/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Archived

Charlotte Department of Transportation / Construction

East Boulevard Intelligent Transportation System (ITS) Project

  • Posting Number: 2021-Q3(Jul-Sep)-CDT-6317
  • Anticipated Posting Date: 2021-08-10
  • Last Updated: 08/13/21
Add to Calendar 2021-08-10 2021-08-10 East Boulevard Intelligent Transportation System (ITS) Project

This project will install approximately 1.53 miles of 36 count single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for four existing traffic control cabinets and the installation of four traffic management cameras. The project limits are East Boulevard beginning at Queens Road West to Euclid Avenue. This project also includes fiber splicing, testing, Ethernet equipment communications, and traffic management cameras and equipment.

Archived

Charlotte Storm Water Services / Construction

Storm Water Repair and Improvement FY 2022-D

  • Posting Number: 2021-Q3(Jul-Sep)-CSWS-6299
  • Anticipated Posting Date: 2021-08-10
  • Last Updated: 08/13/21
Add to Calendar 2021-08-10 2021-08-10 Storm Water Repair and Improvement FY 2022-D

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.

Archived

Charlotte Storm Water Services / Construction

Storm Water Repair and Improvement FY 2022-C

  • Posting Number: 2021-Q3(Jul-Sep)-CSWS-6297
  • Anticipated Posting Date: 2021-08-10
  • Last Updated: 08/13/21
Add to Calendar 2021-08-10 2021-08-10 Storm Water Repair and Improvement FY 2022-C

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.

Archived

Charlotte Storm Water Services / Construction

Storm Water Repair and Improvement FY 2022-B

  • Posting Number: 2021-Q3(Jul-Sep)-CSWS-6278
  • Anticipated Posting Date: 2021-08-05
  • Last Updated: 08/13/21
Add to Calendar 2021-08-05 2021-08-05 Storm Water Repair and Improvement FY 2022-B

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.

Archived

Charlotte Area Transit System / Commodities & Goods

CATS Bus AC and Heating Parts

  • Posting Number: 2021-Q3(Jul-Sep)-CATS-6197
  • Anticipated Posting Date: 2021-08-09
  • Last Updated: 08/11/21
Add to Calendar 2021-08-09 2021-08-09 CATS Bus AC and Heating Parts

CATS Bus Operations Division is in need of supplier to provide Bus Air Conditioning & Heating Parts.  A sample list of needed parts include: compressors, heating coils, condenser units, a/c motors, temperature sensors, expansion & discharge valves, etc.

 

877

Archived

Innovation & Technology / Technology Goods & Services

Strategic Business Technology Roadmap Services

  • Posting Number: 2021-Q3(Jul-Sep)-IT-6284
  • Anticipated Posting Date: 2021-08-10
  • Last Updated: 08/11/21
Add to Calendar 2021-08-10 2021-08-10 Strategic Business Technology Roadmap Services

The City is seeking consultant knowledgeable and experienced in the use of business information systems and technology best practice methodologies to conduct a needs assessment and prepare a strategic plan to serve as a road map for addressing the short and long-term technology business systems needs of the City. The plan should contain clear goals and action items that will move the City forward and should be structured in a manner that allows for ease and clarity of implementation by staff and other resources. The Company shall conduct a study of current infrastructure and systems, offer recommendations, determine whether a different direction might improve business continuance strategies, and to discover ways to improve efficiencies.

Archived

Charlotte Area Transit System / General Services

CATS MOW – Special Track Work Contractor

  • Posting Number: 2021-Q3(Jul-Sep)-CATS-6107
  • Anticipated Posting Date: 2021-07-22
  • Last Updated: 08/04/21
Add to Calendar 2021-07-22 2021-07-22 CATS MOW – Special Track Work Contractor

CATS is looking for a contractor to surface interlockings to maintain proper track geometry. The vendor must have the machinery to tamp through switches and crossings. Surfacing equipment must have the ability to tamp, lift, level, and line in order to remove existing faults in longitudinal and alignment faults in the track. This will be a slow process as the track geometry is constantly changing as the machine moves through the switch. Typically, it takes around 1 to 1.30 hours to complete a single switch, due to the cabling and condition. CATS will provide a pilot that will help with track access. The vendor is responsible to ensure all machines can safely traverse the alignment, specs, and diagrams for the alignment will be available from CATS if needed. Vendors will need to be RWPP certified that will be given by CATS personnel before the shift begins.

PSR 1149

Archived

City Attorney’s Office / Architectural / Engineering Services

Legal, Demography, and GIS Services for Election Redistricting

  • Posting Number: 2021-Q3(Jul-Sep)-CAO-6243
  • Anticipated Posting Date: 2021-08-04
  • Last Updated: 08/04/21
Add to Calendar 2021-08-04 2021-08-04 Legal, Demography, and GIS Services for Election Redistricting

The City is seeking a service provider to assist with its decennial redistricting process.  The City envisions that the service provider will provide legal, demography, and GIS (Geographic Information System) services.  It is expected that more than one firm may work together jointly on a single Proposal. It is strongly preferred that the lead company or prime contractor for any Proposal be a law firm with attorneys licensed to practice in the state of North Carolina.  While the City is flexible with respect to certain elements of the Project, the City has specific requirements and preferences for the Services.

​Charlotte has a council-manager form of government with a mayor and 11 council members elected every two years in November. The mayor and four council members are elected at-large by a city-wide vote. Seven council members are elected from districts by voters who reside in each district.  Elections typically occur in odd-numbered years (e.g., 2017, 2019), and the City was due to have Council elections in November of 2021.

The City generally engages in the redistricting process for the seven districts after the release of the decennial census conducted by the U.S. government.  However, the census data for 2020 has been delayed, making the redistricting process impracticable.  As a result, the state legislature enacted legislation, S.L. 2021-56, to delay the regular November 2021 elections until April 2022.  The 2020 Census data is expected to be provided by the U.S. Census Bureau in September 2021.  Per S.L. 2021-56, the City is required to complete redistricting by November 12, 2021, and if this date cannot be met, then by December 17, 2021.  Candidates must file for elections shortly after the redistricting is complete, with primary elections scheduled for March 8, 2022.

 

Archived

Aviation / Construction

Overflow Lots 1 and 2 Crack Sealing (Construction)

  • Posting Number: 2021-Q3(Jul-Sep)-AVI-5747
  • Anticipated Posting Date: 2021-07-08
  • Last Updated: 08/03/21
Add to Calendar 2021-07-08 2021-07-08 Overflow Lots 1 and 2 Crack Sealing (Construction)

This project will consist of approximately 75,000 LF (not to exceed) of crack sealing in Overflow Parking, Lots 1 & 2.

The contractor will properly remove/clean vegetation and debris from cracks and hot pour crack seal in running/random cracks throughout each lot.
Heavily alligator cracked areas will be excluded in lieu of asphalt patching under separate contract.  These areas will be identified on site prior to commencement of work.   Cleaning and sealing of concrete at concrete/asphalt joints (at curbs and islands) are not included.
Parking Lots will be empty and clear of vehicles during this work

1 2 30 31 32 39 40