/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Charlotte Water / General Services

McDowell Lime 2nd Structure Exterior Rehabilitation

  • Posting Number: 2025-Q3(Jul-Sep)-CW-17942
  • Anticipated Posting Date: 2025-07-31
  • Last Updated: 03/18/25
Add to Calendar 2025-07-31 2025-07-31 McDowell Lime 2nd Structure Exterior Rehabilitation

This project involves rehabilitation of the exterior of McDowell Lime Structure 2. The work will include repairs, repainting, and other necessary maintenance to protect the structure from environmental wear. This upkeep is to ensure the longevity of the facility.

In Development

Charlotte Water / General Services

Reclaimed Water Pumping Capacity Improvements at Mallard

  • Posting Number: 2025-Q3(Jul-Sep)-CW-17938
  • Anticipated Posting Date: 2025-07-31
  • Last Updated: 03/18/25
Add to Calendar 2025-07-31 2025-07-31 Reclaimed Water Pumping Capacity Improvements at Mallard

This contract will provide services to improve reclaimed water pumping capacity at the Mallard facility. The improvements will enhance system efficiency and support increased demand for reclaimed water usage. Upgrades will include pump replacements and infrastructure modifications.

In Development

Charlotte Water / General Services

Site Clean-Up

  • Posting Number: 2025-Q3(Jul-Sep)-CW-17934
  • Anticipated Posting Date: 2025-07-31
  • Last Updated: 03/18/25
Add to Calendar 2025-07-31 2025-07-31 Site Clean-Up

This contract will provide for the removal of industrial waste and debris from various Charlotte Water sites. Work may include hazardous material handling and environmental remediation as required. Proper site clean-up ensures compliance with environmental regulations and maintains safe working conditions.

In Development

Charlotte Water / Architectural / Engineering Services

Sewer Trunkline Modeling

  • Posting Number: 2025-Q3(Jul-Sep)-CW-17932
  • Anticipated Posting Date: 2025-07-31
  • Last Updated: 03/18/25
Add to Calendar 2025-07-31 2025-07-31 Sewer Trunkline Modeling

This project involves sewer trunkline modeling to support odor control efforts within the wastewater collection system. The model will help optimize system performance and identify areas where odor mitigation strategies are needed. The goal is to enhance system efficiency while minimizing odor impacts on surrounding communities.

In Development

Charlotte Water / General Services

Landscape Management

  • Posting Number: 2025-Q3(Jul-Sep)-CW-17929
  • Anticipated Posting Date: 2025-07-31
  • Last Updated: 03/18/25
Add to Calendar 2025-07-31 2025-07-31 Landscape Management

This contract will provide landscaping services at various Charlotte Water locations. Work may include mowing, tree trimming, and general upkeep of facility grounds. The task is to maintain these areas, improving site aesthetics and safety.

In Development

Charlotte Water / Construction

McAlpine Large Diameter Sewer Rehabilitation – Phase 2

  • Posting Number: 2025-Q3(Jul-Sep)-CW-17898
  • Anticipated Posting Date: 2025-08-28
  • Last Updated: 03/18/25
Add to Calendar 2025-08-28 2025-08-28 McAlpine Large Diameter Sewer Rehabilitation – Phase 2

This project involves the rehabilitation of approximately 7,000 linear feet of reinforced concrete pipe (RCP) sewer outfall. The sewer outfall is located just south of Highway 51, running parallel to McAlpine Creek. The work will improve the structural integrity and performance of the sewer system.

Archived

Charlotte Water / Architectural / Engineering Services

Upper Little Sugar Creek Interceptor Design-cancelled

  • Posting Number: 2025-Q3(Jul-Sep)-CW-12252
  • Anticipated Posting Date: 2025-08-15
  • Last Updated: 03/18/25
Add to Calendar 2025-08-15 2025-08-15 Upper Little Sugar Creek Interceptor Design-cancelled

Design of Upper Little Sugar Creek Interceptor (at least Phase 1 from Wastewater Treatment Plant to East Boulevard).  The complete project extends from Sugar Creek Wastewater Treatment Plant to Sugar Creek Rd.

this project has been cancelled

In Development

Charlotte Storm Water Services / Construction

6th and Graham Storm Drainage Improvement Project

  • Posting Number: 2026-Q3(Jul-Sep)-CSWS-3467
  • Anticipated Posting Date: 2026-08-13
  • Last Updated: 03/18/25
Add to Calendar 2026-08-13 2026-08-13 6th and Graham Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

In Development

Charlotte Water / Commodities & Goods

Water Treatment Polymer Trials

  • Posting Number: 2025-Q3(Jul-Sep)-CW-17289
  • Anticipated Posting Date: 2025-08-18
  • Last Updated: 03/14/25
Add to Calendar 2025-08-18 2025-08-18 Water Treatment Polymer Trials

The scope of this Invitation to Bid (ITB) is to establish a contract for the purchase, delivery, and other inherently related activities of liquid emulsion polymer for solids dewatering for Charlotte Water’s Franklin WTP in compliance with the specifications and terms and conditions set forth in this ITB.

Polymer Trials will take place prior to receiving bids for the polymer. All Products and parts furnished under the Contract shall be new, shall comply with the specifications and terms and conditions set forth in this ITB, and shall operate in full compliance with the Specifications.

1 2 4 5 6 7