/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Active

Aviation / Architectural / Engineering Services

Program Management Support and Advisory Services for CLT

  • Posting Number: 2025-Q3(Jul-Sep)-AVI-17493
  • Anticipated Posting Date: 2025-07-01
  • Last Updated: 07/09/25
Add to Calendar 2025-07-01 2025-07-01 Program Management Support and Advisory Services for CLT

This scope of work outlines the program management, advisory services, design management, and project controls services to support Charlotte Douglas International Airport (CLT) in the planning, executing, and monitoring of capital improvement projects, ensuring efficient delivery within budget and compliance with strategic goals and regulatory requirements.

In Development

Aviation / Construction

Part 139 Remediation & Runway Redesignation

  • Posting Number: 2025-Q3(Jul-Sep)-AVI-17228
  • Anticipated Posting Date: 2025-08-25
  • Last Updated: 07/09/25
Add to Calendar 2025-08-25 2025-08-25 Part 139 Remediation & Runway Redesignation

The project includes markings and signage to support updating the Runway Nomenclature of CLT’s existing three parallel runways to support the construction of the Fourth Parallel Runway. The Runway Nomenclature updates will be planned under 3 different charting dates with FAA throughout the project that will be coordinated with the FAA charting schedule. The project will also include updates to existing taxiway marking, signage, lighting and paved shoulders.

In Development

Charlotte Water / Construction

Service Water Improvements and Flow Meter Modifications

  • Posting Number: 2025-Q3(Jul-Sep)-CW-17350
  • Anticipated Posting Date: 2025-07-31
  • Last Updated: 07/09/25
Add to Calendar 2025-07-31 2025-07-31 Service Water Improvements and Flow Meter Modifications

This project includes significant improvements to the existing service water system at the Franklin Water Treatment Plant. The scope of work involves the replacement of existing pumps, piping, valves, and backflow devices within the service water system. Additionally, new flow meters will be installed on the Franklin Water Treatment Plant service water system, while existing flow meters on the filter effluent lines at the Lee S. Dukes Water Treatment Plant will also be replaced. These upgrades are expected to enhance the accuracy of flow measurements and improve the efficiency of the service water system.

In Development

Charlotte Water / Construction

McAlpine Creek WRRF  Digesters Rehabilitation 

  • Posting Number: 2027-Q3(Jul-Sep)-CW-18600
  • Anticipated Posting Date: 2027-07-15
  • Last Updated: 07/09/25
Add to Calendar 2027-07-15 2027-07-15 McAlpine Creek WRRF  Digesters Rehabilitation 

The McAlpine Digesters Rehabilitation project focuses on restoring key components of the biosolids treatment facilities. This includes structural repairs and a new cover for the first digested sludge storage tank, along with installation of new sludge pumps, valves, and piping. The project also replaces an outdated programmable logic controller system and adds a new sludge line to separate gravity-fed and pumped flows. Additional improvements include a new dewatering well system for draining the storage tanks and structural evaluation and repairs to the second digested sludge storage tank.

 

 

 

 

 

 

 

 

 

 

In Development

Charlotte Water / Construction

McDowell Creek WRRF  Digesters Rehabilitation 

  • Posting Number: 2027-Q3(Jul-Sep)-CW-18608
  • Anticipated Posting Date: 2027-07-11
  • Last Updated: 07/09/25
Add to Calendar 2027-07-11 2027-07-11 McDowell Creek WRRF  Digesters Rehabilitation 

This will be an Invitation to Bid for Charlotte Water. The project will involve the rehabilitation of biosolids treatment facilities at the McDowell Creek Water Resource Recovery Facility. Work will focus on existing digesters and may include structural repairs, floor regrouting, replacement of mechanical components, and upgrades to valves and associated piping. Electrical and instrumentation systems will be reconnected or replaced as needed to support restored operations. These improvements aim to enhance the performance, safety, and reliability of the digester systems and associated infrastructure.

 

 

 

 

 

Active

Aviation / General Services

RFP AVIA 25-38 Flooring Services

  • Posting Number: 2025-Q3(Jul-Sep)-AVI-18054
  • Anticipated Posting Date: 2025-07-01
  • Last Updated: 06/30/25
Add to Calendar 2025-07-01 2025-07-01 RFP AVIA 25-38 Flooring Services

Charlotte Douglas International Airport is seeking a firm to provide flooring services that may include but not limited to demolition, removal, repair, installation, preparation of carpet, vct, ceramic tile, quarry tile, base, and specialty floors as well as the removal and installation of cove base. The intent of this solicitation is to select one or multiple companies to provide flooring services for various Airport properties on an on-call as needed basis.

In Development

Aviation / Construction

Aircraft Rescue and Firefighting Facility (ARFF)

  • Posting Number: 2025-Q3(Jul-Sep)-AVI-12926
  • Anticipated Posting Date: 2025-08-30
  • Last Updated: 06/24/25
Add to Calendar 2025-08-30 2025-08-30 Aircraft Rescue and Firefighting Facility (ARFF)

This project will construct a new Aircraft Rescue and Firefighting Facility (ARFF) at Charlotte Douglas International Airport.  The facility will be constructed in a green field site within the airfield.  The general scope of the project includes site preparation (grading and drainage), building construction, HVAC, plumbing, asphalt parking lot and roadway paving, electrical, and associated utilities.  This project is anticipated to be solicited as a Construction Manager at Risk (CMAR) alternate procurement method.

In Development

Aviation / Architectural / Engineering Services

Airport Surveillance Radar and Center Lighting Vault Relocation (Desig ... Airport Surveillance Radar and Center Lighting Vault Relocation (Design)

  • Posting Number: 2025-Q3(Jul-Sep)-AVI-17240
  • Anticipated Posting Date: 2025-09-02
  • Last Updated: 06/23/25
Add to Calendar 2025-09-02 2025-09-02 Airport Surveillance Radar and Center Lighting Vault Relocation (Design)

The Center Lighting Vault Relocation Project will relocate the existing lighting vault, located at the Mid-Field area at CLT Airport to a new proposed location. The project will consist of site work, building work, site utilities, and airfield lighting circuitry.

The selected Final Design Engineer or Engineer of Record (EOR or Consultant) will produce construction documents to be issued for competitive bidding of one or multiple construction packages, followed by Conformed or Released for Construction Plans issued to the responsive or responsible bidder for Construction.  The design and documents are to be based on preliminary design or bridging documents prepared by the Owner’s Master Civil Engineer (Aviation Consulting Engineers, LLC, or ACE).  The preliminary design effort will include completion of the Design Geotechnical Subsurface Investigation, preliminary design plans to a 30% level of completion, pavement design, and preliminary surveys.  Final Design surveys, including pavement tie-ins, etc. will be the responsibility of the Consultant.

In Development

Charlotte Area Transit System / Construction

CTC Fare Zone Striping

  • Posting Number: 2025-Q3(Jul-Sep)-CATS-18408
  • Anticipated Posting Date: 2025-09-06
  • Last Updated: 06/23/25
Add to Calendar 2025-09-06 2025-09-06 CTC Fare Zone Striping

The Charlotte Area Transit System (CATS) anticipates contracting out the following work:

The CTC Fare Zone Striping project is a part off safety and security improvements at the Charlotte Transportation Center that will include the installation of the following approximate quantities of heated-in-place thermoplastic markings:
-950 linear feet of customized 2′-wide blue striping labeled with “FARE ZONE”;
-470 linear feet of pedestrian crosswalk (8 separate crosswalks); and
-920 linear feet of safety yellow striping for 23 bus bays.
Other additional work includes the installation of 31 yellow truncated domes, removal of existing crosswalk striping, and providing 121 linear feet of additional blue “FARE ZONE” striping to be turned over to CATS.

Heat-in-place thermoplastic will be installed per NCDOT specifications. The crosswalk and truncated dome will match the City of Charlotte Land Development Standards.

PSR # 1917

1 2 4 5 6 48 49