/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Charlotte Water / Construction

McAlpine Wastewater Management Facility – Preliminary and Primar ... McAlpine Wastewater Management Facility – Preliminary and Primary Treatment Facilities Rehabilitation

  • Posting Number: 2025-Q4(Oct-Dec)-CW-17881
  • Anticipated Posting Date: 2025-10-10
  • Last Updated: 07/16/25
Add to Calendar 2025-10-10 2025-10-10 McAlpine Wastewater Management Facility – Preliminary and Primary Treatment Facilities Rehabilitation

The project includes mechanical, electrical, instrumentation, and structural rehabilitation of preliminary and primary treatment facilities at the McAlpine Creek WWMF. The facilities generally include Screenings Removal, Primary Clarifiers, Gravity Thickeners, Flow Equalization Storage, Flow Equalization Pumping, and Chemical Storage. These improvements will enhance operational reliability and efficiency.

In Development

Charlotte Water / Construction

McAlpine Wastewater Management Facility – Biosolids Treatment Fa ... McAlpine Wastewater Management Facility – Biosolids Treatment Facilities Reliability – Construction Package 1

  • Posting Number: 2025-Q4(Oct-Dec)-CW-17883
  • Anticipated Posting Date: 2025-10-10
  • Last Updated: 07/16/25
Add to Calendar 2025-10-10 2025-10-10 McAlpine Wastewater Management Facility – Biosolids Treatment Facilities Reliability – Construction Package 1

Construction Package 1 includes mechanical, electrical, instrumentation, and structural rehabilitation of Digested Sludge Storage Tanks 1 and 2 and their Control Building. The project aims to improve the reliability and performance of biosolids treatment processes. These upgrades will ensure continued compliance with regulatory requirements and operational efficiency.

In Development

Charlotte Water / General Services

Sugar Creek Storage Tanks Cleanout

  • Posting Number: 2025-Q4(Oct-Dec)-CW-17940
  • Anticipated Posting Date: 2025-10-15
  • Last Updated: 07/16/25
Add to Calendar 2025-10-15 2025-10-15 Sugar Creek Storage Tanks Cleanout

This contract includes cleaning out storage tanks at the Sugar Creek facility. The work will remove accumulated debris and ensure the tanks remain in good working condition. This maintenance is to extend the lifespan of these critical infrastructure assets.

In Development

Charlotte Water / Construction

McDowell Knife Gate Valve

  • Posting Number: 2025-Q4(Oct-Dec)-CW-17936
  • Anticipated Posting Date: 2025-11-15
  • Last Updated: 07/16/25
Add to Calendar 2025-11-15 2025-11-15 McDowell Knife Gate Valve

This contract includes the replacement of IPS knife gate valves at McDowell. The work will ensure continued reliability and functionality of the infrastructure. This involves installing functioning valves for operational control within the system.

In Development

Charlotte Water / Construction

McAlpine WWTP Biosolids Treatment Facility Reliability

  • Posting Number: 2025-Q4(Oct-Dec)-CW-14162
  • Anticipated Posting Date: 2025-10-31
  • Last Updated: 07/16/25
Add to Calendar 2025-10-31 2025-10-31 McAlpine WWTP Biosolids Treatment Facility Reliability

This will be an Invitation to Bid for Charlotte Water. This project will involve the rehabilitation of Biosolids Treatment Facilities. Facilities generally include digesters, digester control buildings, biogas conditioning facilities, digested sludge storage tanks, and dewatering buildings.

In Development

Charlotte Water / General Services

Field Surveying Services (Geographic Information Systems Group and Cap ... Field Surveying Services (Geographic Information Systems Group and Capacity Assurance Program)

  • Posting Number: 2025-Q4(Oct-Dec)-CW-14816
  • Anticipated Posting Date: 2025-10-31
  • Last Updated: 07/16/25
Add to Calendar 2025-10-31 2025-10-31 Field Surveying Services (Geographic Information Systems Group and Capacity Assurance Program)

This opportunity involves providing survey services to support Charlotte Water’s GIS and Capacity Assurance Programs, including the following tasks:

Review available data and consult with the City to clarify and define the City’s requirements.
Obtain necessary information, conduct investigations, and make reasonable efforts for the Surveyor to become familiar with the philosophy and purpose of each project.
Identify and analyze requirements from governmental authorities with jurisdiction and assist the City in obtaining the required approvals.

In Development

Charlotte Storm Water Services / Construction

Crestmont Drive (4724) Storm Drainage Improvement Project

  • Posting Number: 2025-Q4(Oct-Dec)-CSWS-3471
  • Anticipated Posting Date: 2025-10-15
  • Last Updated: 07/14/25
Add to Calendar 2025-10-15 2025-10-15 Crestmont Drive (4724) Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

In Development

Aviation / Construction

CLT Center Storm Drainage Project

  • Posting Number: 2025-Q4(Oct-Dec)-AVI-10761
  • Anticipated Posting Date: 2025-12-01
  • Last Updated: 07/14/25
Add to Calendar 2025-12-01 2025-12-01 CLT Center Storm Drainage Project

This project is located in a parking lot behind the CLT Center located at 5601 Wilkinson Boulevard in Charlotte, NC.  The purpose of the project is to install new pipe to contain and drain runoff from the building to an existing storm drainage system at the rear of the parking lot.  The work involves installation of reinforced concrete pipe, storm drainage structures, asphalt surface, and re-striping the parking lot within the construction corridor.

In Development

Aviation / Construction

Concourse E – Phase 10

  • Posting Number: 2025-Q4(Oct-Dec)-AVI-17339
  • Anticipated Posting Date: 2025-10-01
  • Last Updated: 07/14/25
Add to Calendar 2025-10-01 2025-10-01 Concourse E – Phase 10

This project consists of a single-story addition to concourse E just south of aircraft envelope E4 and adjacent to the employee turnstile. The addition is primarily a shell space to be leased to a tenant or stakeholder for the final buildout. The base bid is for a 4,350 Square Feet (SF) addition and associated site work with two add alternates to increase the total SF by an additional 1,400 SF per alternate. Scopes of work that are included in this project but not limited to are: selective demolition, concrete SOG, structural steel, metal decking, miscellaneous steel fabrications, rough carpentry, PVC roofing and sheet metal, insulated core metal wall panels, waterproofing, joint sealants, HM doors and frames, door hardware, glazing, non-structural framing, gypsum board, acoustical panel ceilings, sheet carpeting, resilient base and accessories, painting, pre-engineered interior wall panel systems, resinous terrazzo flooring, signage, wall protective coverings, corner guards, fire protection specialties, plumbing, HVAC, electrical, fire sprinkler & telecommunications.

1 2 4 5