Earlybird, Business Opportunity Pipeline, City of Charlotte

/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Archived

Charlotte Area Transit System / Construction, General Services

Security Booth/Guard House

  • Posting Number: 2022-Q3(Jul-Sep)-CATS-5258
  • Anticipated Posting Date: 2022-07-01
  • Last Updated: 07/11/22
Add to Calendar 2022-07-01 2022-07-01 Security Booth/Guard House

REBID – CATS is requesting a Request For Proposal for the purchase of four Security Booths. This will include: Installation and Site Preparation Services for Pre-Engineered / Prefabrication Guard House; Ancillary Services related to Pre-Engineered / Prefabricated Buildings and Structures; Construction/Installation of a stationary Security Booth/Guard House with HVAC, LED lighting interior and exterior.

Security Booths/Guard Houses will be located at: Arrowood Station; Pelton Street (VMF rear gate); North Davidson, McGill Street.

PSR 1058

Archived

Charlotte Water / Technology Goods & Services

Customer Self Service Solution: Mobile Application and Web Portal

  • Posting Number: 2022-Q3(Jul-Sep)-CW-8094
  • Anticipated Posting Date: 2022-07-01
  • Last Updated: 07/08/22
Add to Calendar 2022-07-01 2022-07-01 Customer Self Service Solution: Mobile Application and Web Portal

The purpose of this RFP is to select a water-focused customer portal that will replace the https://mycitizenservices.org website and provide a single point of access for customers to access specific water-centric functions.

CLTWater is requesting proposals from qualified companies for the design, integration, and implementation of a CSS (customer self-service) water-focused self-service portal.

Archived

Charlotte Department of Transportation / General Services

Citywide Trip Hazard Removal Services

  • Posting Number: 2022-Q3(Jul-Sep)-CDT-2788
  • Anticipated Posting Date: 2022-08-01
  • Last Updated: 06/07/22
Add to Calendar 2022-08-01 2022-08-01 Citywide Trip Hazard Removal Services

The Charlotte Department of Transportation (CDOT) Street Maintenance Division (SMD) is responsible for the maintenance of more than 2,200 miles of sidewalks and more than 7,000 accessible ramps within the City of Charlotte.  The scope of this work consists of the removal of concrete tripping hazards from sidewalks, curb ramps, and concrete curbing that the City agents have identified.  All work produced must be compliant with the Americans with Disabilities Act (ADA) requirements for slope and Occupational Safety and Health Administration requirements for traction.  The company will be responsible for all traffic control in accordance with the most recent Work Area Traffic Control Handbook (WATCH).   Any debris resulting from the removal of trip hazards must be removed in a legal manner.

Archived

Charlotte Area Transit System / Construction

Replacement of the North Davidson Bus Wash

  • Posting Number: 2022-Q3(Jul-Sep)-CATS-4095
  • Anticipated Posting Date: 2022-07-01
  • Last Updated: 05/31/22
Add to Calendar 2022-07-01 2022-07-01 Replacement of the North Davidson Bus Wash

CATS is requesting to replace one drive through vehicle wash (bus wash) unit with a new more efficient drive through vehicle wash (bus wash) to be placed inside the existing wash building. The unit will be replacing a single drive through wash bay in a two drive through wash bay system located at 929 North Davidson Street, Charlotte NC 28206. Site work to include demolition, mobilization, staging, removal and on site storage (CATS provided) of removed vehicle wash (bus wash). Demolition/Equipment Removal: Remove and properly store/dispose (CATS discretion) of the existing drive through vehicle wash.

 

PSR-910

Archived

Charlotte Storm Water Services / Construction

911 Georgetown Storm Drainage Improvement Project

  • Posting Number: 2021-Q3(Jul-Sep)-CSWS-5443
  • Anticipated Posting Date: 2021-09-07
  • Last Updated: 01/19/22
Add to Calendar 2021-09-07 2021-09-07 911 Georgetown Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Archived

Aviation / Construction

Carolina Aviation Museum Hangar Restoration – CANCELLED

  • Posting Number: 2022-Q3(Jul-Sep)-AVI-7129
  • Anticipated Posting Date: 2022-08-15
  • Last Updated: 01/14/22
Add to Calendar 2022-08-15 2022-08-15 Carolina Aviation Museum Hangar Restoration – CANCELLED

This project’s purpose is to provide a ‘shell restoration’ of the Historic 1938 Aircraft Hangar located on CLT property and will include adaptive reuse of the hangar to maintain the local historic designation and bring the structure up to code making it shell space ready for future interior upfit.

Archived

Charlotte Department of Transportation / Construction

Graham Street Extension Intelligent Transportation Systems

  • Posting Number: 2021-Q3(Jul-Sep)-CDT-1689
  • Anticipated Posting Date: 2021-09-30
  • Last Updated: 11/03/21
Add to Calendar 2021-09-30 2021-09-30 Graham Street Extension Intelligent Transportation Systems

This project will install single‐mode fiber optic cable in existing conduits. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

Archived

Charlotte Fire Department / Commodities & Goods

Fire PT Uniforms

  • Posting Number: 2021-Q3(Jul-Sep)-CFD-6488
  • Anticipated Posting Date: 2021-09-22
  • Last Updated: 10/27/21
Add to Calendar 2021-09-22 2021-09-22 Fire PT Uniforms

The Charlotte Fire Department (CFD) provides physical fitness training uniforms to all new and current employees on an annual basis for required on-the-job physical training and recruit school.  The uniform items consists of sweatshirts, sweat pants, training shorts, and tee shirts.  The uniforms will require screen-printing of the CFD logos onto the garments.  Short sleeve and long sleeve tee shirts are also provided as part of the employee’s uniform allotment.  This will be a contract for a period of three years with the option to extend the contract for two additional one-year terms.

Archived

Charlotte Water / Construction

McAlpine Creek Wastewater Management Facility Waste Activated Sludge E ... McAlpine Creek Wastewater Management Facility Waste Activated Sludge Equalization and Blending and Odor Control Improvements

  • Posting Number: 2021-Q3(Jul-Sep)-CW-6221
  • Anticipated Posting Date: 2021-09-16
  • Last Updated: 10/26/21
Add to Calendar 2021-09-16 2021-09-16 McAlpine Creek Wastewater Management Facility Waste Activated Sludge Equalization and Blending and Odor Control Improvements

The Waste Activated Sludge (WAS) Equalization and Blending and Odor Control Improvements Project includes upgrades to several facilities at the McAlpine Creek Wastewater Management Facility (WWMF). Primary components include construction of a new cast in place concrete WAS equalization structure with multiple tanks/cells with mixers and pumps to allow for equalization and blending of WAS from the McAlpine Creek WWMF, Sugar Creek Wastewater Treatment Plant (WWTP) and in the future the Irwin Creek WWTP. Adjacent to this structure is a blending basin pump station which will convey blended WAS to the existing solids treatment process and in the future to the planned Thermal Hydrolysis Process. In addition, the project includes a new wet scrubber chemical odor control system for the Screening and Grit Facility, new duct work to this system from the south plant primary clarifiers and gravity thickeners as well as the rehabilitation of the Consolidated Influent Pump Station (CIPS) odor scrubber system.

1 2 32 33 34 47 48