/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Department of General Services / Construction

Mallard Creek Road Shared-Use Path (Governor Hunt to Driwood)

  • Posting Number: 2026-Q3(Jul-Sep)-DGS-17368
  • Anticipated Posting Date: 2026-07-01
  • Last Updated: 02/03/25
Add to Calendar 2026-07-01 2026-07-01 Mallard Creek Road Shared-Use Path (Governor Hunt to Driwood)

This project will construct a shared-use path along the east side of Mallard Creek Road from Governor Hunt Road to Driwood Court. Specific improvements will also include construction of a plant strip, curb and cutter, accessible ramps, driveways, and potential storm drainage improvements. The purpose of this project is to improve pedestrian safety, mobility, and connectivity along Mallard Creek Road. Project Length = 0.4 miles.

In Development

Charlotte Department of Transportation / General Services

Transportation Asset Inventory

  • Posting Number: 2025-Q3(Jul-Sep)-CDT-16826
  • Anticipated Posting Date: 2025-07-01
  • Last Updated: 01/31/25
Add to Calendar 2025-07-01 2025-07-01 Transportation Asset Inventory

The chosen vendor will provide a segmented inventory of the following transportation assets.

  1. City-maintained roadways.
  2. Traffic control signs and supports on selected state and all city roadways.
  3. Pavement markings on selected state and all city roadways.
  4. Sidewalks and accessible ramps on city roadways
  5. Other vertical elements within the roadway such as tubular delineators, curbing, medians etc.

A condition analysis of the assets will be included with the inventory The analysis will provide a database of information that will be utilized for work management as well as emergency services during hazardous conditions. 

The vendor will provide separate ESRI geodatabases with each asset category.  Specific table schemas for each asset will be determined prior to data collection.

In Development

Charlotte Department of Transportation / Construction

2025 Pavement Marking Maintenance

  • Posting Number: 2026-Q3(Jul-Sep)-CDT-16961
  • Anticipated Posting Date: 2026-07-01
  • Last Updated: 01/21/25
Add to Calendar 2026-07-01 2026-07-01 2025 Pavement Marking Maintenance

This is a contract to install pavement markings on a list of city streets. The work includes, Thermoplastic, Polyurea, and Cold Applied Plastic markings.

In Development

Department of General Services / General Services

Vehicle Accessories and Up-fitting

  • Posting Number: 2025-Q3(Jul-Sep)-DGS-17303
  • Anticipated Posting Date: 2025-08-01
  • Last Updated: 09/04/24
Add to Calendar 2025-08-01 2025-08-01 Vehicle Accessories and Up-fitting

The City of Charlotte requires qualified light vehicle dealers and general service providers to work in conjunction with the Fleet Management Division to support the city’s various up-fitting needs including but not limited to window tenting, bed liner installing, lift gates, and truck bed shells.

In Development

Aviation, Department of General Services / General Services

Vehicle and Equipment Welding and Related Services

  • Posting Number: 2025-Q3(Jul-Sep)-AVI-17304
  • Anticipated Posting Date: 2025-07-01
  • Last Updated: 09/04/24
Add to Calendar 2025-07-01 2025-07-01 Vehicle and Equipment Welding and Related Services

The City requires a company to work in conjunction with Fleet Management, the Airport and other city departments to provide Vehicle and Equipment Welding and Related Services to the City of Charlotte. The Company shall perform vehicle or equipment maintenance, repair, and modification through the provision of Vehicle and Equipment Welding and Related services for vehicles and equipment owned, operated, or maintained by the City.

In Development

Charlotte Storm Water Services / Construction

Magnolia/Winthrop Storm Drainage Improvement Project

  • Posting Number: 2025-Q3(Jul-Sep)-CSWS-17297
  • Anticipated Posting Date: 2025-07-28
  • Last Updated: 08/21/24
Add to Calendar 2025-07-28 2025-07-28 Magnolia/Winthrop Storm Drainage Improvement Project

The Magnolia/Winthrop Storm Drainage Improvement Project (SDIP) consists of storm water infrastructure improvements along Ideal Way, Winthrop Avenue and Springdale Avenue. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, water and sewer (relocations, installations and adjustments), traffic control and any other associated work required by the Engineer.

 

In Development

Charlotte Storm Water Services / Construction

Pella Rd 6212 Project

  • Posting Number: 2025-Q3(Jul-Sep)-CSWS-17295
  • Anticipated Posting Date: 2025-07-04
  • Last Updated: 08/21/24
Add to Calendar 2025-07-04 2025-07-04 Pella Rd 6212 Project

Project consist of joint repairs and the lining of 563 LF of 66 CMP with CIPP.  Three non-standard and three standard structures will be removed/replaced as well as two headwalls.  57 LF of 24 inch RCP will be removed and replaced. A rip rap apron will be revised/installed.  70 LF of an 8″ water main will also be relocated.

In Development

Charlotte Storm Water Services / Construction

Queens Storm Drainage Improvement Project

  • Posting Number: 2025-Q3(Jul-Sep)-CSWS-17294
  • Anticipated Posting Date: 2025-07-30
  • Last Updated: 08/21/24
Add to Calendar 2025-07-30 2025-07-30 Queens Storm Drainage Improvement Project

The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Queens Storm Drainage Improvement Project (SDIP) area.

The Queens Storm Drainage Improvement Project is bordered by East 4th Street to the north, Baxter Street to the south, Caswell Road to the east and Baldwin Avenue to the west.  This project area is within a drainage area of approximately 40 acres and the improvements will include pipe system upgrades and channel improvements.

In Development

Charlotte Storm Water Services / Construction

Zone 3 Stomwater and Site Improvements

  • Posting Number: 2024-Q3(Jul-Sep)-CSWS-12300
  • Anticipated Posting Date: 2024-08-01
  • Last Updated: 07/25/24
Add to Calendar 2024-08-01 2024-08-01 Zone 3 Stomwater and Site Improvements

This construction will improve site conditions at the Zone 3 Field Operation facility. Construction work will include stormwater settling basins, stormwater conveyance, and various site improvements. The design is already complete.

1 2 5 6 7 8