Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Archived

Charlotte Storm Water Services / Construction

Storm Water Repair and Improvement FY2022-A

  • Posting Number: 2021-Q3(Jul-Sep)-CSWS-6276
  • Anticipated Posting Date: 2021-08-05
  • Last Updated: 08/18/21
Add to Calendar 2021-08-05 2021-08-05 Storm Water Repair and Improvement FY2022-A

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.

Archived

Charlotte Department of Transportation / Construction

Graham Street Intelligent Transportation System (ITS) Project

  • Posting Number: 2021-Q3(Jul-Sep)-CDT-6386
  • Anticipated Posting Date: 2021-08-16
  • Last Updated: 08/17/21
Add to Calendar 2021-08-16 2021-08-16 Graham Street Intelligent Transportation System (ITS) Project

This project will install approximately 2.5 miles of 72 count single-mode fiber optic cable installed in mostly existing conduit. There are also small portions of new directionally bored, hand-dug, and trenched conduit. This project includes entrances and communications equipment for six existing traffic signal control cabinets and the installation of seven traffic management cameras. The project limits are North Graham Street beginning at West Sugar Creek Road to Mallard Creek Road to West WT Harris Boulevard. This project includes fiber optic cable splicing, testing, Ethernet equipment communications, and traffic management cameras and equipment.

Archived

Charlotte Fire Department / General Services

CFD Promotional Processes

  • Posting Number: 2021-Q3(Jul-Sep)-CFD-5389
  • Anticipated Posting Date: 2021-07-16
  • Last Updated: 08/17/21
Add to Calendar 2021-07-16 2021-07-16 CFD Promotional Processes

This contract is for the provision of a qualified Company to assist the City of Charlotte Fire Department (CFD) with yearly rank testing, specifically developing and implementing the testing materials for yearly Promotional Processes for the ranks of Entry Level (EL), Fire Fighters (FF), Captain, Engineer, Battalion Chief, and Division Chief.  Multiple processes may be run over the course of a calendar year depending upon the needs of CFD.

Archived

Charlotte Water / Construction

FY22 Manhole Rehabilitation

  • Posting Number: 2021-Q3(Jul-Sep)-CW-6330
  • Anticipated Posting Date: 2021-08-12
  • Last Updated: 08/16/21
Add to Calendar 2021-08-12 2021-08-12 FY22 Manhole Rehabilitation

Charlotte Water maintains over 100,000 sanitary sewer manholes. This contract will be utilized for the repair and renewal of sanitary sewer manholes. Rehabilitation efforts from this contract are expected to reduce inflow within Charlotte Water’s collection system.

Archived

Charlotte Storm Water Services / Architectural / Engineering Services

Professional Engineering Services for Various Storm Water Services Pro ... Professional Engineering Services for Various Storm Water Services Projects

  • Posting Number: 2021-Q3(Jul-Sep)-CSWS-6201
  • Anticipated Posting Date: 2021-08-16
  • Last Updated: 08/16/21
Add to Calendar 2021-08-16 2021-08-16 Professional Engineering Services for Various Storm Water Services Projects

Charlotte-Mecklenburg Storm Water Services is requesting proposals from qualified companies interested in providing Professional Engineering Services for Various Storm Water Services Projects.  Services will be needed for the following two scopes of work:

Unspecified Minor Storm Drainage Improvement Projects

Work may include but is not necessarily limited to initiating new projects or the review and completion of an existing project’s activities already in progress. Minor drainage projects are the ones defined to average in total construction cost between $50,000 to $500,000 each.

Active Major Storm Drainage Improvement Projects

Work includes the review and completion of an existing project’s activities already in progress. Scoping on these projects is anticipated to begin in 2021. The specific projects will be identified in the Request for Qualifications.

Archived

Charlotte Department of Transportation / Construction

East Boulevard Intelligent Transportation System (ITS) Project

  • Posting Number: 2021-Q3(Jul-Sep)-CDT-6317
  • Anticipated Posting Date: 2021-08-10
  • Last Updated: 08/13/21
Add to Calendar 2021-08-10 2021-08-10 East Boulevard Intelligent Transportation System (ITS) Project

This project will install approximately 1.53 miles of 36 count single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for four existing traffic control cabinets and the installation of four traffic management cameras. The project limits are East Boulevard beginning at Queens Road West to Euclid Avenue. This project also includes fiber splicing, testing, Ethernet equipment communications, and traffic management cameras and equipment.

Archived

Charlotte Storm Water Services / Construction

Storm Water Repair and Improvement FY 2022-D

  • Posting Number: 2021-Q3(Jul-Sep)-CSWS-6299
  • Anticipated Posting Date: 2021-08-10
  • Last Updated: 08/13/21
Add to Calendar 2021-08-10 2021-08-10 Storm Water Repair and Improvement FY 2022-D

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.

Archived

Charlotte Storm Water Services / Construction

Storm Water Repair and Improvement FY 2022-C

  • Posting Number: 2021-Q3(Jul-Sep)-CSWS-6297
  • Anticipated Posting Date: 2021-08-10
  • Last Updated: 08/13/21
Add to Calendar 2021-08-10 2021-08-10 Storm Water Repair and Improvement FY 2022-C

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.

Archived

Charlotte Storm Water Services / Construction

Storm Water Repair and Improvement FY 2022-B

  • Posting Number: 2021-Q3(Jul-Sep)-CSWS-6278
  • Anticipated Posting Date: 2021-08-05
  • Last Updated: 08/13/21
Add to Calendar 2021-08-05 2021-08-05 Storm Water Repair and Improvement FY 2022-B

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.