Rd 5749 Project
Project consists of lining 556 LF of 42 inch CMP and 131 LF of 15 inch RCP with CIPP. Eight existing drainage structures will be removed and replaced and two additional structures will be added. 221 LF of 15″ RCP will be removed and replaced. Chemical grouting joint repair will also be installed at approx. 15 locations throughout the 42″ CMP.
Aviation / Construction
FBO FUEL LINE REPAIR – Archived
Remove and replace fuel lines servicing the FBO fuel cabinet, flush and abandon fuel lines that previously served
Bank of America; remove and crate two fueling cabinets; miscellaneous repairs to fuel tank farm.
Charlotte Storm Water Services / Construction
Collective Storm Drainage Improvement Project Series K
Collective Storm Drainage Improvement Project (SDIP) Series K contains three separate storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures (standard and non-standard), storm drainpipe systems, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, water and sewer (relocations, installations and adjustments), foundation protection and any other associated work required by the Engineer.
Aviation / Construction
South End-Around Taxiway (SEAT)
As part of the Fourth Parallel Runway Program at CLT, an end-around taxiway is required at the south end of new Runway 1C-19C and existing Runway 18C-36C. This project will construct the South End-Around Taxiway (SEAT). The project includes erosion and sedimentation control, grading, drainage, retaining wall construction, airfield concrete and asphalt paving, marking, and airfield lighting/signage to construct the SEAT. The new taxiway will meet FAA Taxiway Design Group (TDG) 5 requirements.
Charlotte Area Transit System / Commodities & Goods
BOD bulk fluids
BOD is requesting a 5 year contract (3+1+1) for bus bulk fluids.
Fluid Specifications:
PSR # 1689
Charlotte Water / General Services
Mass Notification System Maintenance & Repair Services
Charlotte Water is seeking Proposals for a Company(ies) to provide Services for two (2) types of Mass Notification System Maintenance and Repair Services: Scheduled Services and On-Call Services.
All work locations will be at water treatment facilities and remote pumping stations within the Charlotte Water service area, which includes the City of Charlotte city limits, unincorporated City areas, and some towns in Mecklenburg County.
Rhodes SDIP is a minor bid project that was created to address the service request at 3738 Rhodes and is located on the City project dashboard.