Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
Charlotte Area Transit System / General Services
CATS MOW Track Vegetation Spray Services
Charlotte Department of Transportation / Commodities & Goods
Ready Mix Concrete with Portland Cement
Ready mix concrete and cement products are used in the maintenance, repair and installation of sidewalks, curbs and gutters, driveways, traffic signal cabinet foundations, pedestrian signal foundations, and accessible ramps. This is to provide Ready Mix Concrete w/Portland Cement and/or cement product to the Charlotte Department of Transportation (CDOT), Street Maintenance Division (SMD). All materials provided are to be either delivered by the successful bidder to specified job sites, or picked up at the successful bidders plant, by city-owned vehicles.
Aviation / Architectural / Engineering Services
4th Parallel Runway (Design)
The Final Engineer of Record will start their services at 30%, by utilizing preliminary plans from the Master Civil Engineer. CLT may select multiple engineering firms to work on the various aforementioned project elements.
Aviation / Construction
Concourse E Gate E5/E5-A Modifications
Modifications-renovations minor changes to existing hold room and the exterior of building. A new door to the exterior of the building, steel walkway ramp from the building down to the ramp, new electrical and data and security work associated with the new door.
Department of General Services / Construction
I-85 North Bridge
This project will construct a bridge over I-85 to directly connect Doug Mayes Place and Louis Rose Place. This will relieve congestion a the WT Harris Blvd/ I-85 and Mallard Creek Church Rd/ I-85 interchanges.
Aviation / Construction
Concourse E – Hot Water Piping Relocation
This project is to relocate the heating hot water piping from under the ramp pavement and concourse floor and reconnect in the terminal ceiling space. 60% night work, 40% daytime work. Project term will be 150 days.
Charlotte Storm Water Services / Construction
Water Oak Storm Drainage Improvement Project
The project area covers approximately 115 acres is roughly bounded by Hartness Avenue to the north, Walker Road and Emory Lane to the east, Sir Winston’s Place, Night Heron Lane, and Addison Drive to the west, and Stafford Circle to the south. The project includes storm drain improvement including culvert replacements, repair of aging and deteriorating storm drains by way of pipe system upgrades, and channel improvements. The project also includes water line upgrades and sanitary sewer relocations along with road resurfacing and seeding in affected project areas.
|
Charlotte Water / Construction
Field Operations Zone 2 Facility, Vacuum Truck Receiving Station
This project consists of constructing a new Vacuum Truck Receiving Station, a new canopy extension over existing concrete-walled material storage bays, and appurtenant facilities at the Charlotte Water Field Operations Operation Zone 2 Facility.
Charlotte Water / Construction
Zone 1 HVAC Rehabilitation (CANCELLED)
This project will be adding freeze protection to the two warehouse spaces that are approximately 30,000 square feet. The space currently has no permanent means of heat. The completed project will include several space heaters, piping, and electrical controls. This will also include a storage pad and outdoor bulk propane tank which will fuel the heaters.
This Request for Proposal will be for vegetation management of 40 miles CATS Rail Operations track. This area includes double main track, storage tracks and yard tracks. The railroad vegetation management is to protect the LYNX rail passengers and CATS infrastructure, as well as preserving a stable balance with the environment and surrounding natural resources. The vegetation management will consist of two track vegetation sprays a year. The spraying will be on track, off track areas within the storage yards, sub stations and signal houses.