/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Archived

Charlotte Water / General Services

Misc Plumbing Services – Cancelled

  • Posting Number: 2020-Q3(Jul-Sep)-CW-1194
  • Anticipated Posting Date: 2020-07-01
  • Last Updated: 11/09/20
Add to Calendar 2020-07-01 2020-07-01 Misc Plumbing Services – Cancelled

Provide scheduled plumbing Services for Private/Street Mains

Archived

Charlotte Water / Commodities & Goods

Copper Tubing-Cancelled

  • Posting Number: 2020-Q3(Jul-Sep)-CW-1189
  • Anticipated Posting Date: 2020-07-01
  • Last Updated: 11/09/20
Add to Calendar 2020-07-01 2020-07-01 Copper Tubing-Cancelled

Solicitation for different sizes of copper tubing to be used for installation and repair of water services.

Archived

Charlotte Water / Commodities & Goods

Online Water Quality Analyzers-Cancelled

  • Posting Number: 2020-Q3(Jul-Sep)-CW-1313
  • Anticipated Posting Date: 2020-07-01
  • Last Updated: 11/09/20
Add to Calendar 2020-07-01 2020-07-01 Online Water Quality Analyzers-Cancelled

Supply Water Treatment lab with Water Quality Analyzers

Archived

Charlotte Water / Commodities & Goods

Water and Sewer Materials

  • Posting Number: 2019-Q3(Jul-Sep)-CW-1137
  • Anticipated Posting Date: 2019-07-29
  • Last Updated: 11/09/20
Add to Calendar 2019-07-29 2019-07-29 Water and Sewer Materials

Provide various size pipe fittings, clamps, and related items to maintain and repair more than 8,000 miles of pipe and 70 pump stations.

Archived

Charlotte Water / General Services

HVAC PM & Repair Service

  • Posting Number: 2020-Q3(Jul-Sep)-CW-1183
  • Anticipated Posting Date: 2020-07-07
  • Last Updated: 11/09/20
Add to Calendar 2020-07-07 2020-07-07 HVAC PM & Repair Service

Provide HVAC Preventative Maintenance & Repair service to multiple Charlotte Water locations

Archived

Charlotte Water / Commodities & Goods

Gas Monitoring and Detection Instruments

  • Posting Number: 2020-Q3(Jul-Sep)-CW-1187
  • Anticipated Posting Date: 2020-07-01
  • Last Updated: 11/09/20
Add to Calendar 2020-07-01 2020-07-01 Gas Monitoring and Detection Instruments

Provide gas monitoring equipment and calibrate equipment for all Charlotte Water locations

Archived

Charlotte Water / General Services

Elevator Maintenance & Repair Service

  • Posting Number: 2020-Q3(Jul-Sep)-CW-1199
  • Anticipated Posting Date: 2020-08-31
  • Last Updated: 11/09/20
Add to Calendar 2020-08-31 2020-08-31 Elevator Maintenance & Repair Service

Provide elevator maintenance and repair service to Charlotte Water locations

 

 

This project was cancelled, as Charlotte Water will use the city-wide elevator contracts.

Archived

Charlotte Water / General Services

Flow Monitoring Services

  • Posting Number: 2020-Q3(Jul-Sep)-CW-1192
  • Anticipated Posting Date: 2020-07-01
  • Last Updated: 11/09/20
Add to Calendar 2020-07-01 2020-07-01 Flow Monitoring Services

Solicitation for the supply, installation, maintenance, monitoring, and reporting of flow meters and rain gauges at temporary and permanent locations throughout sewer system.

Archived

Department of General Services / Construction

Charlotte-Mecklenburg Government Center (CMGC) Generator Replacement

  • Posting Number: 2020-Q3(Jul-Sep)-DGS-2555
  • Anticipated Posting Date: 2020-09-29
  • Last Updated: 10/30/20
Add to Calendar 2020-09-29 2020-09-29 Charlotte-Mecklenburg Government Center (CMGC) Generator Replacement

The project consists of replacing two (2) 475 kVA emergency paralleled generators in the sub-plaza level of the Government Center. The existing generators along with the existing paralleling gear, exhaust, fuel, cooling, and branch circuit systems shall be demolished and replaced. In detail these include, but are not limited to: two (2) existing radiators in the pit adjacent to the generator room, the existing paralleling gear, the exhaust piping stack up to the roof level, all existing cooling and fuel piping, the existing fuel pumps, and all electrical branch circuit for ancillary generator loads. The existing generators shall be removed in such a manner as to ensure they can be resold by the general contractor for a credit back to the City. Two (2) new CAT emergency-rated 500 kVA generators (purchased directly by the City) shall be installed along with a new 2000 amp, 480/277V switchboard (also purchased directly by the City), which shall replace the existing paralleling switchboard. The new generators shall be equipped with onboard paralleling technology. New control wiring shall be provided and installed to two (2) new annunciators and the existing building management system at the security desk adjacent to the elevator lobby on the sub-plaza level of the facility. A 1MW temporary generator shall be provided and installed by the electrical contractor adjacent to the street and exterior wall of the generator room to provide temporary backup power coverage while the existing gear systems are demolished and replaced. The general contractor is required to provide a construction schedule and participate in necessary pre-construction and construction progress meetings during the duration of the project. The City shall provide a commissioning agent to develop all commissioning scripts and testing procedures at the conclusion of construction activities. The General Contractor shall be responsible for all necessary materials and labor  necessary for the performance of the scripted commissioning activities.

1 2 33 34 35 36